Mobile Home
Permit
| Application #: | 43796 |
| Permit #: |
000039410 |
| Related Permit: |
|
| Submitted: | Monday, October 14, 2019 |
| Issued: | Thursday, March 5, 2020 |
| Expires: | Thursday, August 27, 2020 |
| Completed: | Thursday, August 27, 2020 |
| Status: |
Completed |
| Septic Release? |
No |
Job Details
| Finished floor requirement |
|
| Fema map number |
12023C0379C |
| Mobile Home is a: |
Double Wide |
| Year Built |
1998 |
| Width (Ft.In) |
28 |
| Length (Ft.In) |
44 |
| Driveway access to home: |
Existing Drive |
| Installation Decal # |
53876 |
| Setbacks Front |
30 |
| Setback Side 1 |
25 |
| Setbacks Rear |
25 |
| Dev Permit # |
F023- |
| Setback Side 2 |
25 |
| Are you applying for a 5 year temporary permit? |
No |
| Serial # |
fla645771 |
| Wind Zone? |
2 |
| Residential or Commercial Use? |
Residential |
Contractors
| Name / Business |
License |
Title |
Role |
Glenn M Williams Jr North Fl Mobile Home Installers Llc
|
IH1054858 |
Mh Installer (ih) |
Contractor |
Inspections
| Inspection |
Notes |
Performed By |
Date |
| Mobile Home-In County Pre-Mobile Home before set-up |
|
Tc |
10/11/2019 |
| Failed: Mobile Home - Mobile Home Set-Up Final |
(picture Of Data Plate On File-lh) Bonding Wire Loose Unprotected Conductors In Service Panel Duck Work Under The House Not 3 And A Half Inches Off Ground |
Matt Forsyth |
3/10/2020 |
| Passed: Engineering - Setbacks |
|
Matt Forsyth |
3/10/2020 |
| Passed: Engineering - Setbacks |
|
Matt Forsyth |
5/6/2020 |
| Failed: Mobile Home - Mobile Home Set-Up Final |
See Notes |
Matt Forsyth |
5/6/2020 |
| Passed: Engineering - Setbacks |
|
Matt Forsyth |
6/30/2020 |
| Failed: Mobile Home - Mobile Home Set-Up Final |
Need To Look At Electrical Panel Inside |
Matt Forsyth |
6/30/2020 |
| Passed: Mobile Home - Mobile Home Set-Up Final |
|
Matt Forsyth |
8/27/2020 |
| Release to power company |
|
Matt Forsyth |
8/27/2020 |
| Passed: Engineering - Setbacks |
|
Matt Forsyth |
8/27/2020 |