Permit Details

Permit Search

Permit

Mobile Home

803 SW DAISY RD
LAKE CITY, FL 32024

Permit #
000040480
Application #
47150
Status Completed
  1. Submitted Aug 26, 2020
  2. Issued Sep 1, 2020
  3. Expires Oct 4, 2021
  4. Completed Apr 7, 2021

Property

Parcel #
00473-005
Owner
Lowrey Fred Eugene
Acres
1.00
Subdivision
—
Zoning
ESA-2
Flood zone
X
District
2

Permit

Status
Completed
Septic release
Released
Related permit
—

Job Details

Elevation regulation
Minimum Requirement
Finished floor requirement
One foot above the road
Fema map number
12023C0370C
In floodway
N
Mobile Home is a:
Single Wide
Year Built
2021
Width (Ft.In)
16
Length (Ft.In)
76
Driveway access to home:
Private Drive
Installation Decal #
61867
Septic #
20-0695
Setbacks Front
30'
Setback Side 1
25'
Setbacks Rear
25'
Dev Permit #
F023-
Setback Side 2
25'
Are you applying for a 5 year temporary permit?
No
Serial #
LOHGA12021460
Wind Zone?
2
Residential or Commercial Use?
Residential

Status & Review History

  1. Application pending.
  2. Point Review - Printed-Online Application
  3. Point Review - Reviewed
  4. Zoning Review - Reviewed
  5. Plan Review - Reviewed
  6. Final Review - Documents Required
  7. Final Review - Payment Needed
  8. Permit Issued

Contractors

  • Robert D Sheppard

    Melvins Mobile Home Service

    License
    IH1025386
    Title
    Mh Installer (ih)
    Role
    Contractor

    County License & Liability Insurance Expired.

  • Glenn Whittington

    Whittington Electric Inc

    License
    EC13002957
    Title
    Electrical Contractor
    Role
    Subcontractor
  • Ronald Bonds, Sr.

    Style Crest Inc

    License
    CAC1817658
    Title
    Class "b" A/c Contractor
    Role
    Subcontractor

    County License & State License Expired.

Inspections

  1. Sep 1, 2020

    Septic Release Inspection

    Inspected by Health Dept

  2. Mar 16, 2021

    Failed: Mobile Home - Mobile Home Set-Up Final

    Has Damaged Siding Potential For Water Intrusion

    Inspected by Matt Forsyth

  3. Mar 16, 2021

    Passed: Engineering - Setbacks

    Inspected by Matt Forsyth

  4. Apr 7, 2021

    Passed: Mobile Home - Mobile Home Set-Up Final

    Inspected by Matt Forsyth

  5. Apr 7, 2021

    Release to power company

    Inspected by Matt Forsyth

  6. Apr 7, 2021

    Passed: Engineering - Setbacks

    Inspected by Matt Forsyth