Permit Details

Permit Search

Permit

Mobile Home

1313 SW CENTRAL TERR
FORT WHITE, FL 32038

Permit #
000039727
Application #
45928
Status Completed
  1. Submitted —
  2. Issued May 5, 2020
  3. Expires Dec 1, 2020
  4. Completed Jun 4, 2020

Property

Parcel #
01211-000
Owner
Jeffrey Shook And Vita Shook, Drew Shook
Acres
0.92
Subdivision
Three Rivers Estates Unit 19
Zoning
A-3
Flood zone
0.2 PCT ANNUAL CHANCE FLOOD HAZARD
District
2

Permit

Status
Completed
Septic release
Released
Related permit
—

Job Details

Elevation regulation
Special Flood Hazard Area
Finished floor requirement
0.2 PCT ANNUAL CHANCE FLOOD HAZARD One foot above the road
Document needed is
NA
Fema map number
12023C0467C
In floodway
N
Mobile Home is a:
Double Wide
Year Built
2020
Width (Ft.In)
32
Length (Ft.In)
52
Driveway access to home:
Culvert Waiver
Installation Decal #
65710
Septic #
20-0310
Are you applying for a 5 year temporary permit?
No
Serial #
LOHGA32071581AB
Wind Zone?
2
Residential or Commercial Use?
Residential
Setbacks Front
30
Setback Side 1
10
Setbacks Rear
25
Dev Permit #
F023-
Setback Side 2
10

Status & Review History

  1. Application pending.
  2. Point Review - Completed/Sent for Plan Review
  3. Plan Review - Completed/Sent for Zoning Review
  4. Zoning Review - Completed/Sent for Final Review
  5. Final Review - Completed/Sent for Final Review
  6. Final Review - Complete
  7. Final Review - Payment Needed
  8. Permit Issued

Contractors

  • Brent M Strickland

    License
    IH1104218
    Title
    Mh Installer (ih)
    Role
    Contractor
  • Glenn Whittington

    Whittington Electric Inc

    License
    EC13002957
    Title
    Electrical Contractor
    Role
    Subcontractor
  • Michael A Boland

    Ace A/c Of Ocala, Llc

    License
    CAC1817716
    Title
    Cert Class B A/c
    Role
    Subcontractor

Inspections

  1. May 29, 2020

    Failed: Mobile Home - Mobile Home Set-Up Final

    Need Installation Decal Posted As Required By State. Need Final Approval On Septic System.

    Inspected by Tommy Matthews

  2. May 29, 2020

    Passed: Engineering - Setbacks

    Inspected by Tommy Matthews

  3. Jun 1, 2020

    Septic Release Inspection

    Inspected by Health Dept

  4. Jun 4, 2020

    Passed: Mobile Home - Mobile Home Set-Up Final

    Inspected by Tommy Matthews

  5. Jun 4, 2020

    Release to power company

    Inspected by Tommy Matthews

  6. Jun 4, 2020

    Passed: Engineering - Setbacks

    Inspected by Tommy Matthews