Search pages and services on the county website.
Choose the colors you prefer.
Permit
3845 S US HIGHWAY 441LAKE CITY, FL 32025
Kevin L Bedenbaugh Jr
Plumb Level Construction Co Llc
Ryan Felknor
Felknor Electric, Inc.
Mark A Ganskop
Express Plumbing Inc
Passed: Building - Footer
Inspected by Troy Crews
Passed: Engineering - Setbacks
Passed: Plumbing/Gas - 1st Underground Rough–In
Passed: Electrical - 1st Underground Rough–In
Passed: Building - Monolithic Slab
Passed: Plumbing/Gas - 2nd Rough-In
Passed: Electrical - Permanent Power
Need Septic Release, And Elevation Confirmation. Reminder Need D.o.t. Final Prior To C.o. And Permanent Step On Floor To Reach Electric Main Handle.
Need Septic Final Also Need D.o.t. Driveway Release
Release to power company
D.o.t. Received
Septic Release Inspection
Inspected by Health Dept
Failed: Building - Final
Need Platform In Front Of Main Electric Panel So Distance Is No More Than 6 Ft. 7 Inches To Center Of Main Breaker, Need Gfci Outlets Within 6 Ft. Of Sink In Breakroom Area
Fire - Fire Final
Awaiting inspection
Building - Final