Columbia County is committed to ensuring accessibility to this website regardless of disability. If anyone encounters a feature on this website that is inaccessible due to a disability, please contact the County Manger’s Office and the Columbia County Board of County Commissioners at (386) 758-1005. You may also email that office at patrick_weaver@columbiacountyfla.com and provide a brief description of the inaccessible feature. The County will either correct the inaccessible feature or, if correction is not possible due to technical limitations, provide the desired information through alternative means.

Skip to content

Columbia County, FL | Permit Details

Additions Permit

Address 389 NW QUINTEN ST
LAKE CITY, FL 32055
Parcel #: 05068-000
Acres: 38.47
Owner: Columbia County, Florida
Subdivision:
Zoning: I
Flood Zone: X
District: 1
Application #: 47124
Permit #: 000040782
Related Permit:
Submitted: Thursday, October 8, 2020
Issued: Friday, October 23, 2020
Expires: Tuesday, March 15, 2022
Completed: Tuesday, March 15, 2022
Status: Completed
Septic Release? Yes
Notes:
APPROVED SPECIAL EXCEPTION (SE0622) FOR DETENTION FACILITY EXPANSION
Job Details
Elevation regulation Site & Development Plan
Finished floor requirement 179.1'
Requirement needed By Nailing Inspection
Document needed is a Surveyor letter giving the Finished Floor Elevation
Document receieved Yes
Fema map number 12023C0285D
Description of addition: Dormitory Pod for existing Detention Facility
Select driveway access to property: Existing Drive
Fire sprinklers? Yes
Setbacks Front 20'
Setback Side 1 15'
Setback Side 2 15'
Setback Rear 15'
Stories 2
Heated Area (Sqft) 37500
Total Area (Sqft) 37500
Total Estimated Cost 16100000.00
Building Height 30
Building Code Construction Type II
Building Code Element B
Building Code Occupancy Types Institutional
Dev Permit # F023-
Design Occupant Load 268
Building Code Edition Florida Building Code 2017 6th Edition & 2014 National Electrical Code
Septic# (00-0000) or (X00-000) X20
Is this an addition for commercial or residential use? Commercial
Review Notes
8/24/2020 Application pending.
10/13/2020 Zoning Review - Reviewed
10/13/2020 Plan Review - Reviewed
10/23/2020 Permit Issued Permit #000040782 created and approved.
Contractors
Name/ Business License Title Role
William P Byrne
Ajax Building Company Llc
County License & State License & Liability Insurance & Workers Comp Expired.
CGC042112 Cert. General Contractor
Erik W Worthmann
Comfort Temp Company/dba Ct Mechanical
CMC1249305 Cert. Mechanical Subcontractor
Eric H Touchton
Touchton Plumbing Contractors Inc
County License & State License Expired.
CFC056489 Cert. Plumbing Subcontractor
Thomas Stalvey
Ace Electric Inc Of Valdosta Georgia
County License & State License Expired.
EC0001433 Cert. Electrical Subcontractor
Ronald Benke
Cox Fire Protection Inc
County License & State License & Liability Insurance & Workers Comp Expired.
