Inspection |
Notes |
Performed By |
Date |
Passed: Engineering - Initial Driveway |
|
Mccormick, David |
9/29/2020 |
Passed: Electrical - Temporary Service |
|
Troy Crews |
10/16/2020 |
Release to power company |
|
Troy Crews |
10/16/2020 |
Passed: Plumbing/Gas - 1st Underground Rough–In |
|
Troy Crews |
11/3/2020 |
Passed: Building - Monolithic Slab |
Need Picture Of Ground Wire, Pota Pottie Onsite Prior To Any Further Inspections Also Note Need Elevation Certificate |
Troy Crews |
11/23/2020 |
Passed: Engineering - Setbacks |
|
Troy Crews |
11/23/2020 |
Failed: Building - Ext Strapping/Wall Sheathing |
Not Complete Check Front Wall Top And By Front Door, Call Back In With Roof Check Shiners. |
Troy Crews |
12/29/2020 |
Passed: Building - Roof Decking |
|
Troy Crews |
12/31/2020 |
Passed: Building - Wall Sheathing |
|
Troy Crews |
12/31/2020 |
Passed: Building - Framing |
|
Troy Crews |
12/31/2020 |
Passed: Electrical - 2nd Rough-In |
|
Troy Crews |
12/31/2020 |
Failed: Plumbing/Gas - 2nd Rough-In |
No Pressure On Plumbing Supply Lines. Need Tub And Shower Pan Filled With Water. |
Anthony Aslan |
1/14/2021 |
Failed: Mechanical - Rough In |
No Turning Vanes In Hard Back 90's In Supply Trunk. |
Anthony Aslan |
1/14/2021 |
Passed: Mechanical - Rough In |
|
Anthony Aslan |
1/15/2021 |
Failed: Plumbing/Gas - 2nd Rough-In |
Tub Leaking, Plumbing Tech. Was There Working, Reschedule. |
Anthony Aslan |
1/15/2021 |
Passed: Building - Insulation |
|
Anthony Aslan |
1/19/2021 |
Passed: Plumbing/Gas - Tub Set/Shower Pan |
|
Anthony Aslan |
1/19/2021 |
Septic Release Inspection |
|
Health Dept |
6/9/2021 |
Passed: Electrical - Permanent Power |
Cannot Release Power Until Elevation Certificate Is Rec'd And Culvert Final Is Approved. |
Anthony Aslan |
6/24/2021 |
Release to power company |
Ec And Culvert Final Rec'd |
Laurie Hodson |
7/13/2021 |
Passed: Engineering - Final Driveway |
|
Mccormick, David |
7/13/2021 |
Passed: Building - Final |
Need Heat Strips Marked Indicating With Size |
Anthony Aslan |
7/23/2021 |