Inspection |
Notes |
Performed By |
Date |
Passed: Electrical - Temporary Service |
|
Troy Crews |
11/25/2020 |
Release to power company |
|
Troy Crews |
11/25/2020 |
Passed: Building - Footer |
Partial Cell Foundations |
Troy Crews |
1/21/2021 |
Passed: Engineering - Setbacks |
|
Troy Crews |
1/21/2021 |
Passed: Plumbing/Gas - 1st Underground Rough–In |
Waste Lines South Line Of Building |
Troy Crews |
1/21/2021 |
Passed: Building - Footer |
South End And ,southeast Cell Footers |
Troy Crews |
1/26/2021 |
Passed: Engineering - Setbacks |
|
Troy Crews |
1/26/2021 |
Passed: Plumbing/Gas - 1st Underground Rough–In |
Northwest Section |
Troy Crews |
1/27/2021 |
Passed: Electrical - 1st Underground Rough–In |
|
Troy Crews |
1/29/2021 |
Passed: Plumbing/Gas - 1st Underground Rough–In |
|
Troy Crews |
1/29/2021 |
Passed: Building - Footer |
3 Column Pads East Side One 12 Ft. Two 5 Ft. |
Troy Crews |
2/11/2021 |
Passed: Engineering - Setbacks |
|
Troy Crews |
2/11/2021 |
Passed: Building - Footer |
5x52ft. Deep Columns West Side |
Troy Crews |
2/18/2021 |
Passed: Engineering - Setbacks |
|
Troy Crews |
2/18/2021 |
Passed: Plumbing/Gas - 1st Underground Rough–In |
Tie In Of 2 Main Sewer Lines With 2 Way Clean Out |
Troy Crews |
2/25/2021 |
Passed: Building - Footer |
14 Ft. Pads And One 3x3 Pad |
Troy Crews |
2/26/2021 |
Passed: Engineering - Setbacks |
|
Troy Crews |
2/26/2021 |
Passed: Building - Monolithic Slab |
|
Troy Crews |
3/5/2021 |
Passed: Engineering - Setbacks |
|
Troy Crews |
3/5/2021 |
Passed: Building - Monolithic Slab |
|
Troy Crews |
3/8/2021 |
Passed: Engineering - Setbacks |
|
Troy Crews |
3/8/2021 |
Passed: Building - Slab |
Electric Room |
Troy Crews |
3/29/2021 |
Passed: Building - Monolithic Slab |
|
Troy Crews |
3/29/2021 |
Passed: Engineering - Setbacks |
|
Troy Crews |
3/29/2021 |
Passed: Building - Masonry Wall Reinforcing |
Sw Corner North Of Electric Room |
Troy Crews |
4/6/2021 |
Passed: Building - Masonry Wall Reinforcing |
South Side Of Connecting Corridor And N.w. Corner |
Troy Crews |
4/8/2021 |
Passed: Building - Masonry Wall Reinforcing |
North Side Of Corridor And Various First Lift Block Cells |
Troy Crews |
4/12/2021 |
Cancelled: Building - Masonry Wall Reinforcing |
|
Troy Crews |
4/13/2021 |
Passed: Building - Framing |
Anchor Bolts At Red Iron Beams. |
Troy Crews |
4/14/2021 |
Passed: Building - Masonry Wall Reinforcing |
|
Troy Crews |
4/15/2021 |
Passed: Building - Monolithic Slab |
Condenser Slabs South And North |
Troy Crews |
4/15/2021 |
Passed: Engineering - Setbacks |
|
Troy Crews |
4/15/2021 |
Passed: Building - Masonry Wall Reinforcing |
|
Troy Crews |
4/16/2021 |
Passed: Building - Masonry Wall Reinforcing |
Center Section Interior Walls First Lift And Partial Second Lift. |
Troy Crews |
4/20/2021 |
Passed: Building - Masonry Wall Reinforcing |
|
Troy Crews |
4/21/2021 |
Passed: Building - Masonry Wall Reinforcing |
|
Troy Crews |
