Columbia County is committed to ensuring accessibility to this website regardless of disability. If anyone encounters a feature on this website that is inaccessible due to a disability, please contact the County Manger’s Office and the Columbia County Board of County Commissioners at (386) 758-1005. You may also email that office at patrick_weaver@columbiacountyfla.com and provide a brief description of the inaccessible feature. The County will either correct the inaccessible feature or, if correction is not possible due to technical limitations, provide the desired information through alternative means.

Skip to content

Columbia County, FL | Permit Details

Mobile Home Permit
Address 310 SW AMELIA CT
FORT WHITE, FL 32038
Parcel #: 03751-206
Acres: 5.03
Owner: Anuez Luis
Subdivision: South Wind
Zoning: A-3
Flood Zone: X
District: 2
Application #: 46257
Permit #: 000039911
Related Permit:
Submitted:
Issued: Tuesday, June 9, 2020
Expires: Thursday, May 20, 2021
Completed: Thursday, May 20, 2021
Status: Completed
Septic Release? Yes
Notes:

Job Details
Mobile Home is a: Single Wide
Year Built 1997
Width (Ft.In) 14
Length (Ft.In) 48
Wind Zone? 2
Serial # FLHML2B1308-17525
Installation Decal # 49872
Residential or Commercial Use? Residential
Driveway access to home: Existing Drive
Are you applying for a 5 year temporary permit? No
Septic # (00-0000) or (X00-000) 20-0427
Dev Permit # F023-
Setbacks Front 30
Setback Side 1 25
Setback Side 2 25
Setbacks Rear 25
Elevation regulation Minimum Requirement
Finished floor requirement One foot above the road
Fema map number 12023C0390C
Review Notes
5/17/2020 Application pending.
6/2/2020 Plan Review - Reviewed
6/2/2020 Zoning Review - Reviewed
6/2/2020 Final Review - Documents Required
6/9/2020 Permit Issued Permit #000039911 created and approved.
Contractors
Name/ Business License Title Role
Robert D Sheppard
Melvins Mobile Home Service
IH1025386 Mh Installer (ih) Contractor
Inspections
Inspection Notes Performed By Date
Passed: Mobile Home - In County Pre-Mobile Home before set-up Matt Forsyth 6/3/2020
Septic Release Inspection Health Dept 5/18/2021
Failed: Mobile Home - Mobile Home Set-Up Final Need Install Decal Matt Forsyth 5/19/2021
Passed: Engineering - Setbacks Matt Forsyth 5/19/2021
Passed: Mobile Home - Mobile Home Set-Up Final Decal Installed Matt Forsyth 5/20/2021
Release to power company Matt Forsyth 5/20/2021
Passed: Engineering - Setbacks Matt Forsyth 5/20/2021