Columbia County is committed to ensuring accessibility to this website regardless of disability. If anyone encounters a feature on this website that is inaccessible due to a disability, please contact the County Manger’s Office and the Columbia County Board of County Commissioners at (386) 758-1005. You may also email that office at patrick_weaver@columbiacountyfla.com and provide a brief description of the inaccessible feature. The County will either correct the inaccessible feature or, if correction is not possible due to technical limitations, provide the desired information through alternative means.

Skip to content

Columbia County, FL | Permit Details

New Residential Construction Permit
Address 175 SW ARROW GLN
LAKE CITY, FL 32024
Parcel #: 03114-202
Acres: 1.58
Owner: Trent Giebeig Construction
Subdivision: Cannon Creek Place 1st Addition
Zoning: RR
Flood Zone: X
District: 3
Application #: 46796
Permit #: 000040265
Related Permit: Culvert Waiver: 000040266
Submitted:
Issued: Friday, July 31, 2020
Expires: Tuesday, March 30, 2021
Completed: Tuesday, March 30, 2021
Status: Completed
Septic Release? Yes
Notes:
CHECK SIDE SETBACKS IN FIELD
Job Details
This is the construction of a Single Family Dwelling
Heated Area (Sqft) 1600
Total Area (Sqft) 2283
Stories 1
Building Height 16
Building Code Construction Type V
Building Code Element B
Building Code Occupancy Types Residential
Occupancy Use Title single family
Setbacks Front 25'
Setback Side 1 10'
Setback Side 2 10'
Setbacks Rear 15'
Septic# (00-0000) or (X00-000) 20-0451
Building Code Edition Florida Building Code 2017 6th Edition & 2014 National Electrical Code
Elevation regulation Subdivision Plat
Finished floor requirement 101' (NAVD 88 DATUM- PER PLAT)
Requirement needed By Nailing Inspection
Document needed is a Surveyor letter giving the Finished Floor Elevation
Document receieved Yes
Fema map number 12023C0293D
In floodway N
Review Notes
7/17/2020 Point Review - Received-Hard Copy Application
7/17/2020 Point Review - Reviewed
7/17/2020 Zoning Review - Reviewed
7/28/2020 Plan Review - Reviewed
7/31/2020 Zoning Review - Reviewed
7/31/2020 Permit Issued Permit #000040265 created and approved.
Contractors
Name/ Business License Title Role
Brian T Giebeig
Trent Giebeig Construction,inc.
CRC1330693 Residential Contractor Contractor
Everton D Ruddock
D&s Lighting Inc
EC13003800 Electrical Contractor Subcontractor
Derrick L Williams
Dl Williams Heating & Cooling Llc
CAC1816913 Class "b" A/c Contractor Subcontractor
Kenneth R Roche
Plumbing Now
CFC1426527 Plumbing Contractor Subcontractor
Inspections
Inspection Notes Performed By Date
Passed: Building - Footer Troy Crews 10/19/2020
Passed: Engineering - Setbacks Troy Crews 10/19/2020
Passed: Plumbing/Gas - 1st Underground Rough–In Matt Forsyth 10/26/2020
Cancelled: Building - Footer Matt Forsyth 10/26/2020
Cancelled: Engineering - Setbacks Matt Forsyth 10/26/2020
Passed: Building - Slab Troy Crews 10/29/2020
Failed: Electrical - Permanent Power Need Elevation Letter, And Final Septic Troy Crews 11/6/2020
Passed: Building - Ext Strapping/Wall Sheathing Troy Crews 12/21/2020
Failed: Plumbing/Gas - 2nd Rough-In Incomplete Anthony Aslan 1/19/2021
Failed: Mechanical - Rough In Gasket On Supply And Return Boots, Exhaust Fans No Ducting. Anthony Aslan 1/19/2021
Failed: Building - Framing Front And Back Porch Bolts In Header, Windows Anthony Aslan 1/19/2021
Passed: Electrical - 2nd Rough-In Anthony Aslan 1/19/2021
Failed: Plumbing/Gas - 2nd Rough-In No Water In Tub. Anthony Aslan 1/20/2021
Passed: Plumbing/Gas - 2nd Rough-In Anthony Aslan 1/22/2021
Passed: Building - Framing Anthony Aslan 1/22/2021
Failed: Mechanical - Rough In Exhaust Fan Duct Needs Approved 181 Tape, Panduits Do Not Seal Duct. Anthony Aslan 1/22/2021
Failed: Plumbing/Gas - Tub Set/Shower Pan Shower Pan Not Ready Anthony Aslan 1/22/2021
Passed: Building - Insulation Anthony Aslan 1/25/2021
Passed: Mechanical - Rough In Anthony Aslan 1/25/2021
Passed: Building - Framing Anthony Aslan 2/11/2021
Passed: Electrical - Permanent Power Need Lock Out On Breaker For Ahu Or Disconnect In Closet. Condenser Needs Locking Caps Before Co. Anthony Aslan 3/8/2021
Release to power company Melissa Garber 3/9/2021
Septic Release Inspection Health Dept 3/9/2021
Failed: Building - Final No Blower Door Test-- Rec'd, No Back Flow Preventers On Hose Bibs Anthony Aslan 3/23/2021
Passed: Building - Final Troy Crews 3/30/2021
Documents
File Name Date File Size
Product Approval Code Specifications Form 20201119 123746.pdf 2023.12.26 344.53kB
Plans 2020-08-05 12.42.57.731.pdf 2023.12.26 10.11MB
Manual J Forms 20201119 125446.pdf 2023.12.26 2.96MB
Power Release-release To Power Company 20210309.pdf 2023.12.26 38.87kB
Owner And Contractor Signature Page 20201119 123146.pdf 2023.12.26 466.10kB
Application Information Page 20201119 123146.pdf 2023.12.26 362.45kB
Giebeig Construction Eh.pdf 2023.12.26 2.78MB
Subcontractor Form 20201119 123748.pdf 2023.12.26 365.17kB
New Well Letter 20201119 123346.pdf 2023.12.26 169.41kB
Truss Engineering 20201119 123946.pdf 2023.12.26 16.35MB
Surveyor Letter Giving The Finished Floor Elevation 20210305 033645.pdf 2023.12.26 208.52kB
Termite Treatment_initial 20201029 011946.pdf 2023.12.26 438.83kB
911 Address Form 20201119 123346.pdf 2023.12.26 202.62kB
Recorded Deed 20220301 011946.pdf 2023.12.26 450.92kB
Subdivision Plat 20201119 123247.pdf 2023.12.26 369.55kB
Certificate Of Occupancy 20210330.pdf 2023.12.26 54.46kB
Energy Code Forms 20220301 011746.pdf 2023.12.26 1.50MB
Site Survey 20201119 123546.pdf 2023.12.26 244.37kB
Property Appraiser Parcel Details Printed Page 20201119 123546.pdf 2023.12.26 661.38kB
Original Permit 20200731.pdf 2023.12.26 42.86kB
Backup Material 20201119 123246.pdf 2023.12.26 228.59kB
Blower Door Test 2021-03-29 12.40.20.92.pdf 2023.12.26 1.17MB
Giebeig Noc 2020-07-23 16.43.19.117.pdf 2023.12.26 313.41kB
Residential Or Commercial Checklist 20201119 123747.pdf 2023.12.26 1.94MB