Columbia County is committed to ensuring accessibility to this website regardless of disability. If anyone encounters a feature on this website that is inaccessible due to a disability, please contact the County Manger’s Office and the Columbia County Board of County Commissioners at (386) 758-1005. You may also email that office at patrick_weaver@columbiacountyfla.com and provide a brief description of the inaccessible feature. The County will either correct the inaccessible feature or, if correction is not possible due to technical limitations, provide the desired information through alternative means.

Skip to content

Columbia County, FL | Permit Details

Mobile Home Permit

Address 400 SE PIUTE WAY
LAKE CITY, FL 32025
Parcel #: 08301-012
Acres: 1.20
Owner: Sherry Osteen
Subdivision: Piute Unr
Zoning: RSFMH-2
Flood Zone: AH
District: 5
Application #: 43717
Permit #: 000038902
Related Permit:
Submitted: Monday, October 7, 2019
Issued: Friday, November 15, 2019
Expires: Monday, May 18, 2020
Completed:
Status: Permit Issued
Septic Release? Yes
Notes:
ZONING CHANGE Z-0586 APPROVED 11/7/19, MINIMUM FINISHED FLOOR ELEVATION IS 104.5', NEED ELEVATION CERTIFICATE ON FINISHED CONSTRUCTION INCLUDING EQUIPMENT BEFORE POWER RELEASE
Job Details
Finished floor requirement
Fema map number 12023C0313D
Mobile Home is a: Double Wide
Year Built 2019
Width (Ft.In) 32
Length (Ft.In) 46
Driveway access to home: Existing Drive
Installation Decal # 64650
Septic # (00-0000) or (X00-000) 19-0731
Dev Permit # F023-
Are you applying for a 5 year temporary permit? No
Serial # LOGHA34188
Wind Zone? 2
Residential or Commercial Use? Residential
Review Notes
11/6/2019 Point Review - Status Cleared
11/15/2019 Permit Issued
Contractors
Name/ Business License Title Role
Brandy Hall

County License & State License Expired.
IH1126663 Mh Installer (ih) Contractor
Inspections
Inspection Notes Performed By Date
Passed: Mobile Home - Mobile Home Set-Up Final Tommy Matthews 11/20/2019
Passed: Engineering - Setbacks Tommy Matthews 11/20/2019
Release to power company Mg 11/27/2019
Septic Release Inspection Before The Co Is Released We Need The Elevation Certificate Hardcopy Health Dept 11/27/2019
Documents