Columbia County is committed to ensuring accessibility to this website regardless of disability. If anyone encounters a feature on this website that is inaccessible due to a disability, please contact the County Manger’s Office and the Columbia County Board of County Commissioners at (386) 758-1005. You may also email that office at patrick_weaver@columbiacountyfla.com and provide a brief description of the inaccessible feature. The County will either correct the inaccessible feature or, if correction is not possible due to technical limitations, provide the desired information through alternative means.

Skip to content

Columbia County, FL | Permit Details

New Residential Construction Permit

Address 133 SE MARINO WAY
HIGH SPRINGS, FL 32643
Parcel #: 09984-015
Acres: 4.33
Owner: Benson Benjamin
Subdivision: Oleno Estates
Zoning: A-3
Flood Zone: X
District: 4
Application #: 47444
Permit #: 000040743
Related Permit:
Submitted: Friday, September 23, 2022
Issued: Tuesday, October 20, 2020
Expires: Saturday, April 13, 2024
Completed:
Status: Final Review - Payment Needed
Septic Release? Yes
Notes:

Job Details
Elevation regulation Minimum Requirement
Finished floor requirement One foot above the Paved road
Fema map number 12023C0514C
In floodway N
This is the construction of a Single Family Dwelling
Setbacks Front 30
Setback Side 1 25
Setback Side 2 25
Setbacks Rear 25
Stories 1
Heated Area (Sqft) 672
Total Area (Sqft) 749
Building Height 15
Building Code Construction Type V
Building Code Element B
Building Code Occupancy Types Residential
Occupancy Use Title single family
Building Code Edition Florida Building Code 2017 6th Edition & 2014 National Electrical Code
Septic# (00-0000) or (X00-000) 20-0787
Review Notes
10/6/2020 Point Review - Received-Hard Copy Application
10/6/2020 Point Review - Reviewed
10/12/2020 Plan Review - Documents Required
10/19/2020 Plan Review - Documents Required
10/19/2020 Plan Review - Documents Required
10/20/2020 Plan Review - Reviewed
10/20/2020 Zoning Review - Reviewed
10/20/2020 Final Review - Documents Required
10/20/2020 Final Review - Payment Needed
10/20/2020 Permit Issued
11/13/2023 Final Review - Payment Needed
Contractors
Name/ Business License Title Role
Inspections
Inspection Notes Performed By Date
Septic Release Inspection Health Dept 10/20/2020
Passed: Electrical - Temporary Service Troy Crews 10/21/2020
Release to power company Troy Crews 10/21/2020
Passed: Building - Footer Troy Crews 11/5/2020
Passed: Engineering - Setbacks Troy Crews 11/5/2020
Cancelled: Building - Strapping Anthony Aslan 12/21/2020
Passed: Building - Strapping Floor Framing And Strapping Troy Crews 12/28/2020
Passed: Building - Wall Sheathing Anthony Aslan 3/12/2021
Passed: Building - Roof Decking Anthony Aslan 3/12/2021
Passed: Electrical - 1st Underground Rough–In Anthony Aslan 8/2/2021
Passed: Plumbing/Gas - 1st Underground Rough–In Anthony Aslan 11/23/2021
Passed: Plumbing/Gas - Tub Set/Shower Pan Anthony Aslan 11/23/2021
Passed: Plumbing/Gas - 2nd Rough-In Anthony Aslan 11/23/2021
Passed: Electrical - 2nd Rough-In Anthony Aslan 11/23/2021
Passed: Building - Framing Anthony Aslan 11/23/2021
Passed: Building - Insulation Anthony Aslan 12/8/2021
Rescheduled 9/8/2022:Engineering - Spot Check Emaleigh Williams 9/6/2022
Passed: Engineering - Spot Check Anthony Aslan 9/8/2022
Passed: Engineering - Spot Check Checked Bathroom Anthony Aslan 3/6/2023
Passed: Electrical - Permanent Power Anthony Aslan 10/16/2023
Release to power company Anthony Aslan 10/16/2023