Permit Details

Permit Search

Permit

Mobile Home

251 NW KATELYN WAY
LAKE CITY, FL 32055

Permit #
000040505
Application #
47139
Status Completed
  1. Submitted Sep 1, 2020
  2. Issued Sep 9, 2020
  3. Expires Sep 6, 2021
  4. Completed Mar 10, 2021

Property

Parcel #
02377-128
Owner
Deliz Colon Maranto
Acres
0.50
Subdivision
Magnolia Hills
Zoning
RSF/MH-2
Flood zone
X
District
3

Permit

Status
Completed
Septic release
Released
Related permit
—

Job Details

Elevation regulation
Engineers Elevation Letter
Finished floor requirement
24 INCHES ABOVE HIGHEST EXISTING GRADE ON ALL SIDES
Fema map number
12023C0280D
Mobile Home is a:
Double Wide
Year Built
1991
Width (Ft.In)
28
Length (Ft.In)
60
Driveway access to home:
Culvert Permit
Installation Decal #
58611
Septic #
20-0604
Setbacks Front
25'
Setback Side 1
10'
Setbacks Rear
15'
Dev Permit #
F023-
Setback Side 2
10'
Are you applying for a 5 year temporary permit?
No
Serial #
GAFLL35A/B03783HS
Wind Zone?
2
Residential or Commercial Use?
Residential

Status & Review History

  1. Application pending.
  2. Point Review - Received-Hard Copy Application
  3. Zoning Review - Reviewed
  4. Plan Review - Reviewed
  5. Final Review - Reviewed
  6. Permit Issued

Contractors

  • Manuel M Brannan

    Mikes Mobile Setup Llc

    License
    IH1025396
    Title
    Mh Installer (ih)
    Role
    Contractor

    County License & State License Expired.

Inspections

  1. Sep 8, 2020

    Passed: Mobile Home - In County Pre-Mobile Home before set-up

    Must Complete All Repairs Prior To Co

    Inspected by Troy Crews

  2. Mar 2, 2021

    Failed: Mobile Home - Mobile Home Set-Up Final

    Need To Get Ductwork Off Ground, And Compete Plumbing, Also Need Final Septic

    Inspected by Troy Crews

  3. Mar 2, 2021

    Passed: Engineering - Setbacks

    Inspected by Troy Crews

  4. Mar 9, 2021

    Septic Release Inspection

    Inspected by Health Dept

  5. Mar 10, 2021

    Passed: Mobile Home - Mobile Home Set-Up Final

    Finished Floor 24inchfrom Ground On Low End

    Inspected by Troy Crews

  6. Mar 10, 2021

    Release to power company

    Inspected by Troy Crews