FPC12-000062 Cert. Fire/water System Subcontractor
Inspections
Inspection Notes Performed By Date
Passed: Electrical - Temporary Service Troy Crews 11/25/2020
Release to power company Troy Crews 11/25/2020
Passed: Building - Footer Partial Cell Foundations Troy Crews 1/21/2021
Passed: Engineering - Setbacks Troy Crews 1/21/2021
Passed: Plumbing/Gas - 1st Underground Rough–In Waste Lines South Line Of Building Troy Crews 1/21/2021
Passed: Building - Footer South End And ,southeast Cell Footers Troy Crews 1/26/2021
Passed: Engineering - Setbacks Troy Crews 1/26/2021
Passed: Plumbing/Gas - 1st Underground Rough–In Northwest Section Troy Crews 1/27/2021
Passed: Electrical - 1st Underground Rough–In Troy Crews 1/29/2021
Passed: Plumbing/Gas - 1st Underground Rough–In Troy Crews 1/29/2021
Passed: Building - Footer 3 Column Pads East Side One 12 Ft. Two 5 Ft. Troy Crews 2/11/2021
Passed: Engineering - Setbacks Troy Crews 2/11/2021
Passed: Building - Footer 5x52ft. Deep Columns West Side Troy Crews 2/18/2021
Passed: Engineering - Setbacks Troy Crews 2/18/2021
Passed: Plumbing/Gas - 1st Underground Rough–In Tie In Of 2 Main Sewer Lines With 2 Way Clean Out Troy Crews 2/25/2021
Passed: Building - Footer 14 Ft. Pads And One 3x3 Pad Troy Crews 2/26/2021
Passed: Engineering - Setbacks Troy Crews 2/26/2021
Passed: Building - Monolithic Slab Troy Crews 3/5/2021
Passed: Engineering - Setbacks Troy Crews 3/5/2021
Passed: Building - Monolithic Slab Troy Crews 3/8/2021
Passed: Engineering - Setbacks Troy Crews 3/8/2021
Passed: Building - Slab Electric Room Troy Crews 3/29/2021
Passed: Building - Monolithic Slab Troy Crews 3/29/2021
Passed: Engineering - Setbacks Troy Crews 3/29/2021
Passed: Building - Masonry Wall Reinforcing Sw Corner North Of Electric Room Troy Crews 4/6/2021
Passed: Building - Masonry Wall Reinforcing South Side Of Connecting Corridor And N.w. Corner Troy Crews 4/8/2021
Passed: Building - Masonry Wall Reinforcing North Side Of Corridor And Various First Lift Block Cells Troy Crews 4/12/2021
Cancelled: Building - Masonry Wall Reinforcing Troy Crews 4/13/2021
Passed: Building - Framing Anchor Bolts At Red Iron Beams. Troy Crews 4/14/2021
Passed: Building - Masonry Wall Reinforcing Troy Crews 4/15/2021
Passed: Building - Monolithic Slab Condenser Slabs South And North Troy Crews 4/15/2021
Passed: Engineering - Setbacks Troy Crews 4/15/2021
Passed: Building - Masonry Wall Reinforcing Troy Crews 4/16/2021
Passed: Building - Masonry Wall Reinforcing Center Section Interior Walls First Lift And Partial Second Lift. Troy Crews 4/20/2021
Passed: Building - Masonry Wall Reinforcing Troy Crews 4/21/2021
Passed: Building - Masonry Wall Reinforcing Troy Crews 4/22/2021
Passed: Building - Masonry Wall Reinforcing Troy Crews 4/26/2021
Passed: Building - Masonry Wall Reinforcing Top Out Electric Room Area And Partial Interior Hallways Troy Crews 4/28/2021
Passed: Building - Masonry Wall Reinforcing Troy Crews 4/29/2021
Passed: Building - Framing Troy Crews 5/7/2021
Passed: Building - Slab Troy Crews 5/11/2021
Passed: Building - Slab Troy Crews 5/19/2021
Passed: Building - Masonry Wall Reinforcing Troy Crews 5/20/2021
Passed: Building - Masonry Wall Reinforcing Troy Crews 5/25/2021
