Mobile Home
Permit
| Application #: | 47055 |
| Permit #: |
000040594 |
| Related Permit: |
|
| Submitted: | Friday, August 14, 2020 |
| Issued: | Thursday, September 24, 2020 |
| Expires: | Wednesday, December 16, 2020 |
| Completed: | Wednesday, December 16, 2020 |
| Status: |
Completed |
| Septic Release? |
Yes |
Job Details
| Elevation regulation |
Minimum Requirement |
| Finished floor requirement |
One foot above the road |
| Fema map number |
12023C0485C |
| In floodway |
N |
| Mobile Home is a: |
Single Wide |
| Year Built |
2017 |
| Width (Ft.In) |
16 |
| Length (Ft.In) |
56 |
| Driveway access to home: |
Private Drive |
| Installation Decal # |
49967 |
| Septic # |
20-0699 |
| Setbacks Front |
30' |
| Setback Side 1 |
25' |
| Setbacks Rear |
25' |
| Dev Permit # |
F023- |
| Setback Side 2 |
25' |
| Are you applying for a 5 year temporary permit? |
No |
| Serial # |
flthlct1611g-3233 |
| Wind Zone? |
2 |
| Residential or Commercial Use? |
Residential |
Review Notes
| 8/14/2020 |
Application pending. |
| 8/17/2020 |
Point Review - Printed-Online Application |
| 8/17/2020 |
Point Review - Documents Required |
| 8/17/2020 |
Zoning Review - Reviewed |
| 8/24/2020 |
Plan Review - Reviewed |
| 8/24/2020 |
Final Review - Documents Required |
| 9/23/2020 |
Final Review - Email Sent |
| 9/24/2020 |
Final Review - Payment Needed |
| 9/24/2020 |
Permit Issued |
Contractors
| Name / Business |
License |
Title |
Role |
Robert D Sheppard Melvins Mobile Home Service
|
IH1025386 |
Mh Installer (ih) |
Contractor |
Everton D Ruddock D&s Lighting Inc
|
EC13003800 |
Electrical Contractor |
Subcontractor |
Inspections
| Inspection |
Notes |
Performed By |
Date |
| Passed: Mobile Home - In County Pre-Mobile Home before set-up |
|
Troy Crews |
8/18/2020 |
| Septic Release Inspection |
|
Health Dept |
10/23/2020 |
| Failed: Mobile Home - Mobile Home Set-Up Final |
Screw Clips Down On A.c. Unit And Lift All Duct Work 4 Inches Off Ground |
Troy Crews |
12/14/2020 |
| Passed: Engineering - Setbacks |
|
Troy Crews |
12/14/2020 |
| Passed: Mobile Home - Mobile Home Set-Up Final |
Items Corrected |
Troy Crews |
12/16/2020 |
| Release to power company |
|
Troy Crews |
12/16/2020 |
| Passed: Engineering - Setbacks |
|
Troy Crews |
12/16/2020 |