Inspection |
Notes |
Performed By |
Date |
Failed: Engineering - Final Driveway |
Needs To Install Culvert, Needs Culvert Permit. |
Mccormick, David |
10/15/2020 |
Cancelled: Plumbing/Gas - 1st Underground Rough–In |
|
Melissa Garber |
10/15/2020 |
Passed: Plumbing/Gas - 1st Underground Rough–In |
|
Matt Forsyth |
10/19/2020 |
Passed: Engineering - Initial Driveway |
|
Mccormick, David |
10/21/2020 |
Passed: Building - Monolithic Slab |
|
Matt Forsyth |
10/21/2020 |
Passed: Engineering - Setbacks |
|
Matt Forsyth |
10/21/2020 |
Release to power company |
Sent To Wrong Power Comp. |
Matt Forsyth |
10/26/2020 |
Passed: Electrical - Temporary Service |
|
Matt Forsyth |
10/26/2020 |
Release to power company |
|
Matt Forsyth |
10/26/2020 |
Passed: Building - Wall Sheathing |
Need Survey On Ffe |
Matt Forsyth |
11/13/2020 |
Passed: Building - Insulation |
|
Matt Forsyth |
2/2/2021 |
Passed: Electrical - 2nd Rough-In |
|
Matt Forsyth |
2/2/2021 |
Failed: Mechanical - Rough In |
Need Weatherstripping On Hvac Registers And 181 Tape Ventilation Duct In Bathrooms |
Matt Forsyth |
2/2/2021 |
Passed: Plumbing/Gas - 2nd Rough-In |
|
Matt Forsyth |
2/2/2021 |
Failed: Building - Framing |
Need To See Anchor Bolts Do Not Drywall |
Matt Forsyth |
2/2/2021 |
Passed: Building - Framing |
|
Matt Forsyth |
2/3/2021 |
Passed: Mechanical - Rough In |
|
Matt Forsyth |
2/3/2021 |
Septic Release Inspection |
|
Health Dept |
4/23/2021 |
Passed: Electrical - Permanent Power |
Need Culvert Final For Release |
Troy Crews |
6/2/2021 |
Passed: Engineering - Final Driveway |
|
Mccormick, David |
6/3/2021 |
Release to power company |
|
Melissa Garber |
6/8/2021 |
Cancelled: Plumbing/Gas - 1st Underground Rough–In |
|
Anthony Aslan |
6/8/2021 |
Cancelled: Building - Final |
|
Melissa Garber |
6/8/2021 |
Cancelled: Electrical - Permanent Power |
|
Troy Crews |
8/5/2021 |
Failed: Building - Final |
Final Termite Sticker On Electrical Panel Inside,blower Door Test Needed,overflow Pipe Not Found For Hot Water Heater Outside,ground Rod Needs To Be Driven Down To Finished Grade |
Matt Forsyth |
8/6/2021 |
Failed: Building - Final |
Items Were Not Addressed That Failed House Locked Up |
Matt Forsyth |
9/28/2021 |
Passed: Building - Final |
|
Matt Forsyth |
10/11/2021 |