Inspection |
Notes |
Performed By |
Date |
Passed: Engineering - Initial Driveway |
|
Mccormick, David |
1/7/2020 |
Passed: Building - Footer |
|
Matt Forsyth |
1/7/2020 |
Passed: Engineering - Setbacks |
|
Matt Forsyth |
1/7/2020 |
Failed: Electrical - Temporary Service |
Electrical Service Box Will Not Shut Properly |
Matt Forsyth |
1/7/2020 |
Passed: Electrical - Temporary Service |
|
Tommy Matthews |
1/8/2020 |
Release to power company |
|
Tommy Matthews |
1/8/2020 |
Passed: Plumbing/Gas - 1st Underground Rough–In |
|
Troy Crews |
1/14/2020 |
Passed: Building - Slab |
|
Troy Crews |
1/15/2020 |
Passed: Building - Ext Strapping/Wall Sheathing |
|
Matt Forsyth |
2/25/2020 |
Failed: Building - Framing |
Garage Plan Does Not Match What Was Built.
king Studs Not Placed As Required. One King Stud Per 3' Opening Width. Min. 2 Req'd. |
Tommy Matthews |
2/28/2020 |
Passed: Plumbing/Gas - 2nd Rough-In |
|
Tommy Matthews |
3/5/2020 |
Passed: Mechanical - Rough In |
|
Tommy Matthews |
3/5/2020 |
Passed: Electrical - 1st Underground Rough–In |
|
Tommy Matthews |
3/5/2020 |
Failed: Building - Framing |
Garage Faces Different Than Permit Set Indicates. |
Tommy Matthews |
3/5/2020 |
Passed: Building - Framing |
|
Tommy Matthews |
3/5/2020 |
Passed: Building - Insulation |
|
Tommy Matthews |
3/9/2020 |
Failed: Electrical - Permanent Power |
Need Septic Release. Need Driveway Acceptance. Need Tape Or Wire Nuts On Dishwasher Wire In Kitchen. Home Needs To Be Lockable. |
Tommy Matthews |
3/31/2020 |
Septic Release Inspection |
|
Health Dept |
3/31/2020 |
Passed: Electrical - Permanent Power |
Need Driveway Release To Complete - Completed 4.13.20 |
Matt Forsyth |
4/9/2020 |
Passed: Engineering - Final Driveway |
|
Mccormick, David |
4/13/2020 |
Release to power company |
Driveway Completed 04.13.20 |
Matt Forsyth |
4/14/2020 |
Passed: Building - Final |
|
Matt Forsyth |
4/22/2020 |