Inspection |
Notes |
Performed By |
Date |
Passed: Engineering - Initial Driveway |
|
Mccormick, David |
3/23/2020 |
Passed: Building - Footer |
|
Matt Forsyth |
4/9/2020 |
Passed: Engineering - Setbacks |
|
Matt Forsyth |
4/9/2020 |
Passed: Plumbing/Gas - 1st Underground Rough–In |
|
Troy Crews |
4/27/2020 |
Passed: Building - Slab |
Need Corrected Termite Paperwork An Engineering For Footer Adjustment |
Troy Crews |
4/28/2020 |
Passed: Building - Roof Decking |
|
Matt Forsyth |
5/29/2020 |
Passed: Building - Wall Sheathing |
|
Matt Forsyth |
5/29/2020 |
Passed: Building - Ext Strapping/Wall Sheathing |
|
Matt Forsyth |
6/23/2020 |
Passed: Building - Framing |
|
Matt Forsyth |
6/23/2020 |
Passed: Building - Strapping |
|
Matt Forsyth |
6/23/2020 |
Passed: Electrical - 2nd Rough-In |
|
Matt Forsyth |
6/23/2020 |
Passed: Mechanical - Rough In |
|
Matt Forsyth |
6/23/2020 |
Passed: Plumbing/Gas - 2nd Rough-In |
|
Matt Forsyth |
6/23/2020 |
Failed: Building - Insulation |
No Work Done |
Matt Forsyth |
7/1/2020 |
Failed: Building - Insulation |
Not Complete For Second Lnspection |
Matt Forsyth |
7/7/2020 |
Passed: Building - Insulation |
Part Of Attic Wil Be Blown Lnsulation |
Matt Forsyth |
7/17/2020 |
Passed: Electrical - Permanent Power |
Need Septic(rec'd) And Driveway To Release Power |
Matt Forsyth |
11/17/2020 |
Septic Release Inspection |
Need Driveway To Release Power |
Health Dept |
12/7/2020 |
Passed: Engineering - Final Driveway |
|
Mccormick, David |
1/12/2021 |
Release to power company |
|
Melissa Garber |
1/13/2021 |
Failed: Building - Final |
Need*dishwasher Powered *mb Tub Installed *landing In Garage*hot Water Heater In Pan Piped To Outside*access To Mechanical
room*attic Ladder To Short*blower Door Test |
Matt Forsyth |
3/15/2021 |
Passed: Building - Final |
Mb Tub Roughed In For Future |
Matt Forsyth |
3/17/2021 |