Inspection |
Notes |
Performed By |
Date |
Failed: Building - Footer |
Footer Not Complete. |
Tommy Matthews |
7/23/2020 |
Failed: Engineering - Setbacks |
Setbacks Need To Be Confirmed Prior To Inspection Approval. Need Survey. |
Tommy Matthews |
7/23/2020 |
Failed: Building - Footer |
Can Not Verify Setbacks. Need String Line Along Property Line. Engineers Drawing Call For 18" Of Sandy Fill Prior To Rebar. Need Porto Potti On Job Before Approval. |
Tommy Matthews |
7/24/2020 |
Failed: Engineering - Setbacks |
|
Tommy Matthews |
7/24/2020 |
Passed: Building - Footer |
Setbacks Must Be Confirmed By Builder Property Lines Not Strung Can't Confirm In Field. |
Troy Crews |
7/27/2020 |
Passed: Engineering - Setbacks |
Must Be Confirmed By Surveyor Prior To Pour. |
Troy Crews |
7/27/2020 |
Passed: Plumbing/Gas - 1st Underground Rough–In |
|
Troy Crews |
9/10/2020 |
Passed: Building - Slab |
|
Troy Crews |
9/29/2020 |
Passed: Building - Ext Strapping/Wall Sheathing |
|
Troy Crews |
11/4/2020 |
Passed: Building - Framing |
|
Troy Crews |
11/4/2020 |
Passed: Building - Strapping |
|
Troy Crews |
11/4/2020 |
Passed: Building - Wall Sheathing |
|
Troy Crews |
11/4/2020 |
Passed: Electrical - 2nd Rough-In |
|
Troy Crews |
11/4/2020 |
Failed: Mechanical - Rough In |
Not Complete Call Back In Prior To Insulation |
Troy Crews |
11/4/2020 |
Failed: Plumbing/Gas - 2nd Rough-In |
Not Started Call Back In Prior To Insulation |
Troy Crews |
11/4/2020 |
Passed: Building - Insulation |
Do Not Sheetrock |
Troy Crews |
11/30/2020 |
Failed: Mechanical - Rough In |
Check All Duct For Strapping Several Have No Straps, Dryer Duct Not Complete Truss In The Way. |
Troy Crews |
12/1/2020 |
Failed: Plumbing/Gas - 2nd Rough-In |
Tub Drain Leaking |
Troy Crews |
12/1/2020 |
Passed: Building - Insulation |
Do Not Sheetrock |
Troy Crews |
12/15/2020 |
Cancelled: Electrical - 2nd Rough-In |
|
Troy Crews |
12/15/2020 |
Passed: Mechanical - Rough In |
|
Troy Crews |
12/15/2020 |
Failed: Plumbing/Gas - 2nd Rough-In |
Tub Drain Still Leaking At The Slab Do Not Sheetrock Until Re Inspected |
Troy Crews |
12/16/2020 |
Passed: Plumbing/Gas - 2nd Rough-In |
Leak Repaired |
Troy Crews |
1/6/2021 |
Passed: Plumbing/Gas - Tub Set/Shower Pan |
|
Troy Crews |
1/6/2021 |
Passed: Electrical - Permanent Power |
|
Troy Crews |
6/3/2021 |
Release to power company |
|
Troy Crews |
6/3/2021 |
Cancelled: Building - Footer |
|
Troy Crews |
7/9/2021 |
Cancelled: Engineering - Setbacks |
|
Troy Crews |
7/9/2021 |
Failed: Building - Final |
Need Water Heater Installed |
Troy Crews |
7/12/2021 |
Passed: Building - Final |
Water Heater Installed |
Troy Crews |
7/13/2021 |