Mobile Home
Permit
| Application #: | 45928 |
| Permit #: |
000039727 |
| Related Permit: |
|
| Submitted: | |
| Issued: | Tuesday, May 5, 2020 |
| Expires: | Thursday, June 4, 2020 |
| Completed: | Thursday, June 4, 2020 |
| Status: |
Completed |
| Septic Release? |
Yes |
Job Details
| Elevation regulation |
Special Flood Hazard Area |
| Finished floor requirement |
0.2 PCT ANNUAL CHANCE FLOOD HAZARD One foot above the road |
| Document needed is |
NA |
| Fema map number |
12023C0467C |
| In floodway |
N |
| Mobile Home is a: |
Double Wide |
| Year Built |
2020 |
| Width (Ft.In) |
32 |
| Length (Ft.In) |
52 |
| Driveway access to home: |
Culvert Waiver |
| Installation Decal # |
65710 |
| Septic # |
20-0310 |
| Are you applying for a 5 year temporary permit? |
No |
| Serial # |
LOHGA32071581AB |
| Wind Zone? |
2 |
| Residential or Commercial Use? |
Residential |
| Setbacks Front |
30 |
| Setback Side 1 |
10 |
| Setbacks Rear |
25 |
| Dev Permit # |
F023- |
| Setback Side 2 |
10 |
Review Notes
| 4/7/2020 |
Application pending. |
| 4/8/2020 |
Point Review - Completed/Sent for Plan Review |
| 4/17/2020 |
Plan Review - Completed/Sent for Zoning Review |
| 4/17/2020 |
Zoning Review - Completed/Sent for Final Review |
| 5/4/2020 |
Final Review - Completed/Sent for Final Review |
| 5/5/2020 |
Final Review - Complete |
| 5/5/2020 |
Final Review - Payment Needed |
| 5/5/2020 |
Permit Issued |
Contractors
| Name / Business |
License |
Title |
Role |
Brent M Strickland
|
IH1104218 |
Mh Installer (ih) |
Contractor |
Glenn Whittington Whittington Electric Inc
|
EC13002957 |
Electrical Contractor |
Subcontractor |
Michael A Boland Ace A/c Of Ocala, Llc
|
CAC1817716 |
Cert Class B A/c |
Subcontractor |
Inspections
| Inspection |
Notes |
Performed By |
Date |
| Failed: Mobile Home - Mobile Home Set-Up Final |
Need Installation Decal Posted As Required By State. Need Final Approval On Septic System. |
Tommy Matthews |
5/29/2020 |
| Passed: Engineering - Setbacks |
|
Tommy Matthews |
5/29/2020 |
| Septic Release Inspection |
|
Health Dept |
6/1/2020 |
| Passed: Mobile Home - Mobile Home Set-Up Final |
|
Tommy Matthews |
6/4/2020 |
| Release to power company |
|
Tommy Matthews |
6/4/2020 |
| Passed: Engineering - Setbacks |
|
Tommy Matthews |
6/4/2020 |