Rescheduled 5/27/2021:Building - Masonry Wall Reinforcing Troy Crews 5/26/2021
Rescheduled 5/27/2021:Building - Framing Troy Crews 5/26/2021
Passed: Building - Masonry Wall Reinforcing Troy Crews 5/27/2021
Passed: Building - Framing Troy Crews 5/27/2021
Passed: Building - Slab Troy Crews 6/2/2021
Passed: Building - Masonry Wall Reinforcing Troy Crews 6/2/2021
Passed: Building - Masonry Wall Reinforcing Troy Crews 6/3/2021
Passed: Plumbing/Gas - 2nd Rough-In Hot Water Lines Pressure 100p.s.i. Troy Crews 6/3/2021
Passed: Building - Masonry Wall Reinforcing Troy Crews 6/4/2021
Passed: Plumbing/Gas - 2nd Rough-In Troy Crews 6/4/2021
Passed: Building - Lintel/Tie Beam Troy Crews 6/8/2021
Passed: Building - Masonry Wall Reinforcing Troy Crews 6/8/2021
Passed: Building - Masonry Wall Reinforcing Troy Crews 6/10/2021
Passed: Building - Masonry Wall Reinforcing Troy Crews 6/14/2021
Passed: Building - Masonry Wall Reinforcing Troy Crews 6/15/2021
Passed: Building - Lintel/Tie Beam Troy Crews 6/16/2021
Passed: Building - Masonry Wall Reinforcing Troy Crews 6/16/2021
Passed: Building - Framing Troy Crews 6/16/2021
Passed: Building - Fire Rated Wall Troy Crews 6/16/2021
Passed: Building - Masonry Wall Reinforcing Troy Crews 6/17/2021
Passed: Building - Masonry Wall Reinforcing Troy Crews 6/18/2021
Passed: Building - Rated Assembly Fastening Troy Crews 6/18/2021
Passed: Building - Lintel/Tie Beam Troy Crews 6/21/2021
Passed: Building - Masonry Wall Reinforcing Troy Crews 6/21/2021
Passed: Building - Masonry Wall Reinforcing Troy Crews 6/22/2021
Passed: Building - Fire Rated Wall Troy Crews 6/22/2021
Passed: Building - Lintel/Tie Beam Troy Crews 6/23/2021
Passed: Building - Masonry Wall Reinforcing Troy Crews 6/23/2021
Passed: Building - Rated Assembly Fastening Troy Crews 6/23/2021
Passed: Building - Fire Rated Wall Troy Crews 6/23/2021
Passed: Building - Masonry Wall Reinforcing Troy Crews 6/24/2021
Passed: Building - Ext Strapping/Wall Sheathing South Side Corridor Troy Crews 6/24/2021
Passed: Building - Rated Assembly Fastening Troy Crews 6/24/2021
Passed: Building - Masonry Wall Reinforcing Troy Crews 6/25/2021
Passed: Building - Rated Assembly Fastening Troy Crews 6/25/2021
Passed: Building - Fire Rated Wall Troy Crews 6/25/2021
Passed: Building - Lintel/Tie Beam Troy Crews 7/1/2021
Passed: Building - Masonry Wall Reinforcing Troy Crews 7/1/2021
Passed: Building - Rated Assembly Fastening Troy Crews 7/9/2021
Passed: Building - Fire Rated Wall Troy Crews 7/9/2021
Passed: Building - Wall Sheathing Troy Crews 7/12/2021
Passed: Building - Slab Pictures Received Troy Crews 7/21/2021
Passed: Building - Masonry Wall Reinforcing Pictures Received Troy Crews 7/21/2021
Passed: Building - Footer Pictures Received Troy Crews 7/22/2021
Passed: Engineering - Setbacks Troy Crews 7/22/2021
Passed: Building - Masonry Wall Reinforcing Pictures Received Troy Crews 7/22/2021
Passed: Building - Framing Troy Crews 7/29/2021
Passed: Building - Masonry Wall Reinforcing Troy Crews 7/29/2021
Passed: Building - Lintel/Tie Beam Troy Crews 7/30/2021
Passed: Building - Fire Rated Wall Troy Crews 8/4/2021
Passed: Building - Masonry Wall Reinforcing Troy Crews 8/5/2021
