Permit Details

Permit Search

Permit

Mobile Home

742 SW NORRIS AVE
LAKE CITY, FL 32024

Permit #
000039710
Application #
45963
Status Completed
  1. Submitted —
  2. Issued May 1, 2020
  3. Expires Nov 30, 2020
  4. Completed Jun 3, 2020

Property

Parcel #
03471-027
Owner
Houston Matthew & Kimberly
Acres
5.88
Subdivision
Emma Norris Tract Unr
Zoning
A-3
Flood zone
X
District
2

Permit

Status
Completed
Septic release
Released
Related permit
—

Job Details

Elevation regulation
Minimum Requirement
Finished floor requirement
One foot above the road
Fema map number
12023C0360C
In floodway
N
Mobile Home is a:
Double Wide
Year Built
1995
Width (Ft.In)
28
Length (Ft.In)
70
Driveway access to home:
Existing Drive
Installation Decal #
28838
Special temporary use permit number:
N/A
Septic #
20-0215
Are you applying for a 5 year temporary permit?
No
Serial #
H116016GLXR
Wind Zone?
2
Residential or Commercial Use?
Residential
Setbacks Front
30
Setback Side 1
25
Setbacks Rear
25
Dev Permit #
F023-
Setback Side 2
25

Status & Review History

  1. Application pending.
  2. Plan Review - Completed/Sent for Zoning Review
  3. Plan Review - Completed/Sent for Zoning Review
  4. Zoning Review - Completed/Sent for Final Review
  5. Final Review - Completed/Sent for Final Review
  6. Permit Issued

Contractors

  • Dale Houston

    Dale Houstons Mobile Home Set Up And Service

    License
    IH1025142
    Title
    Mh Installer (ih)
    Role
    Contractor

Inspections

  1. Apr 21, 2020

    Passed: Mobile Home - In County Pre-Mobile Home before set-up

    Inspected by Matt Forsyth

  2. May 27, 2020

    Failed: Mobile Home - Mobile Home Set-Up Final

    Need Dead Covers Installed On Electrical Panels Inside And Out. Need Proof Of Being Able To Heat Structure.

    Inspected by Matt Forsyth

  3. May 27, 2020

    Passed: Engineering - Setbacks

    Inspected by Matt Forsyth

  4. Jun 3, 2020

    Release to power company

    Inspected by Melissa Garber

  5. Jun 3, 2020

    Certificate-Release Certificate

    Inspected by Matt Forsyth

  6. Jun 3, 2020

    Passed: Engineering - Setbacks

    Inspected by Matt Forsyth

  7. Jun 3, 2020

    Passed: Mobile Home - Mobile Home Set-Up Final

    Need Septic Release To Complete Permit And Release Power

    Inspected by Matt Forsyth

  8. Jun 3, 2020

    Septic Release Inspection

    Inspected by Health Dept