4/22/2021 |
Passed: Building - Masonry Wall Reinforcing |
|
Troy Crews |
4/26/2021 |
Passed: Building - Masonry Wall Reinforcing |
Top Out Electric Room Area And Partial Interior Hallways |
Troy Crews |
4/28/2021 |
Passed: Building - Masonry Wall Reinforcing |
|
Troy Crews |
4/29/2021 |
Passed: Building - Framing |
|
Troy Crews |
5/7/2021 |
Passed: Building - Slab |
|
Troy Crews |
5/11/2021 |
Passed: Building - Slab |
|
Troy Crews |
5/19/2021 |
Passed: Building - Masonry Wall Reinforcing |
|
Troy Crews |
5/20/2021 |
Passed: Building - Masonry Wall Reinforcing |
|
Troy Crews |
5/25/2021 |
Rescheduled 5/27/2021:Building - Masonry Wall Reinforcing |
|
Troy Crews |
5/26/2021 |
Rescheduled 5/27/2021:Building - Framing |
|
Troy Crews |
5/26/2021 |
Passed: Building - Masonry Wall Reinforcing |
|
Troy Crews |
5/27/2021 |
Passed: Building - Framing |
|
Troy Crews |
5/27/2021 |
Passed: Building - Slab |
|
Troy Crews |
6/2/2021 |
Passed: Building - Masonry Wall Reinforcing |
|
Troy Crews |
6/2/2021 |
Passed: Building - Masonry Wall Reinforcing |
|
Troy Crews |
6/3/2021 |
Passed: Plumbing/Gas - 2nd Rough-In |
Hot Water Lines Pressure 100p.s.i. |
Troy Crews |
6/3/2021 |
Passed: Building - Masonry Wall Reinforcing |
|
Troy Crews |
6/4/2021 |
Passed: Plumbing/Gas - 2nd Rough-In |
|
Troy Crews |
6/4/2021 |
Passed: Building - Lintel/Tie Beam |
|
Troy Crews |
6/8/2021 |
Passed: Building - Masonry Wall Reinforcing |
|
Troy Crews |
6/8/2021 |
Passed: Building - Masonry Wall Reinforcing |
|
Troy Crews |
6/10/2021 |
Passed: Building - Masonry Wall Reinforcing |
|
Troy Crews |
6/14/2021 |
Passed: Building - Masonry Wall Reinforcing |
|
Troy Crews |
6/15/2021 |
Passed: Building - Lintel/Tie Beam |
|
Troy Crews |
6/16/2021 |
Passed: Building - Masonry Wall Reinforcing |
|
Troy Crews |
6/16/2021 |
Passed: Building - Framing |
|
Troy Crews |
6/16/2021 |
Passed: Building - Fire Rated Wall |
|
Troy Crews |
6/16/2021 |
Passed: Building - Masonry Wall Reinforcing |
|
Troy Crews |
6/17/2021 |
Passed: Building - Masonry Wall Reinforcing |
|
Troy Crews |
6/18/2021 |
Passed: Building - Rated Assembly Fastening |
|
Troy Crews |
6/18/2021 |
Passed: Building - Lintel/Tie Beam |
|
Troy Crews |
6/21/2021 |
Passed: Building - Masonry Wall Reinforcing |
|
Troy Crews |
6/21/2021 |
Passed: Building - Masonry Wall Reinforcing |
|
Troy Crews |
6/22/2021 |
Passed: Building - Fire Rated Wall |
|
Troy Crews |
6/22/2021 |
Passed: Building - Lintel/Tie Beam |
|
Troy Crews |
6/23/2021 |
Passed: Building - Masonry Wall Reinforcing |
|
Troy Crews |
6/23/2021 |
Passed: Building - Rated Assembly Fastening |
|
Troy Crews |
6/23/2021 |
Passed: Building - Fire Rated Wall |
|
Troy Crews |
6/23/2021 |
Passed: Building - Masonry Wall Reinforcing |
|
Troy Crews |
6/24/2021 |
Passed: Building - Ext Strapping/Wall Sheathing |
South Side Corridor |
Troy Crews |
6/24/2021 |
Passed: Building - Rated Assembly Fastening |
|
Troy Crews |
