Columbia County is committed to ensuring accessibility to this website regardless of disability. If anyone encounters a feature on this website that is inaccessible due to a disability, please contact the County Manger’s Office and the Columbia County Board of County Commissioners at (386) 758-1005. You may also email that office at patrick_weaver@columbiacountyfla.com and provide a brief description of the inaccessible feature. The County will either correct the inaccessible feature or, if correction is not possible due to technical limitations, provide the desired information through alternative means.

Skip to content

Columbia County, FL | Permit Details

Additions Permit
Address 389 NW QUINTEN ST
LAKE CITY, FL 32055
Parcel #: 05068-000
Acres: 38.47
Owner: Columbia County, Florida
Subdivision:
Zoning: I
Flood Zone: X
District: 1
Application #: 47124
Permit #: 000040782
Related Permit:
Submitted: Thursday, October 8, 2020
Issued: Friday, October 23, 2020
Expires: Sunday, September 11, 2022
Completed:
Status: Permit Issued
Septic Release? Yes
Notes:
APPROVED SPECIAL EXCEPTION (SE0622) FOR DETENTION FACILITY EXPANSION
Job Details
Is this an addition for commercial or residential use? Commercial
Description of addition: Dormitory Pod for existing Detention Facility
Total Estimated Cost 16100000.00
Heated Area (Sqft) 37500
Total Area (Sqft) 37500
Stories 2
Building Height 30
Select driveway access to property: Existing Drive
Fire sprinklers? Yes
Building Code Construction Type II
Building Code Occupancy Types Institutional
Building Code Element B
Design Occupant Load 268
Setbacks Front 20'
Setback Side 1 15'
Setback Side 2 15'
Setback Rear 15'
Septic# (00-0000) or (X00-000) X20
Dev Permit # F023-
Building Code Edition Florida Building Code 2017 6th Edition & 2014 National Electrical Code
Elevation regulation Site & Development Plan
Finished floor requirement 179.1'
Requirement needed By Nailing Inspection
Document needed is a Surveyor letter giving the Finished Floor Elevation
Document receieved Yes
Fema map number 12023C0285D
Review Notes
8/24/2020 Application pending.
10/13/2020 Zoning Review - Reviewed
10/13/2020 Plan Review - Reviewed
10/23/2020 Permit Issued Permit #000040782 created and approved.
Contractors
Name/ Business License Title Role
William P Byrne
Ajax Building Company Llc
County License & State License & Liability Insurance & Workers Comp Expired.
CGC042112 Cert. General Contractor
Erik W Worthmann
Comfort Temp Company/dba Ct Mechanical
CMC1249305 Cert. Mechanical Subcontractor
Eric H Touchton
Touchton Plumbing Contractors Inc
County License & State License Expired.
CFC056489 Cert. Plumbing Subcontractor
Thomas Stalvey
Ace Electric Inc Of Valdosta Georgia
County License & State License Expired.
EC0001433 Cert. Electrical Subcontractor
Ronald Benke
Cox Fire Protection Inc
County License & State License & Liability Insurance & Workers Comp Expired.