Passed: Building - Rated Assembly Fastening Troy Crews 8/5/2021
Cancelled: Mechanical - Rough In Troy Crews 8/10/2021
Passed: Building - Framing Troy Crews 8/11/2021
Passed: Building - Fire Rated Wall Troy Crews 8/11/2021
Passed: Mechanical - Rough In Pressure Test Anthony Aslan 8/11/2021
Passed: Building - Lintel/Tie Beam Troy Crews 8/16/2021
Passed: Building - Masonry Wall Reinforcing Troy Crews 8/16/2021
Passed: Building - Masonry Wall Reinforcing Troy Crews 8/17/2021
Passed: Building - Masonry Wall Reinforcing Troy Crews 8/18/2021
Passed: Mechanical - Rough In Pressure Test Anthony Aslan 8/18/2021
Passed: Building - Masonry Wall Reinforcing Troy Crews 8/19/2021
Passed: Building - Lintel/Tie Beam Troy Crews 8/23/2021
Passed: Building - Masonry Wall Reinforcing Make Sure #4 Bars Are Changed Out To #5 Troy Crews 8/23/2021
Passed: Building - Masonry Wall Reinforcing # 4 Bar Each Cell Troy Crews 8/24/2021
Passed: Building - Masonry Wall Reinforcing Also 2 Wings At Door Area Troy Crews 8/27/2021
Passed: Building - Slab Troy Crews 9/7/2021
Failed: Mechanical - Pipe Pressure Test Could Not Build Pressure, However Did Check Some Duct For Wrap Troy Crews 9/8/2021
Failed: Mechanical - Performance Test and Balance No Pressure Troy Crews 9/8/2021
Passed: Building - Masonry Wall Reinforcing Troy Crews 9/16/2021
Passed: Plumbing/Gas - Water Pipe Troy Crews 9/20/2021
Passed: Mechanical - Rough In Leak Test Smoke Anthony Aslan 9/20/2021
Passed: Building - Masonry Wall Reinforcing Troy Crews 9/22/2021
Passed: Building - Lintel/Tie Beam Troy Crews 9/27/2021
Passed: Building - Masonry Wall Reinforcing Troy Crews 9/27/2021
Passed: Building - Masonry Wall Reinforcing Troy Crews 9/29/2021
Passed: Mechanical - Pipe Pressure Test #5 Anthony Aslan 9/30/2021
Passed: Electrical - Permanent Power Troy Crews 10/1/2021
Release to power company Troy Crews 10/1/2021
Passed: Building - Footer Troy Crews 10/5/2021
Passed: Engineering - Setbacks Troy Crews 10/5/2021
Passed: Building - Framing Troy Crews 10/7/2021
Passed: Mechanical - Rough In Anthony Aslan 10/11/2021
Passed: Plumbing/Gas - 2nd Rough-In Gas Test On Line Anthony Aslan 10/12/2021
Passed: Building - Rated Assembly Fastening Troy Crews 10/12/2021
Passed: Mechanical - Pipe Pressure Test Anthony Aslan 10/14/2021
Passed: Building - Rated Assembly Fastening Troy Crews 10/15/2021
Passed: Electrical - Above Ceiling Troy Crews 10/20/2021
Passed: Mechanical - Rough In East Duct Anthony Aslan 10/21/2021
Passed: Building - Wall Sheathing Troy Crews 10/26/2021
Passed: Building - Wall Sheathing Troy Crews 10/27/2021
Passed: Mechanical - Rough In Troy Crews 11/1/2021
Passed: Mechanical - Rough In To Allow For Grid Ceiling Channel To Be Installed Anthony Aslan 11/5/2021
Passed: Fire - Operational Test - Sprinkler/Standpipe Pressure Test Of Overhead Sprinkler System. 4" Fdc Pipe Not Tested, Will Be Inspected/tested At A Later Date. Lance Hill 12/22/2021
Passed: Plumbing/Gas - 2nd Rough-In Troy Crews 1/7/2022
Passed: Electrical - Above Ceiling Troy Crews 1/25/2022
Passed: Building - Final Release Of C.o. Pending F.d. And Smoke Test Troy Crews 2/22/2022
Passed: Fire - Operational Test - Sprinkler/Standpipe Lance Hill 2/22/2022
