Columbia County is committed to ensuring accessibility to this website regardless of disability. If anyone encounters a feature on this website that is inaccessible due to a disability, please contact the County Manger’s Office and the Columbia County Board of County Commissioners at (386) 758-1005. You may also email that office at patrick_weaver@columbiacountyfla.com and provide a brief description of the inaccessible feature. The County will either correct the inaccessible feature or, if correction is not possible due to technical limitations, provide the desired information through alternative means.

Skip to content

Columbia County, FL | Permit Details

New Residential Construction Permit

Address 451 NW COUNTRY LAKE DR
LAKE CITY, FL 32055
Parcel #: 02267-432
Acres: 0.93
Owner: Margaret Mckenzie
Subdivision: Country Lake In Woodborough Phase 4
Zoning: RSF-2
Flood Zone: X
District: 3
Application #: 47419
Permit #: 000040759
Related Permit: Culvert: 000040760
Submitted: Thursday, October 8, 2020
Issued: Wednesday, December 16, 2020
Expires: Tuesday, July 27, 2021
Completed: Tuesday, July 27, 2021
Status: Completed
Septic Release? Yes
Notes:
FINISHED FLOOR ELEVATION CONFIRMATION LETTER REC'D AT 138.03'
Job Details
Finished floor requirement
Fema map number 12023C0190D
Other job details: UTILITY POLE
Septic # (00-0000) or (X00-000) X-02-0033
Type of RV Permit: Health Department Release Form
Electrical Code Edition Florida Building Code 2014 5th Edition & 2011 National Electrical Code
Review Notes
10/1/2020 Application pending.
10/8/2020 Point Review - On Hold-Incomplete
10/8/2020 Point Review - Printed-Online Application
10/12/2020 Zoning Review - Reviewed
10/21/2020 Zoning Review - Reviewed
10/21/2020 Plan Review - Reviewed
10/21/2020 Final Review - Payment Needed
10/21/2020 Permit Issued Permit #000040759 created and approved.
12/16/2020 Permit reissued to reflect updated information.
6/21/2021 Final Review - Payment Needed JW SENT AN EMAIL OUT 10.12.20 ENGINEER MFE LETTER RECEIVED ON 12-16-20
Contractors
Name/ Business License Title Role
Isaiah Cully
Ic Construction Llc
CBC1259655 Building Contractor Contractor
Clinton G Wilson
Wilson Heat & Air Inc
CAC057886 Class B A/c Subcontractor
Everton D Ruddock
D&s Lighting Inc
EC13003800 Electrical Contractor Subcontractor
Cody Barrs
Barrs Plumbing Inc
CFC1427145 Plumbing Contractor Subcontractor
Tyler M Turner
Tmt Roofing Llc
CCC1330410 Cert Roofing Subcontractor
Inspections
Inspection Notes Performed By Date
Passed: Building - Footer Need To Make Sure Lot Does Not Have Set Floor Elevation Troy Crews 11/12/2020
Passed: Engineering - Setbacks Troy Crews 11/12/2020
Rescheduled 12/4/2020:Plumbing/Gas - 1st Underground Rough–In Troy Crews 12/3/2020
Passed: Plumbing/Gas - 1st Underground Rough–In Ac Chase Line Over 50 Feet Suction Line Will Need To Be Upsized, Also Put Fall On Dryer Line To Outside Troy Crews 12/4/2020
Passed: Building - Slab Confirm 12 Inch Above Rd. Troy Crews 12/9/2020
Passed: Electrical - Temporary Service Troy Crews 12/29/2020
Release to power company Troy Crews 12/29/2020
Passed: Building - Roof Decking Troy Crews 2/3/2021
Passed: Building - Wall Sheathing Troy Crews 2/3/2021
Failed: Building - Framing Need Two King Studs All Openings Over 6ft., Missing Heavy Tie Downs At Garage Opening, Also Need Elevation/engineer Letter Troy Crews 2/5/2021
Failed: Building - Insulation Requested By Builder, Need Framing Inspection Done That Failed, Also Need Electric, Plumbing, And H.v.a.c. Inspections Passed Prior To Insulation May Have To Be Pulled Out In Areas. Troy Crews 4/8/2021
