Permit Details

Permit Search

Permit

New Residential Construction

132 SW FREEDOM CT
FORT WHITE, FL 32038

Permit #
000039818
Application #
46026
Status Completed
  1. Submitted —
  2. Issued May 26, 2020
  3. Expires Aug 7, 2021
  4. Completed Feb 8, 2021

Property

Parcel #
03865-009
Owner
Waters David & Mena
Acres
5.02
Subdivision
Ichetucknee Meadows
Zoning
A-3
Flood zone
X
District
2

Permit

Status
Completed
Septic release
Released
Related permit
—

Job Details

Elevation regulation
Minimum Requirement
Finished floor requirement
One foot above the road
Fema map number
12023C0459C
This is the construction of a
Single Family Dwelling
Stories
1
Heated Area (Sqft)
1250
Total Area (Sqft)
1878
Building Height
19
Septic# (00-0000) or (X00-000)
20-0378
Setbacks Front
30
Setback Side 1
25
Setback Side 2
25
Setbacks Rear
25
Building Code Construction Type
V
Building Code Element
B
Building Code Occupancy Types
Residential
Occupancy Use Title
SINGLE FAMILY
Building Code Edition
Florida Building Code 2017 6th Edition & 2014 National Electrical Code

Status & Review History

  1. Application pending.
  2. Point Review - On Hold
  3. Point Review - Documents Required
  4. Point Review - Documents Required
  5. Point Review - Received
  6. Plan Review - Reviewed
  7. Zoning Review - Reviewed
  8. Permit Issued

Contractors

  • William S Crawford

    Stanley Crawford Construction, Inc.

    License
    RG0042896
    Title
    General Contractor
    Role
    Contractor

    County License & State License & Liability Insurance & Workers Comp & Employees Workers Comp Expired.

  • Kenneth Ault

    Kenneth Edward Ault Plumbing Inc

    License
    CFC1429807
    Title
    Cert. Plumbing
    Role
    Subcontractor

    County License & State License & Liability Insurance & Workers Comp & Employees Workers Comp Expired.

  • Ralph W Laverdure

    Rwl Roofing,llc.

    License
    CCC1328590
    Title
    Roofing Contractor
    Role
    Subcontractor

    County License & State License & Liability Insurance & Workers Comp Expired.

  • Ryan C Beville

    Rbi Electrical Contracting Llc

    License
    EC13004236
    Title
    Electrical Contractor
    Role
    Subcontractor

Inspections

  1. Jun 5, 2020

    Passed: Building - Footer

    Inspected by Matt Forsyth

  2. Jun 5, 2020

    Passed: Engineering - Setbacks

    Inspected by Matt Forsyth

  3. Jun 15, 2020

    Cancelled: Building - Slab

    Inspected by Melissa Garber

  4. Jun 15, 2020

    Cancelled: Plumbing/Gas - 1st Underground Rough–In

    Inspected by Melissa Garber

  5. Jun 19, 2020

    Failed: Plumbing/Gas - 1st Underground Rough–In

    No Water In 5' Stack.

    Inspected by Tommy Matthews

  6. Jun 23, 2020

    Passed: Plumbing/Gas - 1st Underground Rough–In

    Inspected by Matt Forsyth

  7. Jun 23, 2020

    Failed: Building - Slab

    Missing Interior Footing

    Inspected by Matt Forsyth

  8. Jun 24, 2020

    Passed: Building - Slab

    Inspected by Matt Forsyth

  9. Jul 15, 2020

    Release to power company

    Inspected by Melissa Garber

  10. Jul 15, 2020

    Passed: Electrical - Temporary Service

    Inspected by Matt Forsyth

  11. Jul 31, 2020

    Passed: Building - Roof Decking

    Inspected by Matt Forsyth

  12. Jul 31, 2020

    Passed: Building - Wall Sheathing

    Inspected by Matt Forsyth

  13. Aug 28, 2020

    Failed: Building - Framing

    Beams And Headers Not Nailed Properly Need Fire Caulking In Top Plate. Posts Were Covered In Lap Siding Could Not Inspect Strapping Also Stud To Plate Connector 48"oc Missing

    Inspected by Matt Forsyth

  14. Aug 28, 2020

    Passed: Mechanical - Rough In

    Inspected by Matt Forsyth

  15. Aug 28, 2020

    Passed: Electrical - 2nd Rough-In

    Inspected by Matt Forsyth

  16. Sep 1, 2020

    Passed: Building - Framing

    Items Corrected Siding Taken Off Of Post Straps, Windstorm Osb To Take Place Of Sp Straps

    Inspected by Troy Crews

  17. Sep 1, 2020

    Failed: Plumbing/Gas - 2nd Rough-In

    Need Pressure On Water Lines Also Need To Install Nail Plates On 2 Inch Vent Through Roof Call Back In With Insulation

    Inspected by Troy Crews

  18. Sep 8, 2020

    Passed: Plumbing/Gas - 2nd Rough-In

    Inspected by Matt Forsyth

  19. Sep 10, 2020

    Passed: Building - Insulation

    Inspected by Matt Forsyth

  20. Nov 9, 2020

    Septic Release Inspection

    Inspected by Health Dept

  21. Nov 9, 2020

    Passed: Electrical - Permanent Power

    Inspected by Matt Forsyth

  22. Nov 9, 2020

    Release to power company

    Inspected by Matt Forsyth

  23. Dec 18, 2020

    Failed: Building - Final

    Flexible Foil Duct Cant Be Concealed In Wall Or Attic, Install Metal Duct And Have Inspected Prior To Installing Concealment Trim

    Inspected by Troy Crews

  24. Jan 14, 2021

    Failed: Building - Final

    Need Blower Door And Final Termite Treatment

    Inspected by Matt Forsyth

  25. Feb 8, 2021

    Building-Final

    Termite And Blower Door Test Received

    Inspected by Matt Forsyth

  26. Feb 8, 2021

    Passed: Building - Final

    Inspected by Matt Forsyth