Permit Details

Permit Search

Permit

New Residential Construction

139 SE RACHEL WAY
LAKE CITY, FL 32025

Permit #
000040078
Application #
46486
Status Completed
  1. Submitted —
  2. Issued Jul 1, 2020
  3. Expires Jan 19, 2022
  4. Completed Jul 23, 2021

Property

Parcel #
07570-041
Owner
Pfs Solutions, Inc.
Acres
0.46
Subdivision
Suzanne Unit 2
Zoning
RSF-2
Flood zone
X
District
4

Permit

Status
Completed
Septic release
Released
Related permit
—

Job Details

Elevation regulation
Minimum Requirement
Finished floor requirement
One foot above the road
Fema map number
12023C0311D
This is the construction of a
Single Family Dwelling
Setbacks Front
25
Setback Side 1
10
Setback Side 2
10
Setbacks Rear
15
Stories
1
Heated Area (Sqft)
1407
Total Area (Sqft)
1927
Building Height
16
Building Code Construction Type
V
Building Code Element
B
Building Code Occupancy Types
Residential
Occupancy Use Title
single family
Building Code Edition
Florida Building Code 2017 6th Edition & 2014 National Electrical Code
Septic# (00-0000) or (X00-000)
20-0513

Status & Review History

  1. Application pending.
  2. Point Review - Printed-Online Application
  3. Point Review - On Hold-Incomplete
  4. Point Review - Processing
  5. Zoning Review - Reviewed
  6. Plan Review - Reviewed
  7. Final Review - Documents Required
  8. Permit Issued
  9. Final Review - Payment Needed

Contractors

  • Cody Barrs

    Barrs Plumbing Inc

    License
    CFC1427145
    Title
    Plumbing Contractor
    Role
    Subcontractor
  • Roger D Whiddon

    Whiddon Construction Co. Inc

    License
    CCC1330273
    Title
    Roofing Contractor
    Role
    Subcontractor
  • Ryan C Beville

    Rbi Electrical Contracting Llc

    License
    EC13004236
    Title
    Electrical Contractor
    Role
    Subcontractor
  • Stephen M Brisbois

    Epic Ac Service

    License
    CAC1819412
    Title
    Cert. A/c Class “b”
    Role
    Subcontractor
  • Robert S Stewart

    Pfs Solutions Inc

    License
    CBC1252898
    Title
    Building Contractor
    Role
    Contractor

    County License & State License & Liability Insurance & Workers Comp & Employees Workers Comp Expired.

Inspections

  1. Jul 9, 2020

    Passed: Electrical - Temporary Service

    Inspected by Troy Crews

  2. Jul 9, 2020

    Release to power company

    Inspected by Troy Crews

  3. Aug 6, 2020

    Failed: Building - Footer

    Need To String Front Property Line To Confirm 25 Foot Set Back

    Inspected by Troy Crews

  4. Aug 6, 2020

    Failed: Engineering - Setbacks

    Need To Confirm 25 Foot Front Set Back

    Inspected by Troy Crews

  5. Aug 12, 2020

    Failed: Building - Footer

    Left Front Corner Of House Less Than 24 Foot To Property Line

    Inspected by Troy Crews

  6. Aug 12, 2020

    Failed: Engineering - Setbacks

    Inspected by Troy Crews

  7. Aug 20, 2020

    Passed: Building - Footer

    Front Property Must Be Strung Again When Block Is Erected To Confirm Front Wall 25 Ft. From Front Property Line

    Inspected by Troy Crews

  8. Aug 20, 2020

    Passed: Engineering - Setbacks

    Must Be Confirmed Again With Stem Wall

    Inspected by Troy Crews

  9. Sep 10, 2020

    Cancelled: Building - Footer

    Inspected by Troy Crews

  10. Sep 10, 2020

    Passed: Plumbing/Gas - 1st Underground Rough–In

    Inspected by Troy Crews

  11. Sep 10, 2020

    Passed: Engineering - Setbacks

    No String Across Front Property Line Needs To Be Confirmed By Builder Prior To Proceeding

    Inspected by Troy Crews

  12. Sep 17, 2020

    Passed: Building - Slab

    Inspected by Troy Crews

  13. Oct 12, 2020

    Passed: Building - Ext Strapping/Wall Sheathing

    Inspected by Troy Crews

  14. Oct 12, 2020

    Cancelled: Building - Framing

    Inspected by Troy Crews

  15. Oct 12, 2020

    Passed: Building - Roof Decking

    Inspected by Troy Crews

  16. Oct 23, 2020

    Passed: Building - Framing

    Inspected by Troy Crews

  17. Oct 23, 2020

    Passed: Electrical - 2nd Rough-In

    Inspected by Troy Crews

  18. Oct 23, 2020

    Failed: Mechanical - Rough In

    Not Complete Call Back In

    Inspected by Troy Crews

  19. Oct 23, 2020

    Passed: Plumbing/Gas - 2nd Rough-In

    Inspected by Troy Crews

  20. Oct 23, 2020

    Passed: Plumbing/Gas - Tub Set/Shower Pan

    Inspected by Troy Crews

  21. Oct 23, 2020

    Failed: Mechanical - Rough In

    Inspected by Troy Crews

  22. Nov 10, 2020

    Failed: Mechanical - Rough In

    Oven Hood Duct Not In Place, Need Figures On Overall Length Of Dryer Vent 90 Degree Bends Etc., Will Need Proof Of Duct Seal At Plenum When Unit Is Set.

    Inspected by Troy Crews

  23. Nov 30, 2020

    Passed: Mechanical - Rough In

    Crimps On Oven Duct Turn Opposite Direction In Future, Air Handler Will Need Drain Pan When Installed

    Inspected by Troy Crews

  24. Dec 9, 2020

    Passed: Building - Insulation

    Inspected by Troy Crews

  25. Mar 2, 2021

    Failed: Electrical - Permanent Power

    Need Lock On Panel If Garage Door Not Installed

    Inspected by Matt Forsyth

  26. Mar 15, 2021

    Passed: Electrical - Permanent Power

    Need Septic Release, Need Driveway Release

    Inspected by Anthony Aslan

  27. Apr 26, 2021

    Failed: Building - Final

    Need Septic Final, Driveway Final (rec'd), And Permanent Power On Building For Final C.o. Reminder Need Blower Door Test And Final Termite Also.

    Inspected by Troy Crews

  28. May 11, 2021

    Passed: Electrical - Permanent Power

    Need Septic Final For Release Of Power

    Inspected by Troy Crews

  29. May 20, 2021

    Release to power company

    Inspected by Melissa Garber

  30. May 20, 2021

    Septic Release Inspection

    Inspected by Health Dept

  31. Jun 22, 2021

    Failed: Building - Final

    Need Step At Garage Door, Need Blower Door Test, Final Termite Certificate, Light In Bathrooms blower Door Test Results Rec'd 6.25.21, Rec'd Termite Treatment 7.9.21

    Inspected by Troy Crews

  32. Jul 13, 2021

    Failed: Building - Final

    Steps Can Only Vary 3/8 Of Inch In Height

    Inspected by Troy Crews

  33. Jul 23, 2021

    Passed: Building - Final

    Step Within Tolerance

    Inspected by Anthony Aslan

Documents