FPC12-000062 Cert. Fire/water System Subcontractor
Inspections
Inspection Notes Performed By Date
Passed: Electrical - Temporary Service Troy Crews 11/25/2020
Release to power company Troy Crews 11/25/2020
Passed: Building - Footer Partial Cell Foundations Troy Crews 1/21/2021
Passed: Engineering - Setbacks Troy Crews 1/21/2021
Passed: Plumbing/Gas - 1st Underground Rough–In Waste Lines South Line Of Building Troy Crews 1/21/2021
Passed: Building - Footer South End And ,southeast Cell Footers Troy Crews 1/26/2021
Passed: Engineering - Setbacks Troy Crews 1/26/2021
Passed: Plumbing/Gas - 1st Underground Rough–In Northwest Section Troy Crews 1/27/2021
Passed: Electrical - 1st Underground Rough–In Troy Crews 1/29/2021
Passed: Plumbing/Gas - 1st Underground Rough–In Troy Crews 1/29/2021
Passed: Building - Footer 3 Column Pads East Side One 12 Ft. Two 5 Ft. Troy Crews 2/11/2021
Passed: Engineering - Setbacks Troy Crews 2/11/2021
Passed: Building - Footer 5x52ft. Deep Columns West Side Troy Crews 2/18/2021
Passed: Engineering - Setbacks Troy Crews 2/18/2021
Passed: Plumbing/Gas - 1st Underground Rough–In Tie In Of 2 Main Sewer Lines With 2 Way Clean Out Troy Crews 2/25/2021
Passed: Building - Footer 14 Ft. Pads And One 3x3 Pad Troy Crews 2/26/2021
Passed: Engineering - Setbacks Troy Crews 2/26/2021
Passed: Building - Monolithic Slab Troy Crews 3/5/2021
Passed: Engineering - Setbacks Troy Crews 3/5/2021
Passed: Building - Monolithic Slab Troy Crews 3/8/2021
Passed: Engineering - Setbacks Troy Crews 3/8/2021
Passed: Building - Slab Electric Room Troy Crews 3/29/2021
Passed: Building - Monolithic Slab Troy Crews 3/29/2021
Passed: Engineering - Setbacks Troy Crews 3/29/2021
Passed: Building - Masonry Wall Reinforcing Sw Corner North Of Electric Room Troy Crews 4/6/2021
Passed: Building - Masonry Wall Reinforcing South Side Of Connecting Corridor And N.w. Corner Troy Crews 4/8/2021
Passed: Building - Masonry Wall Reinforcing North Side Of Corridor And Various First Lift Block Cells Troy Crews 4/12/2021
Cancelled: Building - Masonry Wall Reinforcing Troy Crews 4/13/2021
Passed: Building - Framing Anchor Bolts At Red Iron Beams. Troy Crews 4/14/2021
Passed: Building - Masonry Wall Reinforcing Troy Crews 4/15/2021
Passed: Building - Monolithic Slab Condenser Slabs South And North Troy Crews 4/15/2021
Passed: Engineering - Setbacks Troy Crews 4/15/2021
Passed: Building - Masonry Wall Reinforcing Troy Crews 4/16/2021
Passed: Building - Masonry Wall Reinforcing Center Section Interior Walls First Lift And Partial Second Lift. Troy Crews 4/20/2021
Passed: Building - Masonry Wall Reinforcing Troy Crews 4/21/2021
Passed: Building - Masonry Wall Reinforcing Troy Crews 4/22/2021
Passed: Building - Masonry Wall Reinforcing Troy Crews 4/26/2021
Passed: Building - Masonry Wall Reinforcing Top Out Electric Room Area And Partial Interior Hallways Troy Crews 4/28/2021
Passed: Building - Masonry Wall Reinforcing Troy Crews 4/29/2021
Passed: Building - Framing Troy Crews 5/7/2021
Passed: Building - Slab Troy Crews 5/11/2021
Passed: Building - Slab Troy Crews 5/19/2021
Passed: Building - Masonry Wall Reinforcing Troy Crews 5/20/2021
Passed: Building - Masonry Wall Reinforcing Troy Crews 5/25/2021
