Permit Details

Permit Search

Permit

Mobile Home

225 SW JANUARY DR
LAKE CITY, FL 32024

Permit #
000040582
Application #
47252
Status Completed
  1. Submitted —
  2. Issued Sep 23, 2020
  3. Expires Apr 26, 2021
  4. Completed Nov 13, 2020

Property

Parcel #
03090-303
Owner
Eno Anne P & Margaret A Kluess (jtwrs)
Acres
1.02
Subdivision
Blaine Estates Phase Iii
Zoning
RR
Flood zone
X
District
3

Permit

Status
Completed
Septic release
Released
Related permit
—

Job Details

Elevation regulation
Minimum Requirement
Finished floor requirement
One foot above the road
Fema map number
12023C0380C
In floodway
N
Mobile Home is a:
Double Wide
Year Built
2021
Width (Ft.In)
32
Length (Ft.In)
76
Driveway access to home:
Culvert Permit
Installation Decal #
74291
Septic #
20-0661
Setbacks Front
25'
Setback Side 1
10'
Setbacks Rear
15'
Dev Permit #
F023-
Setback Side 2
10'
Are you applying for a 5 year temporary permit?
No
Serial #
dish10296gaab
Wind Zone?
2
Residential or Commercial Use?
Residential

Status & Review History

  1. Point Review - Received-Hard Copy Application
  2. Plan Review - Reviewed
  3. Zoning Review - Reviewed
  4. Final Review - Documents Required
  5. Final Review - Payment Needed
  6. Permit Issued

Contractors

  • Wendell Crews

    License
    IH1025316
    Title
    Mh Installer (ih)
    Role
    Contractor

    County License & State License Expired.

  • Glenn Whittington

    Whittington Electric Inc

    License
    EC13002957
    Title
    Electrical Contractor
    Role
    Subcontractor
  • Timothy D Shatto

    Shatto Heating & Air, Inc.

    License
    CAC057875
    Title
    A/c Class B
    Role
    Subcontractor

Inspections

  1. Oct 23, 2020

    Septic Release Inspection

    Inspected by Health Dept

  2. Oct 28, 2020

    Passed: Mobile Home - Mobile Home Set-Up Final

    Need Driveway Release To Complete Permit And Released Power

    Inspected by Matt Forsyth

  3. Oct 28, 2020

    Passed: Engineering - Setbacks

    14 Foot Set Back Checked

    Inspected by Matt Forsyth

  4. Nov 13, 2020

    Release to power company

    Inspected by Melissa Garber

  5. Nov 13, 2020

    Certificate-Release Certificate

    Inspected by Matt Forsyth