Passed: Fire - Operational Test - Alarm System Lance Hill 2/22/2022
Failed: Fire - Fire Final Smoke Ejection System Not Operational Yet Lance Hill 2/23/2022
Cancelled: Fire - Operational Test - Sprinkler/Standpipe Completed 2/22/22 Lance Hill 2/23/2022
Cancelled: Fire - Operational Test - Alarm System Completed 2/22/22 Lance Hill 2/23/2022
Cancelled: Fire - Fire Final Rescheduled For A Later Date Lance Hill 2/23/2022
Passed: Fire - Operational Test - Sprinkler/Standpipe Completed And Passed Pressure Test Of Standpipe 12/30/21 Lance Hill 2/23/2022
Failed: Building - Final Control Dampers Not Operating Troy Crews 3/11/2022
Failed: Fire - Fire Final Control Dampers Not Operating Lance Hill 3/11/2022
Passed: Certificate-Release Certificate Troy Crews 3/15/2022
Passed: Building - Final Troy Crews 3/15/2022
Passed: Fire - Fire Final Lance Hill 3/15/2022
Documents
File Name Date File Size
Certificate Of Occupancy 20250717.pdf 2025.08.04 61.75kB
Ptiecq4l.xmw.pdf 2025.07.14 17.60MB
Mckl4yjj.p2f.pdf 2025.07.14 40.08MB
Le5igwyc.tgu.pdf 2025.07.14 17.60MB
S-701.pdf 2025.06.22 141.70kB
S-131.pdf 2025.06.22 191.32kB
S-511.pdf 2025.06.22 190.00kB
Jail Elevation Confirmation 2021-04-01 07.34.00.110.pdf 2025.06.22 74.76kB
Surveyor Finish Floor Elevation Letter 47124 2021-03-31 16.06.25.451.pdf 2025.06.22 74.76kB
S-351.pdf 2025.06.22 204.41kB
G-001b-2 - Architectural Index Volume 2.pdf 2025.06.22 254.59kB
Plumbing Subcontractor Form Only.pdf 2025.06.22 219.82kB
Electrical Sub Form-stalvey 2020-10-14 10.47.23.808.pdf 2025.06.22 336.71kB
S-211.pdf 2025.06.22 256.05kB
S-331.pdf 2025.06.22 271.51kB
S-221.pdf 2025.06.22 279.56kB
S-352.pdf 2025.06.22 280.15kB
S-121.pdf 2025.06.22 312.21kB
S-411.pdf 2025.06.22 338.56kB
S-122.pdf 2025.06.22 343.61kB
S-321.pdf 2025.06.22 460.13kB
S-311.pdf 2025.06.22 467.58kB
S-312.pdf 2025.06.22 473.08kB
Concrete Testing Jail 40782 2021-12-09 07.06.31.253.pdf 2025.06.22 539.78kB
As-101 - Architectural Site Plan & Details.pdf 2025.06.21 535.05kB
As-101 - Architectural Site Plan Details 2020-10-08 07.21.55.593.pdf 2025.06.21 535.05kB
S-111.pdf 2025.06.21 801.03kB
Owner And Contractor Signature Page 20201008 095111.pdf 2025.06.21 938.28kB
S-001.pdf 2025.06.21 868.31kB
M-321c - Upper Tier Smoke 2021-08-12 08.47.01.394.pdf 2025.06.21 421.40kB
M-121c Upper 2021-08-18 11.29.12.849.pdf 2025.06.21 521.54kB
Fp-001 - Fire Protection, Legend, Notes And Index.pdf 2025.06.21 233.17kB
M-601 - Hvac Controls.pdf 2025.06.21 241.45kB
P-001 - Plumbing Symbols, Legend, Notes And Index.pdf 2025.06.21 248.89kB
M-002 - Hvac Commissioning Notes.pdf 2025.06.21 246.42kB
M-801 - Hvac Schedules.pdf 2025.06.21 250.97kB
M-001 - Hvac Symbols, Legends, General Notes And Index.pdf 2025.06.21 254.98kB
E-005 - Light Fixture, Mech. Equip Connection Schedules.pdf 2025.06.21 251.21kB
P-131 - Plumbing Overall Roof Plan.pdf 2025.06.21 260.91kB
E-502 - Panel Schedules.pdf 2025.06.21 252.99kB
E-703 - Smoke Control Details.pdf 2025.06.21 250.19kB
E-001 - Electrical Symbol Legend, Drawing Index.pdf 2025.06.21 262.65kB
M-603 - Hvac Controls.pdf 2025.06.21 262.52kB
M-003 - Smoke Control Notes.pdf 2025.06.21 274.32kB
E-501 - Panel Schedules.pdf 2025.06.21 268.95kB
M-701 - Hvac Details.pdf 2025.06.21 272.50kB
