Inspection |
Notes |
Performed By |
Date |
Passed: Engineering - Initial Driveway |
|
Mccormick, David |
10/23/2020 |
Passed: Building - Footer |
|
Matt Forsyth |
11/10/2020 |
Passed: Engineering - Setbacks |
|
Matt Forsyth |
11/10/2020 |
Cancelled: Building - Footer |
|
Matt Forsyth |
11/12/2020 |
Passed: Plumbing/Gas - 1st Underground Rough–In |
|
Matt Forsyth |
12/1/2020 |
Passed: Building - Slab |
Need To Chair Up Front Perimeter #5 Bar Need Concrete Ticket Showing Fiber Mesh Used In Slab Left In Permit Box |
Matt Forsyth |
12/4/2020 |
Passed: Electrical - Temporary Service |
|
Matt Forsyth |
12/29/2020 |
Release to power company |
|
Matt Forsyth |
12/29/2020 |
Release to power company |
|
|
1/21/2021 |
Passed: Building - Roof Decking |
|
Matt Forsyth |
1/21/2021 |
Passed: Building - Wall Sheathing |
|
Matt Forsyth |
1/21/2021 |
Failed: Building - Framing |
Missed Nailing On Some Headers And Porch Beams |
Matt Forsyth |
1/27/2021 |
Failed: Building - Framing |
Check All Headers For Correct Nail Spacing Including Outside Of Porch Beams, Install Porch Post With Strapping,and Missing Heavy Girder Tie Downs At Garage |
Troy Crews |
2/5/2021 |
Passed: Building - Framing |
Porch Strapping Will Be Installed After Rollock Masonry |
Matt Forsyth |
2/9/2021 |
Passed: Building - Strapping |
Strapping Complete |
Matt Forsyth |
2/18/2021 |
Passed: Electrical - 2nd Rough-In |
|
Matt Forsyth |
2/19/2021 |
Passed: Mechanical - Rough In |
|
Matt Forsyth |
2/19/2021 |
Passed: Plumbing/Gas - 2nd Rough-In |
|
Matt Forsyth |
2/19/2021 |
Passed: Building - Insulation |
|
Matt Forsyth |
3/9/2021 |
Passed: Electrical - Permanent Power |
Need Septic And Drive Releases-- Drive Rec'd-- Need Septic |
Matt Forsyth |
4/8/2021 |
Passed: Engineering - Final Driveway |
|
Mccormick, David |
4/14/2021 |
Septic Release Inspection |
|
Health Dept |
4/14/2021 |
Release to power company |
|
Melissa Garber |
4/15/2021 |
Passed: Building - Final |
|
Matt Forsyth |
4/28/2021 |