Columbia County is committed to ensuring accessibility to this website regardless of disability. If anyone encounters a feature on this website that is inaccessible due to a disability, please contact the County Manger’s Office and the Columbia County Board of County Commissioners at (386) 758-1005. You may also email that office at patrick_weaver@columbiacountyfla.com and provide a brief description of the inaccessible feature. The County will either correct the inaccessible feature or, if correction is not possible due to technical limitations, provide the desired information through alternative means.

Skip to content

Columbia County, FL | Permit Details

Mobile Home Permit
Address 1117 SW BARON GLN
FORT WHITE, FL 32038
Parcel #: 03752-417
Acres: 4.77
Owner: Bullard-denune Investment Co / Jonathan Talley-mh
Subdivision: Southern Meadows Phase 3
Zoning: A-3
Flood Zone: X
District: 4
Application #: 44550
Permit #: 000039341
Related Permit:
Submitted:
Issued: Monday, February 24, 2020
Expires: Monday, April 27, 2020
Completed: Monday, April 27, 2020
Status: Completed
Septic Release? Yes
Notes:
MINIMUM FLOOR ELEVATION - PER PLAT MFE SET AT 89.50', NEED ELEVATION LETTER BEFORE POWER
Job Details
Mobile Home is a: Double Wide
Year Built 2019
Width (Ft.In) 32
Length (Ft.In) 60
Wind Zone? 2
Serial # FLTHLCT32753826AB
Installation Decal # 49721
Residential or Commercial Use? Residential
Driveway access to home: Private Drive
Are you applying for a 5 year temporary permit? No
Septic # (00-0000) or (X00-000) 18-0528
Dev Permit # F023-
Setbacks Front 30
Setback Side 1 25
Setback Side 2 25
Setbacks Rear 25
Finished floor requirement 89.50' PER PLAT
Fema map number 12023C0390C
Review Notes
2/21/2020 Plan Review - Completed/Sent for Zoning Review
2/21/2020 Zoning Review - Completed/Sent for Final Review
2/24/2020 Permit Issued Permit # created and approved.
Contractors
Name/ Business License Title Role
Stephanie Talley
Talley Mobile Home Setup
County License & State License Expired.
IH11248521 Mh Installer (ih) Contractor
Inspections
Inspection Notes Performed By Date
Septic Release Inspection Health Dept 4/1/2020
Passed: Mobile Home - Mobile Home Set-Up Final Matt Forsyth 4/27/2020
Release to power company Matt Forsyth 4/27/2020
Passed: Engineering - Setbacks Matt Forsyth 4/27/2020