E-003 - Power Riser Diagram.pdf 2025.06.21 268.30kB
M-602 - Hvac Controls.pdf 2025.06.21 243.20kB
E-002 - Electrical General Notes.pdf 2025.06.21 275.95kB
E-004 - Fire Alarm Riser Diagram, Matrix.pdf 2025.06.21 272.50kB
Fp-701 - Fire Protection Details.pdf 2025.06.21 268.55kB
Suppliment Columbia County Jail Pod Flacom.pdf 2025.06.21 348.22kB
Ep-131 - Electrical Roof Plan.pdf 2025.06.21 272.81kB
E-801 - Lighting Control Block Diagrams, Schedules.pdf 2025.06.21 276.12kB
M-702 - Hvac Details.pdf 2025.06.21 291.25kB
E-401 - Enlarged Plans.pdf 2025.06.21 280.42kB
M-703 - Hvac Details.pdf 2025.06.21 292.86kB
M-704 - Hvac Details.pdf 2025.06.21 302.82kB
E-701 - Smoke Control Sequences.pdf 2025.06.21 303.83kB
E-601 - Electrical Details.pdf 2025.06.21 305.33kB
E-602 - Electrical Details.pdf 2025.06.21 321.95kB
E-603 - Electrical Details.pdf 2025.06.21 450.05kB
E-702 - Smoke Control Diagram.pdf 2025.06.21 372.58kB
P-701 - Plumbing Details.pdf 2025.06.21 366.87kB
M-311c - First Floor Smoke Control Plan - Area C.pdf 2025.06.21 463.72kB
M-321c - Upper Tier Smoke Control Plan - Area C.pdf 2025.06.21 501.98kB
P-604 - Plumbing Risers.pdf 2025.06.21 454.85kB
Fp-121c - Upper Tier Fire Protection Plan - Area C.pdf 2025.06.21 506.87kB
M-121c - Upper Tier Hvac Plan - Area C.pdf 2025.06.21 527.04kB
Ep-121c - Upper Tier Power & Fire Alarm Plan - Area C.pdf 2025.06.21 534.34kB
P-603 - Plumbing Risers.pdf 2025.06.21 471.61kB
M-111c - First Floor Hvac Plan - Area C.pdf 2025.06.21 528.52kB
Fp-111c - First Floor Fire Protection Plan - Area C.pdf 2025.06.21 516.26kB
M-501 - Mechanical Sections.pdf 2025.06.21 503.72kB
El-121c - Upper Tier Lighting Plan - Area C.pdf 2025.06.21 583.43kB
E-102 - Site Photometrics Plan.pdf 2025.06.21 790.48kB
E-101 - Electrical Site Plan.pdf 2025.06.21 476.92kB
P-602 - Plumbing Risers.pdf 2025.06.21 804.72kB
P-111c - First Floor Plumbing Plan - Area C.pdf 2025.06.21 1.01MB
P-601 - Plumbing Risers.pdf 2025.06.21 954.83kB
Ep-111c - First Floor Power & Fire Alarm Plan - Area C.pdf 2025.06.21 1,003.11kB
P-121c - Upper Tier Plumbing Plan - Area C.pdf 2025.06.21 1.14MB
El-111c - First Floor Lighting Plan - Area C.pdf 2025.06.21 1.12MB
Win_20210305_10_22_30_pro 2021-03-05 10.32.43.967.jpg 2025.06.20 297.23kB
Win_20210305_10_23_24_pro 2021-03-05 10.32.56.686.jpg 2025.06.20 305.93kB
Ty-series.pdf 2025.06.20 4.56MB
Ty-series 2020-10-08 07.23.21.221.pdf 2025.06.20 4.56MB
00 00 01 Ccdf Seals Page 07-24-2020 2020-10-08 07.08.48.816.pdf 2025.06.20 195.30kB
00 00 01 Ccdf Seals Page 07-24-2020.pdf 2025.06.20 195.30kB
G-000-2 - Cover - Volume 2.pdf 2025.06.19 243.65kB
G-000-1 - Cover - Volume 1.pdf 2025.06.19 248.66kB
Project Manual Volume 1.pdf 2025.06.19 5.40MB
Qd-series.pdf 2025.06.19 7.94MB
Qd-series 2020-10-08 07.23.05.64.pdf 2025.06.19 7.94MB
Project Manual Volume 2.pdf 2025.06.19 8.88MB
G-series.pdf 2025.06.19 6.28MB
A-series 2020-10-08 07.22.09.484.pdf 2025.06.19 16.12MB
A-series.pdf 2025.06.19 16.12MB
Permit # 40782 Columbia County Detention Center 1.21.21.msg 2021.12.07 35.50kB
Foundation Rfi's 1.22.21.msg 2021.12.07 382.50kB
Fw John Cappadonnashared Folder 'ccdf Testing'.msg 2021.12.07 104.00kB
Report(s) For Columbia County Detention Facility Materials Testing (10117-1020031 1.22.21.msg 2021.12.07 729.00kB
