Permit Details

Permit Search

Permit

Mobile Home

486 SE HAPPY VALLEY GLN
HIGH SPRINGS, FL 32643

Permit #
000040006
Application #
46510
Status Completed
  1. Submitted —
  2. Issued Jun 23, 2020
  3. Expires Mar 2, 2021
  4. Completed Sep 3, 2020

Property

Parcel #
09986-022
Owner
Vega Pedro
Acres
1.03
Subdivision
Happy Valley
Zoning
A-3
Flood zone
0.2 PCT ANNUAL CHANCE FLOOD HAZARD
District
4

Permit

Status
Completed
Septic release
Released
Related permit
—

Job Details

Elevation regulation
Special Flood Hazard Area
Finished floor requirement
Two feet above the Dirt road
Fema map number
12023C0513C
In floodway
N
Mobile Home is a:
Double Wide
Year Built
2000
Width (Ft.In)
26
Length (Ft.In)
42
Driveway access to home:
Existing Drive
Installation Decal #
68542
Septic #
20-0454
Setbacks Front
30
Setback Side 1
25
Setbacks Rear
25
Dev Permit #
F023-
Setback Side 2
25
Are you applying for a 5 year temporary permit?
No
Serial #
flhmbfp1143-46281a/b
Wind Zone?
2
Residential or Commercial Use?
Residential

Status & Review History

  1. Point Review - Received-Hard Copy Application
  2. Point Review - Reviewed
  3. Zoning Review - Reviewed
  4. Plan Review - Reviewed
  5. Permit Issued

Contractors

  • Damarquis A Williams

    License
    IH1128217
    Title
    Mh Installer (ih)
    Role
    Contractor

    County License & State License Expired.

Inspections

  1. Jun 18, 2020

    Septic Release Inspection

    Inspected by Health Dept

  2. Jun 19, 2020

    Passed: Mobile Home - In County Pre-Mobile Home before set-up

    Inspected by Troy Crews

  3. Aug 19, 2020

    Rescheduled 9/1/2020:Mobile Home - Mobile Home Set-Up Final

    Inspected by Melissa Garber

  4. Aug 19, 2020

    Rescheduled 9/1/2020:Engineering - Setbacks

    Inspected by Melissa Garber

  5. Sep 1, 2020

    Rescheduled 9/3/2020:Mobile Home - Mobile Home Set-Up Final

    Inspected by Troy Crews

  6. Sep 1, 2020

    Rescheduled 9/3/2020:Engineering - Setbacks

    Inspected by Troy Crews

  7. Sep 3, 2020

    Passed: Mobile Home - Mobile Home Set-Up Final

    Inspected by Troy Crews

  8. Sep 3, 2020

    Release to power company

    Inspected by Troy Crews

  9. Sep 3, 2020

    Passed: Engineering - Setbacks

    Inspected by Troy Crews

  10. Sep 14, 2020

    Release to power company

    Inspected by Melissa Garber