Permit Details

Permit Search

Permit

Mobile Home

215 SW ALPINE PL
HIGH SPRINGS, FL 32643

Permit #
000040583
Application #
47251
Status Completed
  1. Submitted Sep 15, 2020
  2. Issued Sep 23, 2020
  3. Expires Mar 29, 2021
  4. Completed Sep 30, 2020

Property

Parcel #
09957-029
Owner
Southland, Robert & Sabrina
Acres
0.60
Subdivision
Southland
Zoning
A-3
Flood zone
X
District
4

Permit

Status
Completed
Septic release
Released
Related permit
—

Job Details

Elevation regulation
Minimum Requirement
Finished floor requirement
One foot above the road
Fema map number
12023C0513C
In floodway
N
Mobile Home is a:
Single Wide
Year Built
2020
Width (Ft.In)
16
Length (Ft.In)
76
Driveway access to home:
Existing Drive
Installation Decal #
74553
Septic #
20-0735
Setbacks Front
30'
Setback Side 1
25'
Setbacks Rear
25'
Dev Permit #
F023-
Setback Side 2
25'
Are you applying for a 5 year temporary permit?
No
Serial #
20975
Wind Zone?
2
Residential or Commercial Use?
Residential

Status & Review History

  1. Application pending.
  2. Point Review - Printed-Online Application
  3. Zoning Review - Reviewed
  4. Zoning Review - Corrections Needed
  5. Zoning Review - Reviewed
  6. Plan Review - Reviewed
  7. Zoning Review - Reviewed
  8. Final Review - Documents Required
  9. Final Review - Payment Needed
  10. Permit Issued

Contractors

  • Glenn M Williams Jr

    North Fl Mobile Home Installers Llc

    License
    IH1054858
    Title
    Mh Installer (ih)
    Role
    Contractor

    County License & State License Expired.

  • Glenn Whittington

    Whittington Electric Inc

    License
    EC13002957
    Title
    Electrical Contractor
    Role
    Subcontractor
  • Michael A Boland

    Ace A/c Of Ocala Llc

    License
    CAC1817716
    Title
    Cert Class B A/c
    Role
    Subcontractor

Inspections

  1. Sep 21, 2020

    Septic Release Inspection

    Inspected by Health Dept

  2. Sep 30, 2020

    Passed: Mobile Home - Mobile Home Set-Up Final

    Inspected by Troy Crews

  3. Sep 30, 2020

    Release to power company

    Inspected by Troy Crews

  4. Sep 30, 2020

    Passed: Engineering - Setbacks

    Inspected by Troy Crews