Inspection |
Notes |
Performed By |
Date |
Passed: Engineering - Initial Driveway |
|
Mccormick, David |
3/19/2020 |
Passed: Building - Footer |
|
Troy Crews |
5/6/2020 |
Passed: Engineering - Setbacks |
|
Troy Crews |
5/6/2020 |
Passed: Plumbing/Gas - 1st Underground Rough–In |
|
Troy Crews |
5/20/2020 |
Passed: Building - Slab |
|
Troy Crews |
5/28/2020 |
Passed: Building - Roof Decking |
|
Troy Crews |
6/16/2020 |
Passed: Building - Wall Sheathing |
|
Troy Crews |
6/16/2020 |
Failed: Building - Framing |
Solar Heat Gain Coefficient Of Windows Do Not Match Energy Code |
Troy Crews |
7/27/2020 |
Failed: Mechanical - Rough In |
Main Trunkline Still Open On The End |
Troy Crews |
7/27/2020 |
Passed: Plumbing/Gas - 2nd Rough-In |
|
Troy Crews |
7/27/2020 |
Failed: Electrical - 2nd Rough-In |
Bath Fan Not Connected |
Troy Crews |
7/27/2020 |
Failed: Building - Framing |
Need New Energy Calculations, Also Need Elevation Confirmation From Surveyor |
Troy Crews |
8/10/2020 |
Failed: Building - Insulation |
Need New Energy Calculations And Surveyor Letter |
Troy Crews |
8/10/2020 |
Failed: Electrical - 2nd Rough-In |
|
Troy Crews |
8/10/2020 |
Failed: Mechanical - Rough In |
|
Troy Crews |
8/10/2020 |
Passed: Building - Framing |
|
Troy Crews |
8/12/2020 |
Passed: Building - Insulation |
|
Troy Crews |
8/12/2020 |
Passed: Electrical - 2nd Rough-In |
|
Troy Crews |
8/12/2020 |
Passed: Mechanical - Rough In |
|
Troy Crews |
8/12/2020 |
Septic Release Inspection |
|
Health Dept |
10/21/2020 |
Passed: Electrical - Permanent Power |
Need Final Driveway Inspection |
Troy Crews |
11/4/2020 |
Failed: Engineering - Final Driveway |
Concrete Not Poured On Mitred Ends. |
Mccormick, David |
11/5/2020 |
Release to power company |
Drive Approved |
Laurie Hodson |
11/12/2020 |
Passed: Engineering - Final Driveway |
|
Mccormick, David |
11/12/2020 |
Cancelled: Electrical - Permanent Power |
|
Troy Crews |
11/12/2020 |
Failed: Building - Final |
Need Outlet At Front, Locking Caps On Ac Condenser Service Ports, Need To Seal Ductwork At Air Handler Supply And Return On Back, Finish Eyebrow Roofs Rake Trim Etc., Blower Door Test |
Troy Crews |
11/25/2020 |
Passed: Building - Final |
Release Pending Blower Door Correction, Also Put Locking Cap On Third Port At Condenser |
Troy Crews |
12/4/2020 |
Certificate-Release Certificate |
Blower Door Test Received |
Troy Crews |
12/7/2020 |