6/24/2021 |
Passed: Building - Masonry Wall Reinforcing |
|
Troy Crews |
6/25/2021 |
Passed: Building - Rated Assembly Fastening |
|
Troy Crews |
6/25/2021 |
Passed: Building - Fire Rated Wall |
|
Troy Crews |
6/25/2021 |
Passed: Building - Lintel/Tie Beam |
|
Troy Crews |
7/1/2021 |
Passed: Building - Masonry Wall Reinforcing |
|
Troy Crews |
7/1/2021 |
Passed: Building - Rated Assembly Fastening |
|
Troy Crews |
7/9/2021 |
Passed: Building - Fire Rated Wall |
|
Troy Crews |
7/9/2021 |
Passed: Building - Wall Sheathing |
|
Troy Crews |
7/12/2021 |
Passed: Building - Slab |
Pictures Received |
Troy Crews |
7/21/2021 |
Passed: Building - Masonry Wall Reinforcing |
Pictures Received |
Troy Crews |
7/21/2021 |
Passed: Building - Footer |
Pictures Received |
Troy Crews |
7/22/2021 |
Passed: Engineering - Setbacks |
|
Troy Crews |
7/22/2021 |
Passed: Building - Masonry Wall Reinforcing |
Pictures Received |
Troy Crews |
7/22/2021 |
Passed: Building - Framing |
|
Troy Crews |
7/29/2021 |
Passed: Building - Masonry Wall Reinforcing |
|
Troy Crews |
7/29/2021 |
Passed: Building - Lintel/Tie Beam |
|
Troy Crews |
7/30/2021 |
Passed: Building - Fire Rated Wall |
|
Troy Crews |
8/4/2021 |
Passed: Building - Masonry Wall Reinforcing |
|
Troy Crews |
8/5/2021 |
Passed: Building - Rated Assembly Fastening |
|
Troy Crews |
8/5/2021 |
Cancelled: Mechanical - Rough In |
|
Troy Crews |
8/10/2021 |
Passed: Building - Framing |
|
Troy Crews |
8/11/2021 |
Passed: Building - Fire Rated Wall |
|
Troy Crews |
8/11/2021 |
Passed: Mechanical - Rough In |
Pressure Test |
Anthony Aslan |
8/11/2021 |
Passed: Building - Lintel/Tie Beam |
|
Troy Crews |
8/16/2021 |
Passed: Building - Masonry Wall Reinforcing |
|
Troy Crews |
8/16/2021 |
Passed: Building - Masonry Wall Reinforcing |
|
Troy Crews |
8/17/2021 |
Passed: Building - Masonry Wall Reinforcing |
|
Troy Crews |
8/18/2021 |
Passed: Mechanical - Rough In |
Pressure Test |
Anthony Aslan |
8/18/2021 |
Passed: Building - Masonry Wall Reinforcing |
|
Troy Crews |
8/19/2021 |
Passed: Building - Lintel/Tie Beam |
|
Troy Crews |
8/23/2021 |
Passed: Building - Masonry Wall Reinforcing |
Make Sure #4 Bars Are Changed Out To #5 |
Troy Crews |
8/23/2021 |
Passed: Building - Masonry Wall Reinforcing |
# 4 Bar Each Cell |
Troy Crews |
8/24/2021 |
Passed: Building - Masonry Wall Reinforcing |
Also 2 Wings At Door Area |
Troy Crews |
8/27/2021 |
Passed: Building - Slab |
|
Troy Crews |
9/7/2021 |
Failed: Mechanical - Pipe Pressure Test |
Could Not Build Pressure, However Did Check Some Duct For Wrap |
Troy Crews |
9/8/2021 |
Failed: Mechanical - Performance Test and Balance |
No Pressure |
Troy Crews |
9/8/2021 |
Passed: Building - Masonry Wall Reinforcing |
|
Troy Crews |
9/16/2021 |
Passed: Plumbing/Gas - Water Pipe |
|
Troy Crews |
9/20/2021 |
Passed: Mechanical - Rough In |
Leak Test Smoke |
Anthony Aslan |
9/20/2021 |
Passed: Building - Masonry Wall Reinforcing |
