| Failed: Mobile Home - Mobile Home Set-Up Final |
Meter Can Was Surrounded In Water Need Better Drainage Around Perimeter Of House |
Matt Forsyth |
9/14/2020 |
| Passed: Engineering - Setbacks |
|
Matt Forsyth |
9/14/2020 |
| Cancelled: Building - Vertical Cells/Columns |
|
Matt Forsyth |
9/14/2020 |
| Cancelled: Engineering - Setbacks |
|
Matt Forsyth |
9/14/2020 |
| Cancelled: Building - Footer |
|
Matt Forsyth |
9/14/2020 |
| Passed: Mobile Home - Mobile Home Set-Up Final |
Need Septic Release To Compete Permit |
Matt Forsyth |
9/16/2020 |
| Passed: Engineering - Setbacks |
|
Matt Forsyth |
9/16/2020 |
| Certificate-Release Certificate |
|
Matt Forsyth |
9/18/2020 |
| Septic Release Inspection |
|
Health Dept |
9/18/2020 |
| Release to power company |
Power Released To Clay!!
|
Matt Forsyth |
9/23/2020 |