Inspection |
Notes |
Performed By |
Date |
Passed: Engineering - Initial Driveway |
|
Mccormick, David |
3/23/2020 |
Passed: Building - Footer |
|
Matt Forsyth |
3/26/2020 |
Passed: Engineering - Setbacks |
|
Matt Forsyth |
3/26/2020 |
Passed: Electrical - 1st Underground Rough–In |
|
Matt Forsyth |
4/14/2020 |
Passed: Plumbing/Gas - 1st Underground Rough–In |
|
Matt Forsyth |
4/14/2020 |
Release to power company |
Sent To Wrong Power Comp.
jlw Changed....... |
Matt Forsyth |
4/20/2020 |
Passed: Building - Slab |
|
Matt Forsyth |
4/20/2020 |
Passed: Electrical - Temporary Service |
|
Matt Forsyth |
4/20/2020 |
Release to power company |
|
Matt Forsyth |
4/20/2020 |
Passed: Building - Ext Strapping/Wall Sheathing |
|
Matt Forsyth |
5/20/2020 |
Passed: Building - Roof Decking |
|
Matt Forsyth |
5/20/2020 |
Passed: Building - Framing |
Window In Upstairs Bonus Room Must Have A Clear Opening Of 24 By 20 Inches |
Matt Forsyth |
5/26/2020 |
Passed: Electrical - 2nd Rough-In |
|
Matt Forsyth |
7/6/2020 |
Failed: Mechanical - Rough In |
Refrigeration Line's Need Nail Plate At Top Of Wall |
Matt Forsyth |
7/6/2020 |
Passed: Plumbing/Gas - 2nd Rough-In |
|
Matt Forsyth |
7/6/2020 |
Passed: Plumbing/Gas - Tub Set/Shower Pan |
|
Matt Forsyth |
7/6/2020 |
Failed: Building - Insulation |
Nail Plates Were Not Addressed Properly |
Matt Forsyth |
7/13/2020 |
Passed: Building - Insulation |
|
Matt Forsyth |
8/6/2020 |
Passed: Mechanical - Rough In |
|
Matt Forsyth |
8/6/2020 |
Cancelled: Plumbing/Gas - Tub Set/Shower Pan |
|
Matt Forsyth |
9/9/2020 |
Passed: Electrical - Permanent Power |
Septic And Driveway Have Not Been Received-- Just Need Septic Release |
Matt Forsyth |
11/24/2020 |
Passed: Engineering - Final Driveway |
|
Mccormick, David |
12/30/2020 |
Release to power company |
|
Melissa Garber |
1/25/2021 |
Cancelled: Electrical - Permanent Power |
|
Melissa Garber |
1/25/2021 |
Septic Release Inspection |
|
Health Dept |
1/25/2021 |
Failed: Building - Final |
Need Blower Door Test And Hot Water Heater Overflow Pan Piped To The Outside |
Matt Forsyth |
3/3/2021 |
Passed: Building - Final |
|
Matt Forsyth |
3/5/2021 |
Certificate-Release Certificate |
Lh - Corrected Name Error On Co |
Matt Forsyth |
3/9/2021 |