|
Troy Crews |
9/22/2021 |
Passed: Building - Lintel/Tie Beam |
|
Troy Crews |
9/27/2021 |
Passed: Building - Masonry Wall Reinforcing |
|
Troy Crews |
9/27/2021 |
Passed: Building - Masonry Wall Reinforcing |
|
Troy Crews |
9/29/2021 |
Passed: Mechanical - Pipe Pressure Test |
#5 |
Anthony Aslan |
9/30/2021 |
Passed: Electrical - Permanent Power |
|
Troy Crews |
10/1/2021 |
Release to power company |
|
Troy Crews |
10/1/2021 |
Passed: Building - Footer |
|
Troy Crews |
10/5/2021 |
Passed: Engineering - Setbacks |
|
Troy Crews |
10/5/2021 |
Passed: Building - Framing |
|
Troy Crews |
10/7/2021 |
Passed: Mechanical - Rough In |
|
Anthony Aslan |
10/11/2021 |
Passed: Plumbing/Gas - 2nd Rough-In |
Gas Test On Line |
Anthony Aslan |
10/12/2021 |
Passed: Building - Rated Assembly Fastening |
|
Troy Crews |
10/12/2021 |
Passed: Mechanical - Pipe Pressure Test |
|
Anthony Aslan |
10/14/2021 |
Passed: Building - Rated Assembly Fastening |
|
Troy Crews |
10/15/2021 |
Passed: Electrical - Above Ceiling |
|
Troy Crews |
10/20/2021 |
Passed: Mechanical - Rough In |
East Duct |
Anthony Aslan |
10/21/2021 |
Passed: Building - Wall Sheathing |
|
Troy Crews |
10/26/2021 |
Passed: Building - Wall Sheathing |
|
Troy Crews |
10/27/2021 |
Passed: Mechanical - Rough In |
|
Troy Crews |
11/1/2021 |
Passed: Mechanical - Rough In |
To Allow For Grid Ceiling Channel To Be Installed
|
Anthony Aslan |
11/5/2021 |
Passed: Fire - Operational Test - Sprinkler/Standpipe |
Pressure Test Of Overhead Sprinkler System.
4" Fdc Pipe Not Tested, Will Be Inspected/tested At A Later Date. |
Lance Hill |
12/22/2021 |
Passed: Plumbing/Gas - 2nd Rough-In |
|
Troy Crews |
1/7/2022 |
Passed: Electrical - Above Ceiling |
|
Troy Crews |
1/25/2022 |
Passed: Building - Final |
Release Of C.o. Pending F.d. And Smoke Test |
Troy Crews |
2/22/2022 |
Passed: Fire - Operational Test - Sprinkler/Standpipe |
|
Lance Hill |
2/22/2022 |
Passed: Fire - Operational Test - Alarm System |
|
Lance Hill |
2/22/2022 |
Failed: Fire - Fire Final |
Smoke Ejection System Not Operational Yet |
Lance Hill |
2/23/2022 |
Cancelled: Fire - Operational Test - Sprinkler/Standpipe |
Completed 2/22/22 |
Lance Hill |
2/23/2022 |
Cancelled: Fire - Operational Test - Alarm System |
Completed 2/22/22 |
Lance Hill |
2/23/2022 |
Cancelled: Fire - Fire Final |
Rescheduled For A Later Date |
Lance Hill |
2/23/2022 |
Passed: Fire - Operational Test - Sprinkler/Standpipe |
Completed And Passed Pressure Test Of Standpipe 12/30/21 |
Lance Hill |
2/23/2022 |
Failed: Building - Final |
Control Dampers Not Operating |
Troy Crews |
3/11/2022 |
Failed: Fire - Fire Final |
Control Dampers Not Operating |
Lance Hill |
3/11/2022 |
Passed: Building - Final |
|
Troy Crews |
3/15/2022 |
Passed: Fire - Fire Final |
|
Lance Hill |
3/15/2022 |
(Requested) Fire-Operational Test - Sprinkler/Standpipe |
|
|
|
(Requested) Fire-Operational Test - Chemical/Gaseous Agent |
|
|
|