Inspection |
Notes |
Performed By |
Date |
Passed: Building - Footer |
Clean Out Ca E In Spots |
Troy Crews |
11/12/2020 |
Passed: Engineering - Setbacks |
|
Troy Crews |
11/12/2020 |
Passed: Electrical - Temporary Service |
|
Troy Crews |
12/10/2020 |
Release to power company |
|
Troy Crews |
12/10/2020 |
Passed: Plumbing/Gas - 1st Underground Rough–In |
|
Troy Crews |
12/10/2020 |
Passed: Building - Slab |
|
Troy Crews |
12/16/2020 |
Release to power company |
Clay Electric Says They Did Not Recieve |
Melissa Garber |
12/30/2020 |
Passed: Building - Roof Decking |
|
Anthony Aslan |
1/27/2021 |
Failed: Building - Ext Strapping/Wall Sheathing |
Plans Call For 3" On Edge. Missing Nails Where Green Paint |
|
1/27/2021 |
Passed: Building - Framing |
Draftstop Block Broken In Entryway |
Matt Forsyth |
2/19/2021 |
Passed: Electrical - 2nd Rough-In |
|
Matt Forsyth |
2/19/2021 |
Passed: Plumbing/Gas - 2nd Rough-In |
|
Matt Forsyth |
2/19/2021 |
Failed: Mechanical - Rough In |
Need Weatherstripping On All Register's And Stove. Vent Needs Male End Down |
Matt Forsyth |
2/19/2021 |
Passed: Building - Ext Strapping/Wall Sheathing |
|
Matt Forsyth |
2/19/2021 |
Passed: Building - Insulation |
|
Matt Forsyth |
2/25/2021 |
Passed: Mechanical - Rough In |
|
Matt Forsyth |
2/25/2021 |
Passed: Electrical - Permanent Power |
Need Septic Release. |
Anthony Aslan |
5/3/2021 |
Release to power company |
|
Anthony Aslan |
5/3/2021 |
Septic Release Inspection |
|
Health Dept |
5/4/2021 |
Failed: Building - Final |
1) No Final Termite Sticker
2) Bath Fans Located In Showers Need To Be Gfci Protected
3)hall Bath Fan Did Not Come On With Switch
4)condenser Needs Anchor Straps
5)outside Or Fresh Air Needs Automatic Damper Installed
6)panel Is Covered By Doors When Accessing Ahu Closet, Making Panel Not Visible From Ahu. Need Lock Out On Breaker Or Disconnect In Closet
|
Anthony Aslan |
6/1/2021 |
Passed: Building - Final |
|
Anthony Aslan |
6/4/2021 |