Permit Details

Permit Search

Permit

Mobile Home

370 SW SKYLINE LOOP
FORT WHITE, FL 32038

Permit #
000040376
Application #
46927
Status Completed
  1. Submitted Aug 1, 2020
  2. Issued Aug 18, 2020
  3. Expires Apr 4, 2021
  4. Completed Oct 7, 2020

Property

Parcel #
03815-168
Owner
Baird Bobby
Acres
10.01
Subdivision
Cardinal Farms Unr
Zoning
A-3
Flood zone
X
District
4

Permit

Status
Completed
Septic release
Released
Related permit
—

Job Details

Elevation regulation
Minimum Requirement
Finished floor requirement
One foot above the road
Fema map number
12023C0480C
In floodway
N
Mobile Home is a:
Double Wide
Year Built
2020
Width (Ft.In)
32
Length (Ft.In)
52
Driveway access to home:
Culvert Permit
Installation Decal #
65746
Septic #
20-0628
Setbacks Front
30'
Setback Side 1
25'
Setbacks Rear
25'
Dev Permit #
F023-
Setback Side 2
25'
Are you applying for a 5 year temporary permit?
No
Serial #
LOHGA31971162AB
Wind Zone?
2
Residential or Commercial Use?
Residential

Status & Review History

  1. Application pending.
  2. Zoning Review - Reviewed
  3. Point Review - Printed-Online Application
  4. Plan Review - Reviewed
  5. Zoning Review - Reviewed
  6. Final Review - Documents Required
  7. Final Review - Payment Needed
  8. Permit Issued

Contractors

  • Brent M Strickland

    License
    IH1104218
    Title
    Mh Installer (ih)
    Role
    Contractor
  • Glenn Whittington

    Whittington Electric Inc

    License
    EC13002957
    Title
    Electrical Contractor
    Role
    Subcontractor
  • Michael A Boland

    Ace A/c Of Ocala, Llc

    License
    CAC1817716
    Title
    Cert Class B A/c
    Role
    Subcontractor

Inspections

  1. Oct 1, 2020

    Failed: Mobile Home - Mobile Home Set-Up Final

    Crossover Ground Missing

    Inspected by Troy Crews

  2. Oct 1, 2020

    Passed: Engineering - Setbacks

    Inspected by Troy Crews

  3. Oct 6, 2020

    Passed: Mobile Home - Mobile Home Set-Up Final

    Need Septic Released

    Inspected by Matt Forsyth

  4. Oct 6, 2020

    Passed: Engineering - Setbacks

    Inspected by Matt Forsyth

  5. Oct 7, 2020

    Release to power company

    Inspected by Melissa Garber

  6. Oct 7, 2020

    Certificate-Release Certificate

    Inspected by Matt Forsyth

  7. Oct 7, 2020

    Septic Release Inspection

    Inspected by Health Dept

  8. Oct 8, 2020

    Release to power company

    Inspected by Melissa Garber