Inspection |
Notes |
Performed By |
Date |
Passed: Engineering - Initial Driveway |
|
Mccormick, David |
3/13/2020 |
Passed: Plumbing/Gas - 1st Underground Rough–In |
|
Tommy Matthews |
3/13/2020 |
Failed: Building - Slab |
Need Push Ups Under Wire Mesh. |
Tommy Matthews |
3/17/2020 |
Passed: Building - Slab |
Engineer Authorization Received |
Tommy Matthews |
3/24/2020 |
Passed: Building - Ext Strapping/Wall Sheathing |
Strapping Not Included. Wall Nailing Ok And Can Be Covered. Leave Any Strapping Exposed For Next Inspection. |
Tommy Matthews |
3/26/2020 |
Passed: Building - Roof Decking |
|
Matt Forsyth |
4/8/2020 |
Passed: Building - Framing |
|
Matt Forsyth |
4/17/2020 |
Passed: Building - Framing |
|
Matt Forsyth |
5/5/2020 |
Passed: Electrical - 2nd Rough-In |
|
Matt Forsyth |
5/5/2020 |
Passed: Mechanical - Rough In |
|
Matt Forsyth |
5/5/2020 |
Passed: Plumbing/Gas - 2nd Rough-In |
Need Tub And Shower Water Test On Next Inspection |
Matt Forsyth |
5/5/2020 |
Passed: Building - Insulation |
|
Troy Crews |
5/8/2020 |
Septic Release Inspection |
|
Health Dept |
7/7/2020 |
Passed: Engineering - Final Driveway |
|
Mccormick, David |
7/8/2020 |
Rescheduled 7/9/2020:Electrical - Permanent Power |
|
Troy Crews |
7/8/2020 |
Failed: Electrical - Permanent Power |
Need Protection For The Electrical Panel Box Overhead Garage Door Needs To Be Installed |
Matt Forsyth |
7/9/2020 |
Passed: Electrical - Permanent Power |
|
Tommy Matthews |
7/20/2020 |
Release to power company |
|
Tommy Matthews |
7/20/2020 |
Failed: Building - Final |
Power Not On. |
Tommy Matthews |
7/21/2020 |
Passed: Building - Final |
4" Ffe Confirm By Mcf |
Matt Forsyth |
8/18/2020 |
(Requested) Electrical -Permanent Power |
|
|
|