Rescheduled 5/27/2021:Building - Masonry Wall Reinforcing Troy Crews 5/26/2021
Rescheduled 5/27/2021:Building - Framing Troy Crews 5/26/2021
Passed: Building - Masonry Wall Reinforcing Troy Crews 5/27/2021
Passed: Building - Framing Troy Crews 5/27/2021
Passed: Building - Slab Troy Crews 6/2/2021
Passed: Building - Masonry Wall Reinforcing Troy Crews 6/2/2021
Passed: Building - Masonry Wall Reinforcing Troy Crews 6/3/2021
Passed: Plumbing/Gas - 2nd Rough-In Hot Water Lines Pressure 100p.s.i. Troy Crews 6/3/2021
Passed: Building - Masonry Wall Reinforcing Troy Crews 6/4/2021
Passed: Plumbing/Gas - 2nd Rough-In Troy Crews 6/4/2021
Passed: Building - Lintel/Tie Beam Troy Crews 6/8/2021
Passed: Building - Masonry Wall Reinforcing Troy Crews 6/8/2021
Passed: Building - Masonry Wall Reinforcing Troy Crews 6/10/2021
Passed: Building - Masonry Wall Reinforcing Troy Crews 6/14/2021
Passed: Building - Masonry Wall Reinforcing Troy Crews 6/15/2021
Passed: Building - Lintel/Tie Beam Troy Crews 6/16/2021
Passed: Building - Masonry Wall Reinforcing Troy Crews 6/16/2021
Passed: Building - Framing Troy Crews 6/16/2021
Passed: Building - Fire Rated Wall Troy Crews 6/16/2021
Passed: Building - Masonry Wall Reinforcing Troy Crews 6/17/2021
Passed: Building - Masonry Wall Reinforcing Troy Crews 6/18/2021
Passed: Building - Rated Assembly Fastening Troy Crews 6/18/2021
Passed: Building - Lintel/Tie Beam Troy Crews 6/21/2021
Passed: Building - Masonry Wall Reinforcing Troy Crews 6/21/2021
Passed: Building - Masonry Wall Reinforcing Troy Crews 6/22/2021
Passed: Building - Fire Rated Wall Troy Crews 6/22/2021
Passed: Building - Lintel/Tie Beam Troy Crews 6/23/2021
Passed: Building - Masonry Wall Reinforcing Troy Crews 6/23/2021
Passed: Building - Rated Assembly Fastening Troy Crews 6/23/2021
Passed: Building - Fire Rated Wall Troy Crews 6/23/2021
Passed: Building - Masonry Wall Reinforcing Troy Crews 6/24/2021
Passed: Building - Ext Strapping/Wall Sheathing South Side Corridor Troy Crews 6/24/2021
Passed: Building - Rated Assembly Fastening Troy Crews 6/24/2021
Passed: Building - Masonry Wall Reinforcing Troy Crews 6/25/2021
Passed: Building - Rated Assembly Fastening Troy Crews 6/25/2021
Passed: Building - Fire Rated Wall Troy Crews 6/25/2021
Passed: Building - Lintel/Tie Beam Troy Crews 7/1/2021
Passed: Building - Masonry Wall Reinforcing Troy Crews 7/1/2021
Passed: Building - Rated Assembly Fastening Troy Crews 7/9/2021
Passed: Building - Fire Rated Wall Troy Crews 7/9/2021
Passed: Building - Wall Sheathing Troy Crews 7/12/2021
Passed: Building - Slab Pictures Received Troy Crews 7/21/2021
Passed: Building - Masonry Wall Reinforcing Pictures Received Troy Crews 7/21/2021
Passed: Building - Footer Pictures Received Troy Crews 7/22/2021
Passed: Engineering - Setbacks Troy Crews 7/22/2021
Passed: Building - Masonry Wall Reinforcing Pictures Received Troy Crews 7/22/2021
Passed: Building - Framing Troy Crews 7/29/2021
Passed: Building - Masonry Wall Reinforcing Troy Crews 7/29/2021
Passed: Building - Lintel/Tie Beam Troy Crews 7/30/2021
Passed: Building - Fire Rated Wall Troy Crews 8/4/2021
Passed: Building - Masonry Wall Reinforcing Troy Crews 8/5/2021
Passed: Building - Rated Assembly Fastening Troy Crews 8/5/2021
