Inspection |
Notes |
Performed By |
Date |
Passed: Engineering - Initial Driveway |
|
Mccormick, David |
1/6/2020 |
Cancelled: Engineering - Setbacks |
|
Melissa Garber |
5/11/2020 |
Cancelled: Building - Footer |
|
Melissa Garber |
5/11/2020 |
Cancelled: Building - Footer |
|
Melissa Garber |
5/11/2020 |
Cancelled: Engineering - Setbacks |
|
Melissa Garber |
5/11/2020 |
Cancelled: Building - Footer |
|
Melissa Garber |
5/11/2020 |
Cancelled: Engineering - Setbacks |
|
Melissa Garber |
5/11/2020 |
Failed: Electrical - Temporary Service |
Need Gfci Protection On Outdoor Recptical |
Matt Forsyth |
5/12/2020 |
Failed: Building - Footer |
Number 3 Bar In Footing Is Missing It's Called A Trans Verse Bar 48 Inches On Center. Dowel Bar In Footing At 48 Inches On Center Can Be Wet Set With Footing Pour |
Matt Forsyth |
5/13/2020 |
Passed: Engineering - Setbacks |
|
Matt Forsyth |
5/13/2020 |
Rescheduled 5/15/2020:Electrical - Temporary Service |
|
Matt Forsyth |
5/14/2020 |
Passed: Electrical - Temporary Service |
|
Matt Forsyth |
5/15/2020 |
Release to power company |
|
Matt Forsyth |
5/15/2020 |
Passed: Building - Footer |
|
Matt Forsyth |
5/15/2020 |
Passed: Engineering - Setbacks |
|
Matt Forsyth |
5/15/2020 |
Failed: Plumbing/Gas - 1st Underground Rough–In |
Need Water Test On Sanitary Pipe |
Matt Forsyth |
6/24/2020 |
Passed: Plumbing/Gas - 1st Underground Rough–In |
|
Tommy Matthews |
6/25/2020 |
Rescheduled 7/2/2020:Building - Slab |
Rescheduled Per Contractor |
Melissa Garber |
7/1/2020 |
Passed: Building - Slab |
|
Tommy Matthews |
7/2/2020 |
Cancelled: Building - Framing |
|
Melissa Garber |
10/5/2020 |
Cancelled: Building - Strapping |
|
Melissa Garber |
10/5/2020 |
Passed: Building - Framing |
|
Matt Forsyth |
10/8/2020 |
Failed: Building - Strapping |
Need Truss To Wall Strap |
Matt Forsyth |
10/8/2020 |
Passed: Building - Framing |
Simpson 8"screw's |
Matt Forsyth |
10/13/2020 |
Passed: Building - Wall Sheathing |
|
Matt Forsyth |
10/27/2020 |
Passed: Electrical - 1st Underground Rough–In |
Conduit To House From Electric C.o. Pole |
Troy Crews |
4/14/2021 |
Passed: Electrical - 2nd Rough-In |
|
Matt Forsyth |
8/10/2021 |
Failed: Plumbing/Gas - 2nd Rough-In |
Nail Plates Needed When Vent Stack Or Water Supply Comes With In Inch And A Half Of Face Of Stud |
Matt Forsyth |
8/24/2021 |
Passed: Engineering - Final Driveway |
|
Mccormick, David |
9/7/2021 |
Septic Release Inspection |
|
Health Dept |
9/10/2021 |
Passed: Building - Insulation |
|
Matt Forsyth |
9/23/2021 |
Passed: Plumbing/Gas - 2nd Rough-In |
|
Matt Forsyth |
9/23/2021 |
Failed: Electrical - Permanent Power |
Conduit Not Run For Service Entrance Conductors Also Need Driveway Release No Groundrod Installed |
Matt Forsyth |
9/23/2021 |
Passed: Plumbing/Gas - Tub Set/Shower Pan |
Need Stairwell Built Before Next Inspection |
Matt Forsyth |
10/26/2021 |
Passed: Building - Insulation |
|
Matt Forsyth |
12/21/2021 |
Failed: Building - Final |
Blower Door Final Termite |
Matt Forsyth |
5/27/2022 |
Cancelled: Electrical - Permanent Power |
|
Matt Forsyth |
5/27/2022 |
Passed: Electrical - Permanent Power |
|
Matt Forsyth |
5/31/2022 |
Release to power company |
|
Matt Forsyth |
5/31/2022 |
Failed: Building - Final |
Need Kitchen Sink In Place, Landing At Doors 8.75 Inch Max Step Could Not Get In To Check Other Items. |
Troy Crews |
11/23/2022 |
Passed: Engineering - Spot Check |
Gave Owner Parcel Checklist |
Troy Crews |
11/23/2022 |
Passed: Building - Final |
|
Matt Forsyth |
2/24/2023 |