Columbia County is committed to ensuring accessibility to this website regardless of disability. If anyone encounters a feature on this website that is inaccessible due to a disability, please contact the County Manger’s Office and the Columbia County Board of County Commissioners at (386) 758-1005. You may also email that office at patrick_weaver@columbiacountyfla.com and provide a brief description of the inaccessible feature. The County will either correct the inaccessible feature or, if correction is not possible due to technical limitations, provide the desired information through alternative means.

Skip to content

Columbia County, FL | Permit Details

New Residential Construction Permit
Address 382 SW POLARIS TER
FORT WHITE, FL 32038
Parcel #: 04203-007
Acres: 5.01
Owner: Northern Alachua Holdings Llc (c.f.d-shannon & Lee Ellen Deese)
Subdivision:
Zoning: A-3
Flood Zone: X
District: 2
Application #: 46711
Permit #: 000040223
Related Permit:
Submitted:
Issued: Monday, July 27, 2020
Expires: Thursday, September 10, 2020
Completed: Thursday, September 10, 2020
Status: Completed
Septic Release? Yes
Notes:
REPLACING EXISTING HOME, ENGINEERED MODULAR BUILDINGS
Job Details
This is the construction of a Single Family Dwelling
Heated Area (Sqft) 1380
Total Area (Sqft) 1380
Stories 1
Building Height 14
Building Code Construction Type V
Building Code Element B
Building Code Occupancy Types Residential
Occupancy Use Title single family
Setbacks Front 30
Setback Side 1 25
Setback Side 2 25
Setbacks Rear 25
Septic# 20-0121
Building Code Edition Florida Building Code 2017 6th Edition & 2014 National Electrical Code
Elevation regulation Minimum Requirement
Finished floor requirement One foot above the road
Fema map number 12023C0531C
Review Notes
7/8/2020 Point Review - Received-Hard Copy Application
7/8/2020 Zoning Review - Reviewed
7/8/2020 Plan Review - Documents Required
7/9/2020 Plan Review - Documents Required
7/16/2020 Final Review - Documents Required
7/27/2020 Permit Issued Permit #000040223 created and approved.
Contractors

This is an owner builder project.

Name/ Business License Title Role
Inspections
Inspection Notes Performed By Date
Septic Release Inspection Health Dept 7/8/2020
Failed: Electrical - Temporary Service Outlet Must Be Gfi Protected Tommy Matthews 7/28/2020
Passed: Electrical - Temporary Service Tommy Matthews 7/29/2020
Release to power company Tommy Matthews 7/29/2020
Passed: Building - Strapping Porch Beam Needs Carriage Bolts. beams Under Floor Should Be 4x6's Tommy Matthews 7/31/2020
Passed: Building - Vertical Cells/Columns Tommy Matthews 7/31/2020
Cancelled: Building - Roof Decking Melissa Garber 8/27/2020
Passed: Building - Insulation Troy Crews 8/28/2020
Passed: Building - Strapping Troy Crews 8/28/2020
Passed: Electrical - 2nd Rough-In Troy Crews 8/28/2020
Passed: Plumbing/Gas - 2nd Rough-In Troy Crews 8/28/2020
Passed: Building - Final Troy Crews 9/10/2020