Passed: Electrical - 2nd Rough-In Anthony Aslan 4/9/2021
Passed: Plumbing/Gas - 2nd Rough-In Anthony Aslan 4/9/2021
Failed: Building - Framing Insulation Covering Anchors Could Not Verify. Truss T11g Could Not Verify Engineering, Spray Foam Insulation Encapsulated. Truss T12 Has Inadequate Strapping For Uplift, Also Could Not Verify Truss Strapping On Porches. Could Not Verify Outlooker Strapping Encapsulated In Spray Foam Insulation Anthony Aslan 4/9/2021
Failed: Mechanical - Rough In Could Not Verify Kitchen Exhaust Exiting Termination, Kitchen Hood Vent Needs 3 Screws At Joints Of Pipe. Need To Add Straps To Duct Flex. Return Mixing Box Knocked Off Support. Anthony Aslan 4/9/2021
Passed: Mechanical - Rough In Made Corrections Anthony Aslan 4/15/2021
Failed: Building - Framing Truss No Strapped. See Notes On Previous Inspection. Anthony Aslan 4/15/2021
Passed: Building - Insulation Anthony Aslan 4/15/2021
Septic Release Inspection Health Dept 6/2/2021
Failed: Electrical - Permanent Power No Front Door Anthony Aslan 6/23/2021
Passed: Electrical - Permanent Power Rec'd Pictures Anthony Aslan 6/25/2021
Passed: Engineering - Initial Driveway Mccormick, David 7/2/2021
Release to power company Culvert Has Been Finaled 7.12.21 By D.mccormick Laurie Hodson 7/9/2021
Passed: Engineering - Final Driveway Mccormick, David 7/12/2021
Passed: Electrical - Permanent Power Changed Out To Fpl Approved Can Troy Crews 7/12/2021
Release to power company Troy Crews 7/12/2021
Cancelled: Building - Final Anthony Aslan 7/20/2021
Failed: Building - Final 1) A/c Condenser Pad Covered By Mulch 2) Back Porch Outlet Has Open Ground Not Tripping Gfci 3) Bath By Garage Door Gfci Reversed Hot & Neutral 4) Disposal Under Kitchen Sink Gfci Open Ground 5) Kitchen Exhaust No Discharge Grill Anthony Aslan 7/22/2021
Passed: Building - Framing Items Corrected Per Builder Troy Crews 7/22/2021
Failed: Building - Final M1503.1general. range Hoods Shall Discharge To The Outdoors Through A Duct. The Duct Serving The Hood Shall Have A Smooth Interior Surface, Shall Be Air Tight, Shall Be Equipped With A Back-draft Damper And Shall Be Independent Of All Other Exhaust Systems. Ducts Serving Range Hoods Shall Not Terminate In An Attic Or Crawl Space Or Areas Inside The Building. exception: Where Installed In Accordance With The Manufacturer’s Instructions, And Where Mechanical Or Natural Ventilation Is Otherwise Provided, Listed And Labeled Ductless Range Hoods Shall Not Be Required To Discharge To The Outdoors. m1305.1.4.1ground Clearance. equipment And Appliances Supported From The Ground Shall Be Level And Firmly Supported On A Concrete Slab Or Other Approved Material Extending Not Less Than 3 Inches (76 Mm) Above The Adjoining Ground. Such Support Shall Be In Accordance With The Manufacturer’s Installation Instructions. Appliances Suspended From The Floor Shall Have A Clearance Of Not Less Than 6 Inches (152 Mm) From The Ground. r318.5protection Against Decay And Termites. condensate Lines, Irrigation/sprinkler System Risers For Spray Heads, And Roof Downspouts Shall Discharge At Least 1 Foot (305 Mm) Away From The Structure Sidewall, Whether By Underground Piping, Tail Extensions Or Splash Blocks. Gutters With Downspouts Are Required On All Buildings With Eaves Of Less Than 6 Inches (152 Mm) Horizontal Projection Except For Gable End Rakes Or On A Roof Above Another Roof. Anthony Aslan 7/23/2021
Passed: Building - Final Corrections Made Anthony Aslan 7/27/2021
Documents
File Name Date File Size