Inspection |
Notes |
Performed By |
Date |
Passed: Engineering - Initial Driveway |
|
Mccormick, David |
7/2/2020 |
Passed: Electrical - Temporary Service |
|
Troy Crews |
7/9/2020 |
Release to power company |
|
Troy Crews |
7/9/2020 |
Failed: Building - Footer |
Need To String Front Property Line To Confirm 25 Foot Set Back |
Troy Crews |
8/6/2020 |
Failed: Engineering - Setbacks |
Need To Confirm 25 Foot Front Set Back |
Troy Crews |
8/6/2020 |
Failed: Building - Footer |
Left Front Corner Of House Less Than 24 Foot To Property Line |
Troy Crews |
8/12/2020 |
Failed: Engineering - Setbacks |
|
Troy Crews |
8/12/2020 |
Passed: Building - Footer |
Front Property Must Be Strung Again When Block Is Erected To Confirm Front Wall 25 Ft. From Front Property Line |
Troy Crews |
8/20/2020 |
Passed: Engineering - Setbacks |
Must Be Confirmed Again With Stem Wall |
Troy Crews |
8/20/2020 |
Cancelled: Building - Footer |
|
Troy Crews |
9/10/2020 |
Passed: Plumbing/Gas - 1st Underground Rough–In |
|
Troy Crews |
9/10/2020 |
Passed: Engineering - Setbacks |
No String Across Front Property Line Needs To Be Confirmed By Builder Prior To Proceeding |
Troy Crews |
9/10/2020 |
Passed: Building - Slab |
|
Troy Crews |
9/17/2020 |
Passed: Building - Ext Strapping/Wall Sheathing |
|
Troy Crews |
10/12/2020 |
Cancelled: Building - Framing |
|
Troy Crews |
10/12/2020 |
Passed: Building - Roof Decking |
|
Troy Crews |
10/12/2020 |
Passed: Building - Framing |
|
Troy Crews |
10/23/2020 |
Passed: Electrical - 2nd Rough-In |
|
Troy Crews |
10/23/2020 |
Failed: Mechanical - Rough In |
Not Complete Call Back In |
Troy Crews |
10/23/2020 |
Passed: Plumbing/Gas - 2nd Rough-In |
|
Troy Crews |
10/23/2020 |
Passed: Plumbing/Gas - Tub Set/Shower Pan |
|
Troy Crews |
10/23/2020 |
Failed: Mechanical - Rough In |
|
Troy Crews |
10/23/2020 |
Failed: Mechanical - Rough In |
Oven Hood Duct Not In Place, Need Figures On Overall Length Of Dryer Vent 90 Degree Bends Etc., Will Need Proof Of Duct Seal At Plenum When Unit Is Set. |
Troy Crews |
11/10/2020 |
Passed: Mechanical - Rough In |
Crimps On Oven Duct Turn Opposite Direction In Future, Air Handler Will Need Drain Pan When Installed |
Troy Crews |
11/30/2020 |
Passed: Building - Insulation |
|
Troy Crews |
12/9/2020 |
Failed: Electrical - Permanent Power |
Need Lock On Panel If Garage Door Not Installed |
Matt Forsyth |
3/2/2021 |
Passed: Electrical - Permanent Power |
Need Septic Release, Need Driveway Release |
Anthony Aslan |
3/15/2021 |
Failed: Building - Final |
Need Septic Final, Driveway Final (rec'd), And Permanent Power On Building For Final C.o. Reminder Need Blower Door Test And Final Termite Also. |
Troy Crews |
4/26/2021 |
Passed: Engineering - Final Driveway |
|
Mccormick, David |
4/30/2021 |
Passed: Electrical - Permanent Power |
Need Septic Final For Release Of Power |
Troy Crews |
5/11/2021 |
Release to power company |
|
Melissa Garber |
5/20/2021 |
Septic Release Inspection |
|
Health Dept |
5/20/2021 |
Failed: Building - Final |
Need Step At Garage Door, Need Blower Door Test, Final Termite Certificate, Light In Bathrooms
blower Door Test Results Rec'd 6.25.21, Rec'd Termite Treatment 7.9.21 |
Troy Crews |
6/22/2021 |
Failed: Building - Final |
Steps Can Only Vary 3/8 Of Inch In Height |
Troy Crews |
7/13/2021 |
Passed: Building - Final |
Step Within Tolerance |
Anthony Aslan |
7/23/2021 |