Cancelled: Mechanical - Rough In Troy Crews 8/10/2021
Passed: Building - Framing Troy Crews 8/11/2021
Passed: Building - Fire Rated Wall Troy Crews 8/11/2021
Passed: Mechanical - Rough In Pressure Test Anthony Aslan 8/11/2021
Passed: Building - Lintel/Tie Beam Troy Crews 8/16/2021
Passed: Building - Masonry Wall Reinforcing Troy Crews 8/16/2021
Passed: Building - Masonry Wall Reinforcing Troy Crews 8/17/2021
Passed: Building - Masonry Wall Reinforcing Troy Crews 8/18/2021
Passed: Mechanical - Rough In Pressure Test Anthony Aslan 8/18/2021
Passed: Building - Masonry Wall Reinforcing Troy Crews 8/19/2021
Passed: Building - Lintel/Tie Beam Troy Crews 8/23/2021
Passed: Building - Masonry Wall Reinforcing Make Sure #4 Bars Are Changed Out To #5 Troy Crews 8/23/2021
Passed: Building - Masonry Wall Reinforcing # 4 Bar Each Cell Troy Crews 8/24/2021
Passed: Building - Masonry Wall Reinforcing Also 2 Wings At Door Area Troy Crews 8/27/2021
Passed: Building - Slab Troy Crews 9/7/2021
Failed: Mechanical - Pipe Pressure Test Could Not Build Pressure, However Did Check Some Duct For Wrap Troy Crews 9/8/2021
Failed: Mechanical - Performance Test and Balance No Pressure Troy Crews 9/8/2021
Passed: Building - Masonry Wall Reinforcing Troy Crews 9/16/2021
Passed: Plumbing/Gas - Water Pipe Troy Crews 9/20/2021
Passed: Mechanical - Rough In Leak Test Smoke Anthony Aslan 9/20/2021
Passed: Building - Masonry Wall Reinforcing Troy Crews 9/22/2021
Passed: Building - Lintel/Tie Beam Troy Crews 9/27/2021
Passed: Building - Masonry Wall Reinforcing Troy Crews 9/27/2021
Passed: Building - Masonry Wall Reinforcing Troy Crews 9/29/2021
Passed: Mechanical - Pipe Pressure Test #5 Anthony Aslan 9/30/2021
Passed: Electrical - Permanent Power Troy Crews 10/1/2021
Release to power company Troy Crews 10/1/2021
Passed: Building - Footer Troy Crews 10/5/2021
Passed: Engineering - Setbacks Troy Crews 10/5/2021
Passed: Building - Framing Troy Crews 10/7/2021
Passed: Mechanical - Rough In Anthony Aslan 10/11/2021
Passed: Plumbing/Gas - 2nd Rough-In Gas Test On Line Anthony Aslan 10/12/2021
Passed: Building - Rated Assembly Fastening Troy Crews 10/12/2021
Passed: Mechanical - Pipe Pressure Test Anthony Aslan 10/14/2021
Passed: Building - Rated Assembly Fastening Troy Crews 10/15/2021
Passed: Electrical - Above Ceiling Troy Crews 10/20/2021
Passed: Mechanical - Rough In East Duct Anthony Aslan 10/21/2021
Passed: Building - Wall Sheathing Troy Crews 10/26/2021
Passed: Building - Wall Sheathing Troy Crews 10/27/2021
Passed: Mechanical - Rough In Troy Crews 11/1/2021
Passed: Mechanical - Rough In To Allow For Grid Ceiling Channel To Be Installed Anthony Aslan 11/5/2021
Passed: Fire - Operational Test - Sprinkler/Standpipe Pressure Test Of Overhead Sprinkler System. 4" Fdc Pipe Not Tested, Will Be Inspected/tested At A Later Date. Lance Hill 12/22/2021
Passed: Plumbing/Gas - 2nd Rough-In Troy Crews 1/7/2022
Passed: Electrical - Above Ceiling Troy Crews 1/25/2022
Passed: Building - Final Release Of C.o. Pending F.d. And Smoke Test Troy Crews 2/22/2022
Passed: Fire - Operational Test - Sprinkler/Standpipe Lance Hill 2/22/2022
Passed: Fire - Operational Test - Alarm System Lance Hill 2/22/2022
