Permit Details

Permit Search

Permit

New Residential Construction

175 SW ARROW GLN
LAKE CITY, FL 32024

Permit #
000040265
Application #
46796
Status Completed
  1. Submitted —
  2. Issued Jul 31, 2020
  3. Expires Sep 26, 2021
  4. Completed Mar 30, 2021

Property

Parcel #
03114-202
Owner
Trent Giebeig Construction
Acres
1.58
Subdivision
Cannon Creek Place 1st Addition
Zoning
RR
Flood zone
X
District
3

Permit

Status
Completed
Septic release
Released
Related permit
—

Job Details

Elevation regulation
Subdivision Plat
Finished floor requirement
101' (NAVD 88 DATUM- PER PLAT)
Requirement needed
By Nailing Inspection
Document needed is
a Surveyor letter giving the Finished Floor Elevation
Document receieved
Yes
Fema map number
12023C0293D
In floodway
N
This is the construction of a
Single Family Dwelling
Setbacks Front
25'
Setback Side 1
10'
Setback Side 2
10'
Setbacks Rear
15'
Stories
1
Heated Area (Sqft)
1600
Total Area (Sqft)
2283
Building Height
16
Building Code Construction Type
V
Building Code Element
B
Building Code Occupancy Types
Residential
Occupancy Use Title
single family
Building Code Edition
Florida Building Code 2017 6th Edition & 2014 National Electrical Code
Septic# (00-0000) or (X00-000)
20-0451

Status & Review History

  1. Point Review - Received-Hard Copy Application
  2. Point Review - Reviewed
  3. Zoning Review - Reviewed
  4. Plan Review - Reviewed
  5. Zoning Review - Reviewed
  6. Permit Issued

Contractors

  • Brian T Giebeig

    Trent Giebeig Construction,inc.

    License
    CRC1330693
    Title
    Residential Contractor
    Role
    Contractor
  • Everton D Ruddock

    D&s Lighting Inc

    License
    EC13003800
    Title
    Electrical Contractor
    Role
    Subcontractor
  • Derrick L Williams

    Dl Williams Heating & Cooling Llc

    License
    CAC1816913
    Title
    Class "b" A/c Contractor
    Role
    Subcontractor
  • Kenneth R Roche

    Plumbing Now

    License
    CFC1426527
    Title
    Plumbing Contractor
    Role
    Subcontractor

Inspections

  1. Oct 19, 2020

    Passed: Building - Footer

    Inspected by Troy Crews

  2. Oct 19, 2020

    Passed: Engineering - Setbacks

    Inspected by Troy Crews

  3. Oct 26, 2020

    Passed: Plumbing/Gas - 1st Underground Rough–In

    Inspected by Matt Forsyth

  4. Oct 26, 2020

    Cancelled: Building - Footer

    Inspected by Matt Forsyth

  5. Oct 26, 2020

    Cancelled: Engineering - Setbacks

    Inspected by Matt Forsyth

  6. Oct 29, 2020

    Passed: Building - Slab

    Inspected by Troy Crews

  7. Nov 6, 2020

    Failed: Electrical - Permanent Power

    Need Elevation Letter, And Final Septic

    Inspected by Troy Crews

  8. Dec 21, 2020

    Passed: Building - Ext Strapping/Wall Sheathing

    Inspected by Troy Crews

  9. Jan 19, 2021

    Failed: Plumbing/Gas - 2nd Rough-In

    Incomplete

    Inspected by Anthony Aslan

  10. Jan 19, 2021

    Failed: Mechanical - Rough In

    Gasket On Supply And Return Boots, Exhaust Fans No Ducting.

    Inspected by Anthony Aslan

  11. Jan 19, 2021

    Failed: Building - Framing

    Front And Back Porch Bolts In Header, Windows

    Inspected by Anthony Aslan

  12. Jan 19, 2021

    Passed: Electrical - 2nd Rough-In

    Inspected by Anthony Aslan

  13. Jan 20, 2021

    Failed: Plumbing/Gas - 2nd Rough-In

    No Water In Tub.

    Inspected by Anthony Aslan

  14. Jan 22, 2021

    Passed: Plumbing/Gas - 2nd Rough-In

    Inspected by Anthony Aslan

  15. Jan 22, 2021

    Passed: Building - Framing

    Inspected by Anthony Aslan

  16. Jan 22, 2021

    Failed: Mechanical - Rough In

    Exhaust Fan Duct Needs Approved 181 Tape, Panduits Do Not Seal Duct.

    Inspected by Anthony Aslan

  17. Jan 22, 2021

    Failed: Plumbing/Gas - Tub Set/Shower Pan

    Shower Pan Not Ready

    Inspected by Anthony Aslan

  18. Jan 25, 2021

    Passed: Building - Insulation

    Inspected by Anthony Aslan

  19. Jan 25, 2021

    Passed: Mechanical - Rough In

    Inspected by Anthony Aslan

  20. Feb 11, 2021

    Passed: Building - Framing

    Inspected by Anthony Aslan

  21. Mar 8, 2021

    Passed: Electrical - Permanent Power

    Need Lock Out On Breaker For Ahu Or Disconnect In Closet. Condenser Needs Locking Caps Before Co.

    Inspected by Anthony Aslan

  22. Mar 9, 2021

    Release to power company

    Inspected by Melissa Garber

  23. Mar 9, 2021

    Septic Release Inspection

    Inspected by Health Dept

  24. Mar 23, 2021

    Failed: Building - Final

    No Blower Door Test-- Rec'd, No Back Flow Preventers On Hose Bibs

    Inspected by Anthony Aslan

  25. Mar 30, 2021

    Passed: Building - Final

    Inspected by Troy Crews

Documents