Permit Details

Permit Search

Permit

Mobile Home

4984 SW BIRLEY AVE
LAKE CITY, FL 32024

Permit #
000040060
Application #
46467
Status Completed
  1. Submitted —
  2. Issued Jul 1, 2020
  3. Expires Jan 20, 2021
  4. Completed Jul 24, 2020

Property

Parcel #
03077-011
Owner
Cameron L Chase & Jacqueline D Chase
Acres
6.63
Subdivision
—
Zoning
A-3
Flood zone
X
District
2

Permit

Status
Completed
Septic release
Released
Related permit
—

Job Details

Elevation regulation
Minimum Requirement
Finished floor requirement
One foot above the road
Fema map number
12023C0380C
In floodway
N
Mobile Home is a:
Double Wide
Year Built
2018
Width (Ft.In)
28
Length (Ft.In)
56
Driveway access to home:
Existing Drive
Installation Decal #
72500
Special temporary use permit number:
STUP2005-32
Septic #
20-0495
Setbacks Front
30
Setback Side 1
25
Setbacks Rear
25
Dev Permit #
F023-
Setback Side 2
25
Are you applying for a 5 year temporary permit?
Yes
Serial #
504012891alab
Wind Zone?
2
Residential or Commercial Use?
Residential

Status & Review History

  1. Application pending.
  2. Point Review - Printed-Online Application
  3. Plan Review - Documents Required
  4. Zoning Review - Reviewed
  5. Plan Review - On Hold-Incomplete
  6. Plan Review - Documents Required
  7. Plan Review - Documents Required
  8. Plan Review - Reviewed
  9. Final Review - Documents Required
  10. Final Review - Payment Needed
  11. Permit Issued
  12. Permit reissued to reflect updated information.
  13. Permit reissued to reflect updated information.

Contractors

  • William R Price

    Price Rite Enterprises

    License
    IH1041936
    Title
    Mh Installer (ih)
    Role
    Contractor

Inspections

  1. Jul 20, 2020

    Failed: Mobile Home - Mobile Home Set-Up Final

    Not Ready. People Still Working.

    Inspected by Tommy Matthews

  2. Jul 20, 2020

    Passed: Engineering - Setbacks

    Inspected by Tommy Matthews

  3. Jul 21, 2020

    Septic Release Inspection

    Inspected by Health Dept

  4. Jul 24, 2020

    Passed: Mobile Home - Mobile Home Set-Up Final

    Inspected by Matt Forsyth

  5. Jul 24, 2020

    Release to power company

    Inspected by Matt Forsyth

  6. Jul 24, 2020

    Passed: Engineering - Setbacks

    Inspected by Matt Forsyth