Inspection |
Notes |
Performed By |
Date |
Passed: Plumbing/Gas - 1st Underground Rough–In |
|
Anthony Aslan |
12/23/2020 |
Passed: Building - Monolithic Slab |
|
Troy Crews |
12/29/2020 |
Passed: Engineering - Setbacks |
|
Troy Crews |
12/29/2020 |
Passed: Building - Roof Decking |
|
Anthony Aslan |
1/27/2021 |
Failed: Building - Wall Sheathing |
Need To Check Nail Off, Green Paint Where Missing. |
Anthony Aslan |
1/27/2021 |
Passed: Building - Wall Sheathing |
Nails Installed Where Missed |
Anthony Aslan |
1/28/2021 |
Passed: Building - Framing |
Need Finish Floor Elevation |
Anthony Aslan |
2/17/2021 |
Passed: Electrical - 2nd Rough-In |
|
Anthony Aslan |
3/10/2021 |
Failed: Mechanical - Rough In |
Dryer Vent Has Screws, And Must Be Smooth Pipe Entire Length. No Gaskets On Supply And Return Boots. Exhausts Fan Venting Has No Hanging Straps. |
Anthony Aslan |
3/10/2021 |
Failed: Plumbing/Gas - 2nd Rough-In |
No Water In Tub |
Anthony Aslan |
3/10/2021 |
Passed: Plumbing/Gas - 2nd Rough-In |
|
Anthony Aslan |
3/15/2021 |
Failed: Mechanical - Rough In |
Dryer Pipe Will Exceed 35', All Dryer Vent Joints Need To Be Sealed. |
Anthony Aslan |
3/15/2021 |
Passed: Mechanical - Rough In |
Corrected |
Anthony Aslan |
3/17/2021 |
Passed: Building - Insulation |
|
Anthony Aslan |
3/22/2021 |
Septic Release Inspection |
|
Health Dept |
4/19/2021 |
Passed: Electrical - Permanent Power |
Need Final On Culvert |
Troy Crews |
5/24/2021 |
Passed: Engineering - Initial Driveway |
|
Mccormick, David |
5/26/2021 |
Release to power company |
|
Melissa Garber |
6/4/2021 |
Passed: Engineering - Final Driveway |
|
Mccormick, David |
6/4/2021 |
Passed: Building - Final |
Front Porch Outlet Has Open Ground
pan On Hvac Needs Float Switch |
Anthony Aslan |
7/1/2021 |
Certificate-Release Certificate |
|
Anthony Aslan |
7/2/2021 |