Inspection |
Notes |
Performed By |
Date |
Passed: Engineering - Initial Driveway |
|
Mccormick, David |
8/27/2020 |
Failed: Building - Footer |
Footing Has Clay In The Hole Need Engineer Letter On How To Precede |
Matt Forsyth |
9/8/2020 |
Passed: Engineering - Setbacks |
|
Matt Forsyth |
9/8/2020 |
Passed: Electrical - Temporary Service |
|
Matt Forsyth |
9/8/2020 |
Release to power company |
|
Matt Forsyth |
9/8/2020 |
Cancelled: Building - Footer |
|
Troy Crews |
9/8/2020 |
Cancelled: Engineering - Setbacks |
|
Troy Crews |
9/8/2020 |
Cancelled: Electrical - Temporary Service |
|
Troy Crews |
9/8/2020 |
Passed: Building - Footer |
|
Matt Forsyth |
9/22/2020 |
Passed: Engineering - Setbacks |
|
Matt Forsyth |
9/22/2020 |
Passed: Plumbing/Gas - 1st Underground Rough–In |
|
Matt Forsyth |
11/5/2020 |
Passed: Building - Slab |
|
Troy Crews |
12/7/2020 |
Passed: Building - Ext Strapping/Wall Sheathing |
No Strapping On Porch Post Do Not Install Siding Until Inspected |
Troy Crews |
1/29/2021 |
Passed: Building - Roof Decking |
|
Troy Crews |
1/29/2021 |
Passed: Building - Framing |
|
Troy Crews |
2/18/2021 |
Passed: Building - Strapping |
|
Troy Crews |
2/18/2021 |
Passed: Electrical - 2nd Rough-In |
|
Troy Crews |
2/18/2021 |
Passed: Mechanical - Rough In |
|
Troy Crews |
2/18/2021 |
Failed: Plumbing/Gas - 2nd Rough-In |
Need Large Nail Plates Several Areas Also No Pressure On Water Lines |
Troy Crews |
2/18/2021 |
Passed: Building - Insulation |
|
Troy Crews |
2/23/2021 |
Passed: Plumbing/Gas - 2nd Rough-In |
|
Troy Crews |
2/23/2021 |
Cancelled: Electrical - Permanent Power |
|
Matt Forsyth |
5/20/2021 |
Passed: Engineering - Final Driveway |
|
Mccormick, David |
6/2/2021 |
Passed: Electrical - Permanent Power |
Need Final Septic For Release |
Troy Crews |
6/2/2021 |
Release to power company |
|
Melissa Garber |
6/4/2021 |
Septic Release Inspection |
|
Health Dept |
6/4/2021 |
Failed: Building - Final |
Need Back Door Pad, Master Bath Needs Additional Outlet For Second Sink Or One In Middle, Need Final Termite (rec'd), Washer Outlet Must Be Gfci, Replace Missing Facia Cap East Side |
Troy Crews |
7/9/2021 |
Passed: Building - Final |
Need Final Termite Certificate Send Copy For Release Of Co |
Troy Crews |
7/27/2021 |
Certificate-Release Certificate |
Termite Final Received |
Troy Crews |
7/29/2021 |