Inspection |
Notes |
Performed By |
Date |
Passed: Engineering - Initial Driveway |
|
Mccormick, David |
10/15/2020 |
Passed: Building - Footer |
|
Anthony Aslan |
1/7/2021 |
Passed: Engineering - Setbacks |
Need To Be Verified By Survey, Tight Lots. |
Anthony Aslan |
1/7/2021 |
Passed: Plumbing/Gas - 1st Underground Rough–In |
|
Anthony Aslan |
1/22/2021 |
Passed: Building - Slab |
|
Anthony Aslan |
2/1/2021 |
Passed: Building - Roof Decking |
|
Anthony Aslan |
2/15/2021 |
Passed: Building - Wall Sheathing |
|
Anthony Aslan |
2/15/2021 |
Cancelled: Building - Ext Strapping/Wall Sheathing |
|
Anthony Aslan |
2/15/2021 |
Failed: Building - Framing |
Garage End Wall Is Calling For Double Bottom Plate, Need Letter From Engineer For Single Bottom Plate. |
Anthony Aslan |
4/15/2021 |
Passed: Building - Strapping |
|
Anthony Aslan |
4/15/2021 |
Failed: Electrical - 2nd Rough-In |
Exhaust Fans Need To Be Wired Into Fan. |
Anthony Aslan |
4/15/2021 |
Failed: Mechanical - Rough In |
Hall Exhaust Fan Venting Needs Strapping. |
Anthony Aslan |
4/15/2021 |
Passed: Plumbing/Gas - 2nd Rough-In |
|
Anthony Aslan |
4/15/2021 |
Passed: Mechanical - Rough In |
|
Anthony Aslan |
4/21/2021 |
Passed: Electrical - 2nd Rough-In |
|
Anthony Aslan |
4/21/2021 |
Passed: Building - Insulation |
|
Anthony Aslan |
4/21/2021 |
Passed: Building - Framing |
Rec'd Letter |
Anthony Aslan |
4/21/2021 |
Septic Release Inspection |
|
Health Dept |
6/16/2021 |
Passed: Electrical - Permanent Power |
Need Culvert Release |
Anthony Aslan |
6/29/2021 |
Release to power company |
Culvert Finaled 7.12.21 |
Anthony Aslan |
7/12/2021 |
Passed: Engineering - Final Driveway |
|
Mccormick, David |
7/12/2021 |
Passed: Building - Final |
|
Anthony Aslan |
8/19/2021 |