Columbia County is committed to ensuring accessibility to this website regardless of disability. If anyone encounters a feature on this website that is inaccessible due to a disability, please contact the County Manger’s Office and the Columbia County Board of County Commissioners at (386) 758-1005. You may also email that office at patrick_weaver@columbiacountyfla.com and provide a brief description of the inaccessible feature. The County will either correct the inaccessible feature or, if correction is not possible due to technical limitations, provide the desired information through alternative means.

Skip to content

Columbia County, FL | Permit Details

New Residential Construction Permit
Address 586 NW HIGH POINT DR
LAKE CITY, FL 32055
Parcel #: 02202-110
Acres: 3.71
Owner: Brown Road Builders Inc
Subdivision: High Pointe
Zoning: PRD
Flood Zone: X AND A
District: 3
Application #: 44840
Permit #: 000039757
Related Permit: Culvert Waiver: 000039756
Submitted:
Issued: Monday, May 11, 2020
Expires: Tuesday, November 10, 2020
Completed: Tuesday, November 10, 2020
Status: Completed
Septic Release? Yes
Notes:
BUILDER TO HAVE SURVEYOR CONFIRM SETBACKS SITE PLAN CONFIRMS BUFFER SETBACKS ARE MEET AND HOME IS BEING PLACED OUTSIDE OF THE FLOOD ZONE
Job Details
This is the construction of a Single Family Dwelling
Heated Area (Sqft) 2110
Total Area (Sqft) 3022
Stories 1
Building Height 22
Building Code Construction Type V
Building Code Element B
Building Code Occupancy Types Residential
Occupancy Use Title single family
Setbacks Front 30
Setback Side 1 25
Setback Side 2 25
Setbacks Rear 25
Septic# (00-0000) or (X00-000) 20-0247-n
Building Code Edition Florida Building Code 2017 6th Edition & 2014 National Electrical Code
Elevation regulation Minimum Requirement
Finished floor requirement One foot above the road
Fema map number 12023C0280D
In floodway N
Review Notes
3/27/2020 Point Review - Received
5/11/2020 Permit Issued Permit #000039757 created and approved.
Contractors
Name/ Business License Title Role
Isaiah Cully
Ic Construction Llc
CBC1259655 Building Contractor Contractor
Everton D Ruddock
D&s Lighting Inc
EC13003800 Electrical Contractor Subcontractor
Clinton G Wilson
Wilson Heat & Air Inc
CAC057886 Class B A/c Subcontractor
Cody Barrs
Barrs Plumbing,inc.
CFC1427145 Plumbing Contractor Subcontractor
Tyler M Turner
Tmt Roofing Llc
CCC1330410 Cert Roofing Subcontractor
Inspections
Inspection Notes Performed By Date
Passed: Building - Footer Troy Crews 5/14/2020
Passed: Engineering - Setbacks Troy Crews 5/14/2020
Passed: Electrical - 1st Underground Rough–In Troy Crews 5/28/2020
Passed: Plumbing/Gas - 1st Underground Rough–In Troy Crews 5/28/2020
Passed: Electrical - Temporary Service Troy Crews 6/1/2020
Release to power company Troy Crews 6/1/2020
Passed: Building - Slab Troy Crews 6/2/2020
Passed: Building - Ext Strapping/Wall Sheathing Wall Sheeting Only Matt Forsyth 7/21/2020
Passed: Building - Roof Decking Matt Forsyth 7/21/2020
Passed: Building - Strapping Matt Forsyth 7/22/2020
Failed: Building - Framing Check Back Over Truss Engineering, Need Repair For Truss Cut For Front Gable Window, Anchor Bolts Not Complete Including Plate Splices, Check Strapping On All Trusses Over 500 Pound Uplift, Garage Header Not Strapped And Tied At Bottom Per Plan, Girder Truss All Thread Not Installed. Troy Crews 7/29/2020
