Permit Details

Permit Search

Permit

New Residential Construction

254 SW THISTLEWOOD LN
FORT WHITE, FL 32038

Permit #
000039669
Application #
44832
Status Completed
  1. Submitted —
  2. Issued Apr 24, 2020
  3. Expires Jul 14, 2021
  4. Completed Jan 15, 2021

Property

Parcel #
04056-124
Owner
Terry Craig A & Lisa
Acres
1.25
Subdivision
Thornwood
Zoning
FORT WHITE
Flood zone
X
District
2

Permit

Status
Completed
Septic release
Released
Related permit
—

Job Details

Finished floor requirement
COMPLY WITH TOWN FORT WHITE REQUIREMENTS
Fema map number
12023C0490C
This is the construction of a
Single Family Dwelling
Setbacks Front
FORT WHITE
Setback Side 1
FORT WHITE
Setback Side 2
FORT WHITE
Setbacks Rear
FORT WHITE
Stories
1
Heated Area (Sqft)
1844
Total Area (Sqft)
2694
Building Height
18
Building Code Construction Type
V
Building Code Element
B
Building Code Occupancy Types
Residential
Occupancy Use Title
single family
Building Code Edition
Florida Building Code 2017 6th Edition & 2014 National Electrical Code
Septic# (00-0000) or (X00-000)
20-0219

Status & Review History

  1. Point Review - Received
  2. Zoning Review - Completed/Sent for Final Review
  3. Permit Issued

Contractors

  • Jeffrey P Bokor

    Dwc Contracting, Inc.

    License
    CGC1517145
    Title
    General Contractor
    Role
    Contractor

    Liability Insurance Expired.

  • Ryan C Beville

    Rbi Electrical Contracting Llc

    License
    EC13004236
    Title
    Electrical Contractor
    Role
    Subcontractor
  • Samuel L Roberts

    Air Ducks Inc

    License
    CAC1817288
    Title
    Class "b" A/c
    Role
    Subcontractor

    County License & State License & Liability Insurance & Workers Comp & Employees Workers Comp Expired.

  • James Butler Jr

    Butler Plumbing Of Gainesville Inc

    License
    CFC057960
    Title
    Plumbing Contractor
    Role
    Subcontractor
  • Jeffrey Bokor

    Dwc Contracting Llc

    License
    CCC1329756
    Title
    Roofing Contractor
    Role
    Subcontractor

    Liability Insurance Expired.

Inspections

  1. Apr 30, 2020

    Passed: Building - Footer

    Organic Material Must Be Removed Prior To Fill. We Require That We Inspect Before Fill Is Installed. Need Porto Potti Prior To Next Inspection.

    Inspected by Tommy Matthews

  2. Apr 30, 2020

    Passed: Engineering - Setbacks

    Inspected by Tommy Matthews

  3. May 11, 2020

    Passed: Building - Footer

    Inspected by Matt Forsyth

  4. May 11, 2020

    Passed: Engineering - Setbacks

    Inspected by Matt Forsyth

  5. May 14, 2020

    Passed: Plumbing/Gas - 1st Underground Rough–In

    Inspected by Tommy Matthews

  6. May 15, 2020

    Passed: Building - Slab

    Inspected by Matt Forsyth

  7. May 20, 2020

    Passed: Electrical - Temporary Service

    Inspected by Tommy Matthews

  8. May 20, 2020

    Release to power company

    Inspected by Tommy Matthews

  9. May 28, 2020

    Passed: Building - Roof Decking

    Inspected by Tommy Matthews

  10. May 28, 2020

    Passed: Building - Wall Sheathing

    Inspected by Tommy Matthews

  11. Jun 2, 2020

    Release to power company

    Changed Power Company From Duke To Clay

    Inspected by Laurie Hodson

  12. Jun 12, 2020

    Failed: Building - Strapping

    All Headers Spaning 12 Feet Plus Need To Be Pre-engineered. See Garage Door Header And Back Porch Header. See Note 7. all Headers Should Have At Least 2 Full Length Studs At Each End Of Headers. Garage Door Should Have 4. spacing Of Porch Columns Shall Not Exceed 9 Foot 6 Inch. according To Drawing, Opening Should Have Min. Of 2 Jack Stuck. south End Of Trusses A1gir, A-2, A-3 & A-4 Has No Clip. seal Hole In Floor Below Gaeden Tub

    Inspected by Tommy Matthews

  13. Jun 12, 2020

    Passed: Electrical - 2nd Rough-In

    See Adendum From Engineer On Updated Reg's For Headers. Rec'd 6/22/20

    Inspected by Tommy Matthews

  14. Jun 12, 2020

    Passed: Mechanical - Rough In

    Inspected by Tommy Matthews

  15. Jun 12, 2020

    Failed: Plumbing/Gas - 2nd Rough-In

    Seal Hole Under Garden Tub

    Inspected by Tommy Matthews

  16. Jun 24, 2020

    Passed: Plumbing/Gas - 2nd Rough-In

    Inspected by Tommy Matthews

  17. Jun 24, 2020

    Passed: Building - Insulation

    Inspected by Tommy Matthews

  18. Jun 24, 2020

    Failed: Building - Framing

    South End Of Trusses A1gir, A-2, A-3 & A-4 Has No Clips.

    Inspected by Tommy Matthews

  19. Jun 24, 2020

    Passed: Building - Framing

    Inspected by Tommy Matthews

  20. Aug 21, 2020

    Septic Release Inspection

    Inspected by Health Dept

  21. Aug 31, 2020

    Passed: Electrical - Permanent Power

    Inspected by Troy Crews

  22. Aug 31, 2020

    Release to power company

    Inspected by Troy Crews

  23. Jan 15, 2021

    Failed: Building - Final

    Missing Blower Door Test And Final Termite Treatment

    Inspected by Matt Forsyth

  24. Jan 15, 2021

    Passed: Building - Final

    Blower Door Received And Termite Treatment

    Inspected by Matt Forsyth