Columbia County is committed to ensuring accessibility to this website regardless of disability. If anyone encounters a feature on this website that is inaccessible due to a disability, please contact the County Manger’s Office and the Columbia County Board of County Commissioners at (386) 758-1005. You may also email that office at patrick_weaver@columbiacountyfla.com and provide a brief description of the inaccessible feature. The County will either correct the inaccessible feature or, if correction is not possible due to technical limitations, provide the desired information through alternative means.

Skip to content

Columbia County, FL | Permit Details

Mobile Home Permit
Address 503 SE HOPEFUL DR
LAKE CITY, FL 32025
Parcel #: 09030-053
Acres: 2.14
Owner: Edge Randall & Joann
Subdivision:
Zoning: A-3
Flood Zone: X
District: 4
Application #: 44772
Permit #: 000039545
Related Permit:
Submitted:
Issued: Wednesday, April 1, 2020
Expires: Monday, April 20, 2020
Completed: Monday, April 20, 2020
Status: Completed
Septic Release? Yes
Notes:
LEGAL LOT OF RECORD - 1989 DEED CHECK 30' SIDE SETBACK IN FIELD
Job Details
Mobile Home is a: Single Wide
Year Built 1994
Width (Ft.In) 14
Length (Ft.In) 70
Wind Zone? 2
Serial # 1361-044 g
Installation Decal # 40220
Residential or Commercial Use? Residential
Driveway access to home: Existing Drive
Are you applying for a 5 year temporary permit? No
Septic # (00-0000) or (X00-000) 20-0205
Dev Permit # F023-
Setbacks Front 30
Setback Side 1 25
Setback Side 2 25
Setbacks Rear 25
Elevation regulation Minimum Requirement
Finished floor requirement One foot above the road
Fema map number 12023C0405C
Review Notes
3/31/2020 Plan Review - Completed/Sent for Zoning Review
3/31/2020 Zoning Review - Completed/Sent for Final Review
4/1/2020 Permit Issued Permit #000039545 created and approved.
Contractors
Name/ Business License Title Role
Fermon Jones
Fermon Jones Enterprises
County License & State License Expired.
IH1025418 Mh Installer (ih) Contractor
Inspections
Inspection Notes Performed By Date
Passed: Mobile Home - In County Pre-Mobile Home before set-up Matt Forsyth 4/1/2020
Septic Release Inspection Health Dept 4/7/2020
Passed: Mobile Home - Mobile Home Set-Up Final Troy Crews 4/20/2020
Release to power company Troy Crews 4/20/2020
Passed: Engineering - Setbacks Troy Crews 4/20/2020