Columbia County is committed to ensuring accessibility to this website regardless of disability. If anyone encounters a feature on this website that is inaccessible due to a disability, please contact the County Manger’s Office and the Columbia County Board of County Commissioners at (386) 758-1005. You may also email that office at patrick_weaver@columbiacountyfla.com and provide a brief description of the inaccessible feature. The County will either correct the inaccessible feature or, if correction is not possible due to technical limitations, provide the desired information through alternative means.

Skip to content

Columbia County, FL | Permit Details

Mobile Home Permit
Address 333 NW PARK DR
LAKE CITY, FL 32055
Parcel #: 02440-000
Acres: 26.00
Owner: Twin Springs Mobile Home Park Llc
Subdivision: Twin Springs Mh Park
Zoning: RSF-2
Flood Zone: X
District: 3
Application #: 44636
Permit #: 000039435
Related Permit:
Submitted:
Issued: Wednesday, March 11, 2020
Expires: Wednesday, May 20, 2020
Completed: Wednesday, May 20, 2020
Status: Completed
Septic Release? Yes
Notes:
REPLACING AN EXISTING MOBILE IN AN EXISTING HOME PARK, MINIMUM FLOOR ELEVATION - ONE FOOT ABOVE THE ROAD
Job Details
Mobile Home is a: Double Wide
Year Built 1989
Width (Ft.In) 28
Length (Ft.In) 60
Wind Zone? 2
Serial # pho65507ab
Installation Decal # 69290
Power Company FL Power & Light
Residential or Commercial Use? Residential
Is this replacing an existing Home? No
Number of homes now on property? 10
Driveway access to home: Private Drive
Septic # 20-0160
Dev Permit # F023-
Setbacks Front 25
Setback Side 1 10
Setback Side 2 10
Setbacks Rear 15
Elevation regulation Minimum Requirement
Finished floor requirement One foot above the road
Requirement needed By Final Inspection
Fema map number 12023C0280D
Review Notes
3/2/2020 Point Review - Status Cleared
3/11/2020 Permit Issued Permit #000039435 created and approved.
Contractors
Name/ Business License Title Role
David Albright

IH1129420 Mh Installer (ih) Contractor
Inspections
Inspection Notes Performed By Date
Passed: Mobile Home - In County Pre-Mobile Home before set-up Matt Forsyth 3/3/2020
Septic Release Inspection Health Dept 3/12/2020
Passed: Mobile Home - Mobile Home Set-Up Final Troy Crews 5/20/2020
Release to power company Troy Crews 5/20/2020
Passed: Engineering - Setbacks Troy Crews 5/20/2020