Inspection |
Notes |
Performed By |
Date |
Passed: Plumbing/Gas - 1st Underground Rough–In |
|
Matt Forsyth |
1/15/2020 |
Failed: Building - Footer |
Footing Inspection Will Be Done When Slab Is Ready For Concrete |
Matt Forsyth |
1/15/2020 |
Passed: Engineering - Setbacks |
|
Matt Forsyth |
1/15/2020 |
Failed: Building - Footer |
Missing Interior Footings For Bearing Walls |
Matt Forsyth |
1/16/2020 |
Passed: Engineering - Setbacks |
|
Matt Forsyth |
1/16/2020 |
Passed: Building - Monolithic Slab |
|
Matt Forsyth |
1/17/2020 |
Passed: Engineering - Setbacks |
|
Matt Forsyth |
1/17/2020 |
Passed: Building - Ext Strapping/Wall Sheathing |
All Porch Columns Still Need To Be Inspected For Their Beam Post Strapping |
Matt Forsyth |
2/18/2020 |
Passed: Building - Framing |
|
Matt Forsyth |
2/18/2020 |
Passed: Electrical - 2nd Rough-In |
|
Matt Forsyth |
3/12/2020 |
Failed: Mechanical - Rough In |
Need Manufacturer Of Exaust Fan Ductwork.airhander Work Not Complete. |
Matt Forsyth |
3/12/2020 |
Failed: Plumbing/Gas - 2nd Rough-In |
Need To Be Able To Perform Water Test On Bathtubs Could Not. |
Matt Forsyth |
3/12/2020 |
Passed: Building - Insulation |
|
Matt Forsyth |
3/17/2020 |
Passed: Building - Ext Strapping/Wall Sheathing |
|
Matt Forsyth |
3/18/2020 |
Passed: Mechanical - Rough In |
|
Matt Forsyth |
3/18/2020 |
Passed: Plumbing/Gas - 2nd Rough-In |
|
Matt Forsyth |
3/18/2020 |
Septic Release Inspection |
|
Health Dept |
4/27/2020 |
Failed: Electrical - Permanent Power |
Need Garage Door Installed |
Matt Forsyth |
5/6/2020 |
Passed: Electrical - Permanent Power |
|
Matt Forsyth |
5/27/2020 |
Release to power company |
|
Matt Forsyth |
5/27/2020 |
Failed: Building - Final |
Need #1blower Door Test
#2condensate 12 Inches From The House
|
Matt Forsyth |
6/30/2020 |
Passed: Building - Final |
|
Matt Forsyth |
7/7/2020 |