Inspection |
Notes |
Performed By |
Date |
Passed: Building - Footer |
Organic Material Must Be Removed Prior To Fill. We Require That We Inspect Before Fill Is Installed. Need Porto Potti Prior To Next Inspection. |
Tommy Matthews |
4/30/2020 |
Passed: Engineering - Setbacks |
|
Tommy Matthews |
4/30/2020 |
Passed: Building - Footer |
|
Matt Forsyth |
5/11/2020 |
Passed: Engineering - Setbacks |
|
Matt Forsyth |
5/11/2020 |
Passed: Plumbing/Gas - 1st Underground Rough–In |
|
Tommy Matthews |
5/14/2020 |
Passed: Building - Slab |
|
Matt Forsyth |
5/15/2020 |
Passed: Electrical - Temporary Service |
|
Tommy Matthews |
5/20/2020 |
Release to power company |
|
Tommy Matthews |
5/20/2020 |
Passed: Building - Roof Decking |
|
Tommy Matthews |
5/28/2020 |
Passed: Building - Wall Sheathing |
|
Tommy Matthews |
5/28/2020 |
Release to power company |
Changed Power Company From Duke To Clay |
Laurie Hodson |
6/2/2020 |
Failed: Building - Strapping |
All Headers Spaning 12 Feet Plus Need To Be Pre-engineered. See Garage Door Header And Back Porch Header. See Note 7.
all Headers Should Have At Least 2 Full Length Studs At Each End Of Headers. Garage Door Should Have 4.
spacing Of Porch Columns Shall Not Exceed 9 Foot 6 Inch.
according To Drawing, Opening Should Have Min. Of 2 Jack Stuck.
south End Of Trusses A1gir, A-2, A-3 & A-4 Has No Clip.
seal Hole In Floor Below Gaeden Tub |
Tommy Matthews |
6/12/2020 |
Passed: Electrical - 2nd Rough-In |
See Adendum From Engineer On Updated Reg's For Headers. Rec'd 6/22/20 |
Tommy Matthews |
6/12/2020 |
Passed: Mechanical - Rough In |
|
Tommy Matthews |
6/12/2020 |
Failed: Plumbing/Gas - 2nd Rough-In |
Seal Hole Under Garden Tub |
Tommy Matthews |
6/12/2020 |
Passed: Plumbing/Gas - 2nd Rough-In |
|
Tommy Matthews |
6/24/2020 |
Passed: Building - Insulation |
|
Tommy Matthews |
6/24/2020 |
Failed: Building - Framing |
South End Of Trusses A1gir, A-2, A-3 & A-4 Has No Clips. |
Tommy Matthews |
6/24/2020 |
Passed: Building - Framing |
|
Tommy Matthews |
6/24/2020 |
Septic Release Inspection |
|
Health Dept |
8/21/2020 |
Passed: Electrical - Permanent Power |
|
Troy Crews |
8/31/2020 |
Release to power company |
|
Troy Crews |
8/31/2020 |
Failed: Building - Final |
Missing Blower Door Test And Final Termite Treatment |
Matt Forsyth |
1/15/2021 |
Passed: Building - Final |
Blower Door Received And Termite Treatment |
Matt Forsyth |
1/15/2021 |