Reports Available Today 1.23.21.msg 2021.12.07 52.00kB
Report(s) For Columbia County Detention Facility Materials Testing (10117-1020031 000)1.26.21.msg 2021.12.07 298.00kB
Report(s) For Columbia County Detention Facility Materials Testing (10117-1020031 1.28.21.msg 2021.12.07 298.00kB
Report(s) For Columbia County Detention Facility Materials Testing (10117-1020031 000)2.1.21.msg 2021.12.07 2.76MB
Reports Available Today 2.2.21.msg 2021.12.07 61.50kB
Report(s) For Columbia County Detention Facility Materials Testing (10117-1020031 000)2.5.21.msg 2021.12.07 232.50kB
Report(s) For Columbia County Detention Facility Materials Testing (10117-1020031 000)2.12.21.msg 2021.12.07 1.06MB
Reports Available Today 2.13.21.msg 2021.12.07 52.00kB
Report(s) For Columbia County Detention Facility Materials Testing (10117-1020031 000)2.19.21.msg 2021.12.07 2.25MB
Columbia County Detention Facility 2.25.21.msg 2021.12.07 229.50kB
Reports Available Today 2.27.21.msg 2021.12.07 57.50kB
Termite Treatment Tickets 3.5.21.msg 2021.12.07 328.00kB
Jail Termite Treatment Tickets.msg 2021.12.07 333.00kB
Report(s) For Columbia County Detention Facility Materials Testing (10117-1020031 000)3.8.21.msg 2021.12.07 700.00kB
Reports Available Today 3.9.21.msg 2021.12.07 52.00kB
Report(s) For Columbia County Detention Facility Materials Testing (10117-1020031 000)3.12.21.msg 2021.12.07 1.29MB
Report(s) For Columbia County Detention Facility Materials Testing (10117-1020031 000)3.26.21.msg 2021.12.07 1.02MB
Report(s) For Columbia County Detention Facility Materials Testing (10117-1020031 000)4.2.21.msg 2021.12.07 1.03MB
Report(s) For Columbia County Detention Facility Materials Testing (10117-1020031 000)4.9.21.msg 2021.12.07 3.37MB
Termite Treatment 1.msg 2021.12.07 146.50kB
Report(s) For Columbia County Detention Facility Materials Testing (10117-1020031 000)4.16.21.msg 2021.12.07 2.79MB
Report(s) For Columbia County Detention Facility Materials Testing (10117-1020031 000)5.10.21.msg 2021.12.07 4.05MB
Report(s) For Columbia County Detention Facility Materials Testing (10117-1020031 000)5.14.21.msg 2021.12.07 1.42MB
Report(s) For Columbia County Detention Facility Materials Testing (10117-1020031 000)5.21.21.msg 2021.12.07 5.77MB
Report(s) For Columbia County Detention Facility Materials Testing (10117-1020031 000)5.28.21.msg 2021.12.07 2.88MB
Report(s) For Columbia County Detention Facility Materials Testing (10117-1020031 000)6.11.21.msg 2021.12.07 1.72MB
Reports Available 6.19.21.msg 2021.12.07 125.00kB
Report(s) For Columbia County Detention Facility Materials Testing (10117-1020031 000) 6.23.21.msg 2021.12.07 1.46MB
Reports Available Today 6.24.21.msg 2021.12.07 55.50kB
Reports Columbia County Detention Facility Materials Testing (10117-1020031 000).msg 2021.12.07 1.31MB
Nova Report On Room C-145 6-28-21.msg 2021.12.07 87.50kB
Nova Report On Room C-145 6-24-21.msg 2021.12.07 87.50kB
Reports Available Today (24).msg 2021.12.07 2.01MB
Reports Available Today (25).msg 2021.12.07 53.50kB
Reports Available Today (23).msg 2021.12.07 2.61MB
Reports Available Today (26).msg 2021.12.07 1.48MB
Reports For Columbia County Detention Facility Materials Testing (10117-1020031 000).msg 2021.12.07 589.00kB
