Columbia County is committed to ensuring accessibility to this website regardless of disability. If anyone encounters a feature on this website that is inaccessible due to a disability, please contact the County Manger’s Office and the Columbia County Board of County Commissioners at (386) 758-1005. You may also email that office at patrick_weaver@columbiacountyfla.com and provide a brief description of the inaccessible feature. The County will either correct the inaccessible feature or, if correction is not possible due to technical limitations, provide the desired information through alternative means.

Skip to content

Columbia County, FL | Permit Details

New Commercial Construction Permit
Address 608 SW MARVIN BURNETT RD, BUILDING #GYM
LAKE CITY, FL 32025
Parcel #: 08110-000
Acres: 25.15
Owner: New Generation Christian Ministry Inc
Subdivision: Gym
Zoning: RSF-2
Flood Zone: X
District: 5
Application #: 47674
Permit #: 000040910
Related Permit:
Submitted: Thursday, November 12, 2020
Issued: Thursday, November 19, 2020
Expires: Wednesday, May 19, 2021
Completed: Wednesday, May 19, 2021
Status: Completed
Septic Release? Yes
Notes:
SE0619 SPECIAL EXCEPTION APPROVED, TO EXPAND AN EXISTING SPECIAL EXCEPTION SE0521. SITE MUST BE BUILT AND COMPLY TO THE APPROVED SPECIAL EXCEPTION SE0619, GYM BUILDING (ELEMENTARY SCHOOL BUILDING PERMIT 40306) ELEVATION CONFIRMATION LETTER REC'D AT 162.01'
Job Details
This is the construction of a: School Accessory Building
Describe commercial use: School Gym
Heated Area (Sqft) 5000
Total Area (Sqft) 5000
Stories 1
Building Height 18
Driveway access to property: Existing Drive
Is there a Fire Sprinkler System? No
Building Code Construction Type V
Building Code Element B
Building Code Occupancy Types Assembly
Occupancy Use Title Gym A-3
Design Occupant Load 205
Setbacks Front 25'
Setback Side 1 10'
Setback Side 2 10'
Setback Rear 15'
Septic# (00-0000) or (X00-000) 20-0887
Dev Permit # F023-
Building Code Edition Florida Building Code 2017 6th Edition & 2014 National Electrical Code
Elevation regulation Site & Development Plan
Finished floor requirement 162'
Requirement needed By Nailing Inspection
Document needed is a Surveyor letter giving the Finished Floor Elevation
Document receieved Yes
Fema map number 12023C0292D
In floodway N
Review Notes
10/29/2020 Application pending.
11/13/2020 Zoning Review - Reviewed
11/18/2020 Zoning Review - Reviewed
11/18/2020 Final Review - Documents Required
11/18/2020 Plan Review - Reviewed
11/19/2020 Permit Issued Permit #000040910 created and approved.
Contractors
Name/ Business License Title Role
Stephen M Douglas
Dmc Construction Inc
County License & State License & Liability Insurance & Workers Comp Expired.
CGC1514350 Cert. General Contractor
Derrick L Williams
Dl Williams Heating & Cooling Llc
CAC1816913 Class "b" A/c Contractor Subcontractor
Everton D Ruddock
D&s Lighting Inc
EC13003800 Electrical Contractor Subcontractor
Don C Bills Sr
Hometown Plumbing Services Llc
Liability Insurance & Workers Comp & Employees Workers Comp Expired.
CFC1428890 Plumbing Contractor Subcontractor
Inspections
Inspection Notes Performed By Date
Septic Release Inspection Health Dept 11/17/2020
Passed: Fire - Plan Review Jeff Crawford 11/18/2020
Passed: Electrical - 1st Underground Rough–In Troy Crews 11/19/2020
Passed: Plumbing/Gas - 1st Underground Rough–In Troy Crews 11/19/2020
Passed: Engineering - Setbacks Troy Crews 11/20/2020
Failed: Building - Monolithic Slab Poured Prior To Inspection, Stop Work Until Engineer Letter Approving Slab Received Troy Crews 11/20/2020
Passed: Building - Monolithic Slab Approved Based On Engineer Letter Troy Crews 11/23/2020
Passed: Engineering - Setbacks Troy Crews 11/23/2020
Passed: Electrical - Above Ceiling Troy Crews 3/11/2021
Passed: Electrical - 2nd Rough-In Troy Crews 3/11/2021
Passed: Mechanical - Rough In Troy Crews 3/11/2021
Passed: Plumbing/Gas - 2nd Rough-In Troy Crews 3/11/2021
Passed: Electrical - Permanent Power Troy Crews 3/25/2021
Release to power company Troy Crews 3/25/2021
Passed: Fire - Fire Final Tad Cervantes 3/31/2021
Passed: Building - Final Pending Zoning Final, Also No Occupancy Until Punch List Items Done, Sink Wraps, Grading Near Doors Etc. Troy Crews 4/1/2021
Passed: Engineering - Zoning Final Brandon Stubbs 4/5/2021
Certificate-Release Certificate Items Are Done Troy Crews 5/19/2021
Documents
File Name Date File Size
Original Permit 20201119.pdf 2023.12.26 44.74kB
911 Address Form 20201102 154420.pdf 2023.12.26 164.13kB
Owner And Contractor Signature Page 20201105 110827.pdf 2023.12.26 316.83kB
Recorded Noc.pdf 2023.12.26 599.13kB
Power Release-electrical-permanent Power 20210325.pdf 2023.12.26 38.81kB
Structural Metal Building Plans 20201105 110800.pdf 2023.12.26 1.86MB
Approved Foundation Plans 47674 2020-11-17 14.46.09.872.pdf 2023.12.26 781.42kB
Septic Approval Paperwork 20201112 051646.pdf 2023.12.26 596.96kB
New Generation School - Availability Letter 2020-11-18 14.57.36.637.pdf 2023.12.26 80.38kB
Blue Prints_floorplan 20201105 105840.pdf 2023.12.26 21.58MB
Detail By Entity Name 2020-11-18 11.33.54.819.pdf 2023.12.26 86.02kB
Subcontractor Form 20201112 103951.pdf 2023.12.26 192.73kB
Civil Plans 20201102 154421.pdf 2023.12.26 10.12MB
Slab Approval New Generation Gym Building 2020-11-23 07.27.26.848.pdf 2023.12.26 601.54kB
Contractor Letter Of Authorization 20201102 154424.pdf 2023.12.26 185.24kB
Property Appraiser Parcel Details Printed Page 20201105 110755.pdf 2023.12.26 4.08MB
Lidar Map 2020-11-18 12.11.23.83.pdf 2023.12.26 244.01kB
Surveyor Elevation Confirmation Letter 40910 2021-03-04 17.13.12.788.pdf 2023.12.26 325.26kB
Permit Application Page.pdf 2023.12.26 202.33kB
Recorded Deed 20201102 154425.pdf 2023.12.26 188.45kB
Foundation Plans 20201102 154420.pdf 2023.12.26 748.17kB
Certificate Of Occupancy 20210519.pdf 2023.12.26 54.72kB
Site Plan 20201105 110757.pdf 2023.12.26 10.12MB