Inspection |
Notes |
Performed By |
Date |
Septic Release Inspection |
|
Health Dept |
3/12/2020 |
Passed: Plumbing/Gas - 1st Underground Rough–In |
|
Matt Forsyth |
4/29/2020 |
Passed: Building - Monolithic Slab |
|
Matt Forsyth |
4/30/2020 |
Passed: Engineering - Setbacks |
|
Matt Forsyth |
4/30/2020 |
Failed: Building - Roof Decking |
Nails Coming Thru Sheeting Will Have To Be Removed And Renailed |
Matt Forsyth |
6/12/2020 |
Failed: Building - Wall Sheathing |
Not Complete |
Matt Forsyth |
6/12/2020 |
Passed: Building - Roof Decking |
|
Matt Forsyth |
6/24/2020 |
Passed: Building - Wall Sheathing |
|
Matt Forsyth |
6/24/2020 |
Failed: Building - Framing |
All Framing Work Needs To Be Complete (posts&strapping) |
Matt Forsyth |
6/24/2020 |
Passed: Electrical - 2nd Rough-In |
|
Matt Forsyth |
8/4/2020 |
Passed: Mechanical - Rough In |
|
Matt Forsyth |
8/4/2020 |
Passed: Plumbing/Gas - 2nd Rough-In |
|
Matt Forsyth |
8/4/2020 |
Failed: Building - Framing |
Need Truss Engineering Done. Need Porch Beams Nailed 10inches On Center Two Rows Need Porch Posts Installed With Straps |
Matt Forsyth |
8/4/2020 |
Passed: Building - Framing |
|
Matt Forsyth |
8/18/2020 |
Passed: Mechanical - Rough In |
Gas Line Kitchen And Fireplace |
Matt Forsyth |
8/24/2020 |
Passed: Building - Insulation |
|
Matt Forsyth |
8/26/2020 |
Passed: Building - Fire Rated Wall |
Fireplace |
Matt Forsyth |
10/12/2020 |
Failed: Electrical - Temporary Service |
Inspection Is For Permanent Power. Service Is Not Finished Outside And All Wiring Must Be Made Up Or Have Wire Nuts |
Matt Forsyth |
11/23/2020 |
Passed: Electrical - Permanent Power |
|
Matt Forsyth |
12/9/2020 |
Release to power company |
|
Matt Forsyth |
12/9/2020 |