Reports Available Today (11).msg 2021.12.07 52.00kB
Report 5 For Columbia County Detention Facility Materials Testing (10117-1020031 000) (2).msg 2021.12.07 795.50kB
Reports Today.msg 2021.12.07 51.50kB
Reports Available.msg 2021.12.07 50.00kB
Columbia County Detention Facility Materials Testing (10117-1020031 000) (1).msg 2021.12.07 867.50kB
Columbia County Jail.msg 2021.12.07 4.54MB
Report Columbia County Detention Facility Materials Testing (10117-1020031 000).msg 2021.12.07 1.92MB
Columbia County Jail - Rfi #cc-165.msg 2021.12.07 319.50kB
Report For Columbia County Detention Facility Materials Testing (10117-1020031 000).msg 2021.12.07 768.00kB
Reports Available Today A.msg 2021.12.07 53.00kB
Permit # 40782 Columbia County Detention Center A.msg 2021.12.07 39.00kB
Fw Generac - Em Gen - Columbia County Jail - Rfi #cc-165 Location Of Generator Emergency Shut Off Button .msg 2021.12.07 4.55MB
Re Generac - Em Gen - Columbia County Jail - Rfi #cc-165 Location Of Generator Emergency Shut Off Button .msg 2021.12.07 347.50kB
Reports Available Today (4).msg 2021.12.07 53.00kB
Reports Available Today (2).msg 2021.12.07 61.00kB
Re Nova Report On Room C-145 6-24-21.msg 2021.12.07 93.50kB
Re Nova Report On Room C-145 6-24-21 (1).msg 2021.12.07 93.00kB
Report(s) For Columbia County Detention Facility Materials Testing (10117-1020031 000) (3).msg 2021.12.07 3.38MB
Termite Treatment.msg 2021.12.07 151.50kB
Termite Treatment Tickets.msg 2021.12.07 333.00kB
Columbia County Detention Facility.msg 2021.12.07 236.50kB
Reports Available Today (3).msg 2021.12.07 69.50kB
Report(s) For Columbia County Detention Facility Materials Testing (10117-1020031 000).msg 2021.12.07 1.42MB
Report(s) For Columbia County Detention Facility Materials Testing (10117-1020031 000) (1).msg 2021.12.07 4.06MB
Report(s) For Columbia County Detention Facility Materials Testing (10117-1020031 000) (4).msg 2021.12.07 1.03MB
Reports Available Today.msg 2021.12.07 58.00kB
Report(s) For Columbia County Detention Facility Materials Testing (10117-1020031 000) (2).msg 2021.12.07 2.79MB
Foundation Rfi's.msg 2021.12.07 388.50kB
Permit # 40782 Columbia County Detention Center.msg 2021.12.07 39.00kB
Fw Columbia County Detention Facility.msg 2021.12.07 140.50kB
Power Release-electrical-permanent Power 20211001.pdf 2021.10.01 38.88kB
Ccdf- Inspection Pictures 2021-07-27 14.14.15.259.msg 2021.07.27 6.71MB
Soil Treatment Jail 2021-03-30 07.27.20.368.pdf 2021.03.30 136.40kB
Termite Treatment Jail 4 2021-03-05 13.54.29.172.pdf 2021.03.05 57.35kB
Termite Treatment Jail 3 2021-03-05 13.54.13.733.pdf 2021.03.05 57.30kB
Termite Treatment Jail 2 2021-03-05 13.54.00.624.pdf 2021.03.05 63.98kB
Termite Treatment Jail Project 1 2021-03-05 13.53.45.795.pdf 2021.03.05 56.25kB
Soil Reports 40782 Jail 2021-01-22 08.09.58.635.zip 2021.01.22 7.00MB
Rfi Cc-48 Jail 2021-01-22 07.20.56.457.pdf 2021.01.22 133.52kB
Rfi Cc-30 Permit 40782 Jail 2021-01-22 07.20.35.941.pdf 2021.01.22 157.51kB
Power Release-electrical-temporary Service 20201125.pdf 2020.11.25 38.75kB
Original Permit 20201023.pdf 2020.10.23 44.64kB
Contractor Letter Of Authorization 20201008 095007.pdf 2020.10.08 98.77kB