Columbia County is committed to ensuring accessibility to this website regardless of disability. If anyone encounters a feature on this website that is inaccessible due to a disability, please contact the County Manger’s Office and the Columbia County Board of County Commissioners at (386) 758-1005. You may also email that office at patrick_weaver@columbiacountyfla.com and provide a brief description of the inaccessible feature. The County will either correct the inaccessible feature or, if correction is not possible due to technical limitations, provide the desired information through alternative means.

Skip to content

Columbia County, FL | Permit Details

Additions Permit

Address 249 SW BONANZA GLN
LAKE CITY, FL 32025
Parcel #: 02952-209
Acres: 0.48
Owner: Abbate Josephine
Subdivision: Southern Approaches Unit 1
Zoning: RMF-1
Flood Zone: A
District: 5
Application #: 46770
Permit #: 000040169
Related Permit:
Submitted: Wednesday, July 15, 2020
Issued: Friday, July 17, 2020
Expires: Tuesday, November 3, 2020
Completed: Tuesday, November 3, 2020
Status: Completed
Septic Release? Yes
Notes:
PERMIT 39741 ISSUED FOR THE SINGLE FAMILY DWELLING ELEVATION CONFIRMATION LETTER REC'D AT 113.21'
Job Details
Elevation regulation Subdivision Plat
Finished floor requirement 111.4
Requirement needed By Nailing Inspection
Document needed is a Surveyor letter giving the Finished Floor Elevation
Document receieved Yes
Fema map number 12023C0293D
In floodway N
Description of addition: ATTACHED Mother in-law suite
Select driveway access to property: Existing Drive
Fire sprinklers? No
Setbacks Front 20
Setback Side 1 10
Setback Side 2 10
Setback Rear 15
Stories 1
Heated Area (Sqft) 800
Total Area (Sqft) 800
Total Estimated Cost 85000
Building Height 15
Building Code Construction Type V
Building Code Element B
Building Code Occupancy Types Residential
Occupancy Use Title single family
Dev Permit # F023-
Building Code Edition Florida Building Code 2017 6th Edition & 2014 National Electrical Code
Septic# (00-0000) or (X00-000) 20-0302
Is this an addition for commercial or residential use? Residential
Review Notes
7/15/2020 Application pending.
7/15/2020 Point Review - Printed-Online Application
7/16/2020 Zoning Review - Reviewed
7/16/2020 Plan Review - Documents Required
7/17/2020 Plan Review - Reviewed
7/17/2020 Final Review - Payment Needed
7/17/2020 Permit Issued Permit #000040169 created and approved.
Contractors
Name/ Business License Title Role
Blake Lunde Ii
Blake Construction Company Of North Florida Inc
Liability Insurance Expired.
CBC1253408 Building Contractor Contractor
Aaron Hokanson
Aaron's Plumbing Corporation
Liability Insurance Expired.
CFC1426264 Plumbing Contractor Subcontractor
Blake N Lunde Ii
Blake Roofing Inc
Liability Insurance Expired.
CCC1331699 Cert. Roofing Subcontractor
Matthew H Burns
Matt Burns Electric, Inc.
EC13006531 Electrical Contractor Subcontractor
Clinton G Wilson
Wilson Heat & Air Inc
CAC057886 Class B A/c Subcontractor
Inspections
Inspection Notes Performed By Date
Passed: Plumbing/Gas - 1st Underground Rough–In Troy Crews 7/27/2020
Failed: Building - Monolithic Slab Need Termite Documents For Slab Permit #40194 Matt Forsyth 7/31/2020
Passed: Engineering - Setbacks Matt Forsyth 7/31/2020
Passed: Engineering - Setbacks Matt Forsyth 7/31/2020
Passed: Building - Monolithic Slab Termite Documents Received Matt Forsyth 7/31/2020
Failed: Building - Roof Decking Nails Missing Framing Members Need To Be Removed And Renailed Matt Forsyth 8/12/2020
Failed: Building - Wall Sheathing Nails Missing Framing Members Need To Be Removed And Renailed Matt Forsyth 8/12/2020
Passed: Building - Roof Decking Matt Forsyth 8/13/2020
Passed: Building - Wall Sheathing Matt Forsyth 8/13/2020
Passed: Building - Framing Troy Crews 8/25/2020
Passed: Electrical - 2nd Rough-In Troy Crews 8/25/2020
Passed: Mechanical - Rough In Troy Crews 8/25/2020
Passed: Plumbing/Gas - 2nd Rough-In Troy Crews 8/25/2020
Passed: Building - Insulation Troy Crews 8/25/2020
Cancelled: Electrical - Permanent Power Troy Crews 10/7/2020
Septic Release Inspection Health Dept 10/9/2020
Failed: Building - Final Need Gfci Receptacles Outside Matt Forsyth 11/2/2020
Passed: Building - Final Matt Forsyth 11/3/2020