Inspection |
Notes |
Performed By |
Date |
Passed: Engineering - Initial Driveway |
|
Mccormick, David |
4/29/2020 |
Passed: Building - Footer |
|
Tommy Matthews |
4/30/2020 |
Passed: Engineering - Setbacks |
|
Tommy Matthews |
4/30/2020 |
Failed: Electrical - Temporary Service |
Seal Holes In Bottom Of Panel. |
Tommy Matthews |
4/30/2020 |
Passed: Electrical - Temporary Service |
|
Matt Forsyth |
5/5/2020 |
Release to power company |
|
Matt Forsyth |
5/5/2020 |
Passed: Plumbing/Gas - 1st Underground Rough–In |
|
Matt Forsyth |
5/5/2020 |
Passed: Building - Slab |
|
Tommy Matthews |
5/7/2020 |
Passed: Building - Roof Decking |
|
Matt Forsyth |
5/20/2020 |
Passed: Building - Wall Sheathing |
|
Matt Forsyth |
5/20/2020 |
Failed: Building - Framing |
Hurricane Clip In Garage Not Nailed On Top Half. All Threads Not Complete As Per Plan. |
Tommy Matthews |
6/9/2020 |
Passed: Electrical - 2nd Rough-In |
|
Tommy Matthews |
6/9/2020 |
Passed: Mechanical - Rough In |
|
Tommy Matthews |
6/9/2020 |
Failed: Plumbing/Gas - 2nd Rough-In |
Not Complete In 2nd Bath. Tub Not Connected. |
Tommy Matthews |
6/9/2020 |
Failed: Building - Framing |
Need Two All Threads Around Window Back Left Of House |
Tommy Matthews |
6/11/2020 |
Passed: Building - Insulation |
|
Tommy Matthews |
6/11/2020 |
Passed: Plumbing/Gas - 2nd Rough-In |
|
Tommy Matthews |
6/11/2020 |
Passed: Building - Framing |
|
Tommy Matthews |
6/12/2020 |
Passed: Engineering - Final Driveway |
|
Mccormick, David |
7/2/2020 |
Release to power company |
|
Laurie Hodson |
7/6/2020 |
Passed: Electrical - Permanent Power |
Need Septic Release |
Troy Crews |
7/6/2020 |
Septic Release Inspection |
|
Health Dept |
7/6/2020 |
Rescheduled 7/16/2020:Building - Final |
|
Troy Crews |
7/15/2020 |
Passed: Building - Final |
|
Troy Crews |
7/16/2020 |