Inspection |
Notes |
Performed By |
Date |
Passed: Engineering - Initial Driveway |
|
Mccormick, David |
10/21/2020 |
Passed: Building - Footer |
|
Matt Forsyth |
12/22/2020 |
Passed: Engineering - Setbacks |
|
Matt Forsyth |
12/22/2020 |
Passed: Electrical - Temporary Service |
|
Matt Forsyth |
12/28/2020 |
Release to power company |
|
Matt Forsyth |
12/28/2020 |
Passed: Plumbing/Gas - 1st Underground Rough–In |
|
Troy Crews |
1/8/2021 |
Passed: Building - Slab |
Fibermesh Concrete |
Matt Forsyth |
1/13/2021 |
Failed: Building - Framing |
Need 24 Inch Strapping On Post 2 Header Headers Inside Need To Be Nailed Top And Bottom 12 Inches On Center |
Matt Forsyth |
5/7/2021 |
Failed: Electrical - 2nd Rough-In |
Need Larger Nail Plate Above Electrical Panel |
Matt Forsyth |
5/7/2021 |
Passed: Mechanical - Rough In |
|
Matt Forsyth |
5/7/2021 |
Failed: Plumbing/Gas - 2nd Rough-In |
No Pressure On Water System |
Matt Forsyth |
5/7/2021 |
Passed: Electrical - 2nd Rough-In |
|
Matt Forsyth |
5/10/2021 |
Passed: Building - Framing |
|
Matt Forsyth |
5/17/2021 |
Passed: Building - Insulation |
|
Matt Forsyth |
5/28/2021 |
Rescheduled 6/9/2021:Plumbing/Gas - 2nd Rough-In |
|
Matt Forsyth |
6/8/2021 |
Passed: Plumbing/Gas - 2nd Rough-In |
Water Supply Under Pressure |
Matt Forsyth |
6/9/2021 |
Passed: Electrical - Permanent Power |
Need Septic And Driveway Releases |
Matt Forsyth |
8/12/2021 |
Passed: Engineering - Final Driveway |
|
Mccormick, David |
8/13/2021 |
Release to power company |
|
Melissa Garber |
8/17/2021 |
Septic Release Inspection |
|
Health Dept |
8/17/2021 |
Passed: Building - Final |
Release Pending Pest Final And Follow Up Letter From Engineer On Swale. |
Troy Crews |
8/30/2021 |
Certificate-Release Certificate |
Engineer Final Letter And Final Termite Cert Rec'd |
Troy Crews |
8/31/2021 |