Passed: Electrical - Temporary Service Matt Forsyth 7/31/2020
Release to power company Matt Forsyth 7/31/2020
Failed: Building - Framing Check All Uplift Over 500 For More Clips, Gable Truss North End Needs Bracing, T-06 Truss Broken Need Repair Paperwork And Repair Done, Still Need Repairs For Trusses Cut For False Gable Windows. Do Not Insulate Needs Final Framing Inspection. Troy Crews 8/12/2020
Passed: Electrical - 2nd Rough-In Troy Crews 8/12/2020
Passed: Plumbing/Gas - 2nd Rough-In Troy Crews 8/12/2020
Failed: Mechanical - Rough In Oven Duct. Not Complete, Do Not Insulate House Troy Crews 8/12/2020
Passed: Mechanical - Rough In Troy Crews 8/28/2020
Failed: Building - Framing Same Framing Issues Remain Troy Crews 8/28/2020
Passed: Building - Framing Items Corrected Troy Crews 9/4/2020
Passed: Building - Insulation Troy Crews 9/4/2020
Septic Release Inspection Health Dept 10/14/2020
Rescheduled 10/30/2020:Electrical - Permanent Power Troy Crews 10/29/2020
Failed: Electrical - Permanent Power Meter Can Needs Temp Wires Removed From Main Lugs Matt Forsyth 10/30/2020
Passed: Electrical - Permanent Power Meter Can Adjusted Matt Forsyth 11/2/2020
Release to power company Matt Forsyth 11/2/2020
Failed: Building - Final Need Setback Letter Confirmation- Rec'd Matt Forsyth 11/9/2020
Passed: Building - Final Matt Forsyth 11/10/2020
Documents
File Name Date File Size
Owner And Contractor Signature Page 20200511 160615.pdf 2023.12.26 1.11MB
Site Plan 20201109 175254.pdf 2023.12.26 4.19MB
Truss Engineering 20200512 043122.pdf 2023.12.26 461.11kB
Certificate Of Occupancy 20201110.pdf 2023.12.26 49.72kB
Truss Repair 39757 2020-08-13 14.22.23.46.pdf 2023.12.26 439.50kB
Energy Code Forms 20200512 043155.pdf 2023.12.26 2.91MB
Win_20201109_10_26_22_pro 2020-11-09 10.26.40.392.jpg 2023.12.26 135.82kB
Application Information Page 20200512 040011.pdf 2023.12.26 3.69MB
Recorded Notice Of Commencement 20200511 045846.pdf 2023.12.26 293.87kB
Power Release-electrical-permanent Power 20201102.pdf 2023.12.26 39.06kB
Elevation Certificate - Not Required 2020-11-10 11.54.32.852.pdf 2023.12.26 1.77MB
Original Permit 20200511.pdf 2023.12.26 42.76kB
Truss Revisions 39757 2020-07-31 07.41.17.626.pdf 2023.12.26 719.61kB
Application Information Page 20200512 043123.pdf 2023.12.26 3.77MB
Residential Or Commercial Checklist 20200512 043120.pdf 2023.12.26 699.46kB
Power Release-electrical-temporary Service 20200601.pdf 2023.12.26 38.81kB
Win_20200904_14_40_18_pro 2020-09-04 14.41.51.857.jpg 2023.12.26 180.93kB
Truss Engineering 20200512 043148.pdf 2023.12.26 16.46MB
Power Release-electrical-temporary Service 20200731.pdf 2023.12.26 38.93kB
Plans 2020-05-26 12.14.15.353.pdf 2023.12.26 6.90MB
Manual J Forms 20200512 043128.pdf 2023.12.26 2.04MB
Win_20200602_11_03_16_scan 2020-06-02 11.05.01.602.jpg 2023.12.26 247.86kB
As Built Sealed Location Survey 39757 2020-11-10 11.51.00.297.pdf 2023.12.26 35.43MB
Win_20201109_10_22_36_pro 2020-11-09 10.23.33.962.jpg 2023.12.26 192.11kB
Application Information Page 20200512 043142.pdf 2023.12.26 6.22MB