Storage Building
Permit
| Application #: | 46034 |
| Permit #: |
000039926 |
| Related Permit: |
|
| Submitted: | |
| Issued: | Thursday, June 11, 2020 |
| Expires: | Thursday, March 18, 2021 |
| Completed: | Thursday, March 18, 2021 |
| Status: |
Completed |
| Septic Release? |
Yes |
Job Details
| Elevation regulation |
Minimum Requirement |
| Finished floor requirement |
NONE Non-Habitable Structure |
| Fema map number |
12023C0290D |
| Type of Structure |
Garage |
| Commercial or Residential? |
Residential |
| Total Area (Sqft) |
1040 |
| Building Code Construction Type |
V |
| Building Code Element |
B |
| Building Code Occupancy Types |
Storage |
| Occupancy Use Title |
garage |
| Setbacks Front |
30 |
| Setback Side 1 |
25 |
| Setback Side 2 |
25 |
| Setback Rear |
10 ACCESSORY STRUCTURE |
| Septic# (00-0000) or (X00-000) |
20-0425 |
| Dev Permit # |
F023- |
| Building Code Edition |
Florida Building Code 2017 6th Edition & 2014 National Electrical Code |
Review Notes
| 4/20/2020 |
Application pending. |
| 4/21/2020 |
Application Converted |
| 4/21/2020 |
Point Review - On Hold |
| 5/4/2020 |
Point Review - Documents Required |
| 5/7/2020 |
Point Review - Corrections Needed |
| 5/15/2020 |
Point Review - Corrections Needed |
| 6/2/2020 |
Point Review - On Hold-Incomplete |
| 6/3/2020 |
Zoning Review - Reviewed |
| 6/3/2020 |
Point Review - Received |
| 6/3/2020 |
Plan Review - Reviewed |
| 6/4/2020 |
Final Review - Documents Required |
| 6/11/2020 |
Permit Issued |
Contractors
| Name / Business |
License |
Title |
Role |
Inspections
| Inspection |
Notes |
Performed By |
Date |
| Septic Release Inspection |
|
Health Dept |
6/9/2020 |
| Passed: Building - Ext Strapping/Wall Sheathing |
|
Matt Forsyth |
6/19/2020 |
| Failed: Building - Framing |
Need Letter On Beam Change |
Matt Forsyth |
6/19/2020 |
| Failed: Building - Lintel/Tie Beam |
Need. Letter On Changes |
Matt Forsyth |
6/19/2020 |
| Passed: Building - Roof Decking |
|
Matt Forsyth |
6/19/2020 |
| Passed: Building - Wall Sheathing |
|
Matt Forsyth |
6/19/2020 |
| Cancelled: Electrical - 1st Underground Rough–In |
|
Matt Forsyth |
6/19/2020 |
| Passed: Electrical - 2nd Rough-In |
|
Matt Forsyth |
6/19/2020 |
| Passed: Building - Lintel/Tie Beam |
Letter Received |
Matt Forsyth |
8/6/2020 |
| Passed: Building - Framing |
Letter Received |
Matt Forsyth |
8/6/2020 |
| Passed: Building - Final |
|
Matt Forsyth |
3/18/2021 |