Permit Details

Permit Search

Permit

Mobile Home

332 SW KING ST
LAKE CITY, FL 32024

Permit #
000040670
Application #
47208
Status Completed
  1. Submitted Sep 3, 2020
  2. Issued Oct 5, 2020
  3. Expires Jun 13, 2021
  4. Completed Dec 15, 2020

Property

Parcel #
03300-018
Owner
Suhl Amber Elizabeth Hardee
Acres
1.73
Subdivision
—
Zoning
A-3
Flood zone
X
District
5

Permit

Status
Completed
Septic release
Released
Related permit
—

Job Details

Elevation regulation
Minimum Requirement
Finished floor requirement
One foot above the road
Fema map number
12023C0381D
In floodway
N
Mobile Home is a:
Double Wide
Year Built
2020
Width (Ft.In)
32
Length (Ft.In)
72
Driveway access to home:
Culvert Waiver
Installation Decal #
61869
Septic #
20-0785
Setbacks Front
30'
Setback Side 1
25'
Setbacks Rear
25'
Dev Permit #
F023-
Setback Side 2
25'
Are you applying for a 5 year temporary permit?
No
Serial #
LOHGA12021150AB
Wind Zone?
2
Residential or Commercial Use?
Residential

Status & Review History

  1. Application pending.
  2. Point Review - On Hold-Incomplete
  3. Point Review - On Hold-Incomplete
  4. Point Review - Processing
  5. Plan Review - Reviewed
  6. Zoning Review - Reviewed
  7. Final Review - Documents Required
  8. Final Review - Payment Needed
  9. Permit Issued

Contractors

  • Robert D Sheppard

    Melvins Mobile Home Service

    License
    IH1025386
    Title
    Mh Installer (ih)
    Role
    Contractor

    County License & Liability Insurance Expired.

  • Glenn Whittington

    Whittington Electric Inc

    License
    EC13002957
    Title
    Electrical Contractor
    Role
    Subcontractor
  • Ronald Bonds Sr

    Style Crest Inc

    License
    CAC1817658
    Title
    Class "b" A/c Contractor
    Role
    Subcontractor

    County License & State License Expired.

Inspections

  1. Dec 14, 2020

    Septic Release Inspection

    Inspected by Health Dept

  2. Dec 15, 2020

    Passed: Mobile Home - Mobile Home Set-Up Final

    Inspected by Matt Forsyth

  3. Dec 15, 2020

    Release to power company

    Inspected by Matt Forsyth

  4. Dec 15, 2020

    Passed: Engineering - Setbacks

    Inspected by Matt Forsyth

  5. Dec 17, 2020

    Release to power company

    Power Company Changed From Fpl To Clay

    Inspected by Melissa Garber