Inspection |
Notes |
Performed By |
Date |
Passed: Engineering - Initial Driveway |
|
Mccormick, David |
8/10/2020 |
Passed: Electrical - Temporary Service |
|
Troy Crews |
8/11/2020 |
Release to power company |
|
Troy Crews |
8/11/2020 |
Passed: Building - Slab |
Service Pit |
Troy Crews |
8/20/2020 |
Passed: Building - Monolithic Slab |
Interior Column Pads |
Troy Crews |
8/25/2020 |
Passed: Engineering - Setbacks |
|
Troy Crews |
8/25/2020 |
Passed: Plumbing/Gas - 1st Underground Rough–In |
|
Troy Crews |
8/27/2020 |
Passed: Building - Monolithic Slab |
|
Troy Crews |
8/27/2020 |
Passed: Engineering - Setbacks |
|
Troy Crews |
8/27/2020 |
Rescheduled 9/2/2020:Building - Slab |
|
Troy Crews |
9/1/2020 |
Passed: Building - Slab |
North And South Side Slabs |
Troy Crews |
9/2/2020 |
Passed: Building - Framing |
|
Troy Crews |
12/2/2020 |
Passed: Electrical - 1st Underground Rough–In |
|
Troy Crews |
12/2/2020 |
Passed: Plumbing/Gas - 1st Underground Rough–In |
|
Troy Crews |
12/2/2020 |
Passed: Building - Insulation |
|
Troy Crews |
12/17/2020 |
Passed: Electrical - Permanent Power |
Need Elevation Confirmation Letter From Surveyor To Release Power. |
Troy Crews |
2/11/2021 |
Release to power company |
|
Melissa Garber |
2/17/2021 |
Cancelled: Plumbing/Gas - 2nd Rough-In |
|
Troy Crews |
4/6/2021 |
Cancelled: Electrical - Permanent Power |
|
Troy Crews |
4/6/2021 |
Passed: Building - Final |
Release Pending Fire And Zoning Final, Also Need Septic Final |
Troy Crews |
4/7/2021 |
Passed: Fire - Fire Final |
|
Tad Cervantes |
4/7/2021 |
Passed: Engineering - Zoning Final |
Need To File For Minor Site & Development Plan Approval For Additional Impervious Area (pavement) At The Rear Of Building. |
Brandon Stubbs |
4/7/2021 |
Certificate-Release Certificate |
|
Troy Crews |
4/8/2021 |