Failed: Fire - Fire Final Smoke Ejection System Not Operational Yet Lance Hill 2/23/2022
Cancelled: Fire - Operational Test - Sprinkler/Standpipe Completed 2/22/22 Lance Hill 2/23/2022
Cancelled: Fire - Operational Test - Alarm System Completed 2/22/22 Lance Hill 2/23/2022
Cancelled: Fire - Fire Final Rescheduled For A Later Date Lance Hill 2/23/2022
Passed: Fire - Operational Test - Sprinkler/Standpipe Completed And Passed Pressure Test Of Standpipe 12/30/21 Lance Hill 2/23/2022
Failed: Building - Final Control Dampers Not Operating Troy Crews 3/11/2022
Failed: Fire - Fire Final Control Dampers Not Operating Lance Hill 3/11/2022
Passed: Building - Final Troy Crews 3/15/2022
Passed: Fire - Fire Final Lance Hill 3/15/2022
(Requested) Fire-Operational Test - Sprinkler/Standpipe
(Requested) Fire-Operational Test - Chemical/Gaseous Agent
Documents
File Name Date File Size
Project Manual Volume 2.pdf 2023.12.26 12.24MB
Plumbing Subcontractor Form Only.pdf 2023.12.26 325.95kB
Suppliment Columbia County Jail Pod Flacom.pdf 2023.12.26 1.75MB
Electrical Sub Form-stalvey 2020-10-14 10.47.23.808.pdf 2023.12.26 338.44kB
00 00 01 Ccdf Seals Page 07-24-2020 2020-10-08 07.08.48.816.pdf 2023.12.26 6.26MB
Termite Treatment Jail Project 1 2021-03-05 13.53.45.795.pdf 2023.12.26 56.25kB
As-101 - Architectural Site Plan Details 2020-10-08 07.21.55.593.pdf 2023.12.26 881.16kB
A-series 2020-10-08 07.22.09.484.pdf 2023.12.26 22.07MB
00 00 01 Ccdf Seals Page 07-24-2020.pdf 2023.12.26 6.26MB
Soil Reports 40782 Jail 2021-01-22 08.09.58.635.zip 2023.12.26 7.00MB
Qd-series 2020-10-08 07.23.05.64.pdf 2023.12.26 11.38MB
Rfi Cc-30 Permit 40782 Jail 2021-01-22 07.20.35.941.pdf 2023.12.26 157.51kB
M-121c Upper 2021-08-18 11.29.12.849.pdf 2023.12.26 1.16MB
Ty-series 2020-10-08 07.23.21.221.pdf 2023.12.26 5.40MB
Power Release-electrical-permanent Power 20211001.pdf 2023.12.26 38.88kB
Original Permit 20201023.pdf 2023.12.26 44.64kB
Surveyor Finish Floor Elevation Letter 47124 2021-03-31 16.06.25.451.pdf 2023.12.26 310.86kB
M-321c - Upper Tier Smoke 2021-08-12 08.47.01.394.pdf 2023.12.26 1,001.96kB
Termite Treatment Jail 3 2021-03-05 13.54.13.733.pdf 2023.12.26 57.30kB
Owner And Contractor Signature Page 20201008 095111.pdf 2023.12.26 939.11kB
Concrete Testing Jail 40782 2021-12-09 07.06.31.253.pdf 2023.12.26 843.36kB
C-series 2020-10-08 07.22.31.79.pdf 2023.12.26 17.60MB
Se0622 Approved Special Exception Site Plan 2020-10-13 10.02.46.578.pdf 2023.12.26 40.08MB
Contractor Letter Of Authorization 20201008 095007.pdf 2023.12.26 98.77kB
Ccdf- Inspection Pictures 2021-07-27 14.14.15.259.msg 2023.12.26 6.71MB
Win_20210305_10_22_30_pro 2021-03-05 10.32.43.967.jpg 2023.12.26 428.46kB
Power Release-electrical-temporary Service 20201125.pdf 2023.12.26 38.75kB
Project Manual Volume 1.pdf 2023.12.26 9.75MB
Termite Treatment Jail 4 2021-03-05 13.54.29.172.pdf 2023.12.26 57.35kB
Win_20210305_10_23_24_pro 2021-03-05 10.32.56.686.jpg 2023.12.26 446.23kB
Jail Elevation Confirmation 2021-04-01 07.34.00.110.pdf 2023.12.26 310.86kB
Rfi Cc-48 Jail 2021-01-22 07.20.56.457.pdf 2023.12.26 133.52kB
Soil Treatment Jail 2021-03-30 07.27.20.368.pdf 2023.12.26 136.40kB
Termite Treatment Jail 2 2021-03-05 13.54.00.624.pdf 2023.12.26 63.98kB